blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3377350

EP3377350 - DEVICE FOR LOCKING A RECHARGEABLE ELECTRICAL ENERGY STORAGE MODULE, AND ELECTRIC VEHICLE PROVIDED WITH SUCH A DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.08.2020
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  13.09.2019
FormerGrant of patent is intended
Status updated on  14.05.2019
FormerRequest for examination was made
Status updated on  24.08.2018
FormerThe international publication has been made
Status updated on  26.05.2017
Formerunknown
Status updated on  13.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Bluebus
Odet
29500 Ergue Gaberic / FR
[2018/39]
Inventor(s)01 / BESSON, Patrice
236 Route de Simandres
69970 Marennes / FR
 [2018/39]
Representative(s)IPAZ
Bâtiment Platon
Parc Les Algorithmes
91190 Saint-Aubin / FR
[N/P]
Former [2018/39]IPAZ
Parc Les Algorithmes, Bâtiment Platon
CS 70003 Saint-Aubin
91192 Gif-sur-Yvette Cedex / FR
Application number, filing date16805304.909.11.2016
[2018/39]
WO2016EP77113
Priority number, dateFR2015006098316.11.2015         Original published format: FR 1560983
[2018/39]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2017084937
Date:26.05.2017
Language:FR
[2017/21]
Type: A1 Application with search report 
No.:EP3377350
Date:26.09.2018
Language:FR
The application published by WIPO in one of the EPO official languages on 26.05.2017 takes the place of the publication of the European patent application.
[2018/39]
Type: B1 Patent specification 
No.:EP3377350
Date:16.10.2019
Language:FR
[2019/42]
Search report(s)International search report - published on:EP26.05.2017
ClassificationIPC:B60K1/04
[2018/39]
CPC:
B60K1/04 (EP,US); B60K2001/0477 (EP); B60K2001/0494 (EP);
B60Y2200/143 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/39]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VORRICHTUNG ZUM VERRIEGELN EINES WIEDERAUFLADBAREN ELEKTRISCHEN ENERGIESPEICHERMODULS UND ELEKTRISCHES FAHRZEUG MIT EINER DERARTIGEN VORRICHTUNG[2018/39]
English:DEVICE FOR LOCKING A RECHARGEABLE ELECTRICAL ENERGY STORAGE MODULE, AND ELECTRIC VEHICLE PROVIDED WITH SUCH A DEVICE[2018/39]
French:DISPOSITIF DE VERROUILLAGE D'UN MODULE DE STOCKAGE D'ENERGIE ELECTRIQUE RECHARGEABLE ET VEHICULE ELECTRIQUE MUNI D'UN TEL DISPOSITIF[2018/39]
Entry into regional phase06.06.2017National basic fee paid 
06.06.2017Designation fee(s) paid 
06.06.2017Examination fee paid 
Examination procedure06.06.2017Examination requested  [2018/39]
06.06.2017Date on which the examining division has become responsible
15.05.2019Communication of intention to grant the patent
03.09.2019Fee for grant paid
03.09.2019Fee for publishing/printing paid
03.09.2019Receipt of the translation of the claim(s)
Opposition(s)17.07.2020No opposition filed within time limit [2020/39]
Fees paidRenewal fee
21.11.2018Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.11.2016
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MK16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
IE09.11.2019
LU09.11.2019
BE30.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
[2022/32]
Former [2022/27]HU09.11.2016
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
IE09.11.2019
LU09.11.2019
BE30.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/34]HU09.11.2016
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE09.11.2019
LU09.11.2019
BE30.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/32]HU09.11.2016
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE09.11.2019
LU09.11.2019
BE30.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/26]AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE09.11.2019
LU09.11.2019
BE30.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/51]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE09.11.2019
LU09.11.2019
BE30.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/46]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
IE09.11.2019
LU09.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/37]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
LU09.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/36]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
LU09.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/35]AL16.10.2019
AT16.10.2019
CZ16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
LU09.11.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/32]AL16.10.2019
AT16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/25]AT16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/24]AT16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/23]AT16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
Former [2020/22]FI16.10.2019
LT16.10.2019
NL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
PT17.02.2020
Former [2020/21]NL16.10.2019
NO16.01.2020
Former [2020/20]NL16.10.2019
Cited inInternational search[A]WO9312945  (IAD DESIGN LIMITED [GB]) [A] 7,8 * figure - *;
 [A]JPH11115504  (FUJI HEAVY IND LTD) [A] 1-14* figure - *;
 [A]FR2943970  (RENAULT SAS [FR]) [A] 1-3,7,8 * figure - *;
 [A]FR2962943  (RENAULT SA [FR]) [A] 1-14 * figure - *;
 [A]DE102012218809  (SCHAEFFLER TECHNOLOGIES AG [DE]) [A] 10 * figure - *;
 [A]DE102012208499  (SCHAEFFLER TECHNOLOGIES AG [DE]) [A] 1-14 * figure - *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.