EP3323189 - BRUSHLESS MOTOR HAVING TERMINAL FIXING BLOCKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.05.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 03.06.2022 | ||
Former | Grant of patent is intended Status updated on 03.02.2022 | ||
Former | Examination is in progress Status updated on 05.04.2020 | ||
Former | Request for examination was made Status updated on 20.04.2018 | ||
Former | The international publication has been made Status updated on 20.01.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Bergstrom, Inc. 2390 Blackhawk Road P.O.Box 6007 Rockford, IL 61125-6007 / US | [2018/21] | Inventor(s) | 01 /
LI, Gengxiang 28 Aoyuan Road New District Changzhou Jiangsu 213022 / CN | 02 /
YANG, Kuilin 28 Aoyuan Road New District Changzhou Jiangsu 213022 / CN | 03 /
WANG, Lei 28 Aoyuan Road New District Changzhou Jiangsu 213022 / CN | [2018/21] | Representative(s) | Eisenführ Speiser Patentanwälte Rechtsanwälte PartGmbB Johannes-Brahms-Platz 1 20355 Hamburg / DE | [2018/21] | Application number, filing date | 16825198.1 | 14.07.2016 | [2018/21] | WO2016US42329 | Priority number, date | CN201510420854 | 16.07.2015 Original published format: CN201510420854 | [2018/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017011684 | Date: | 19.01.2017 | Language: | EN | [2017/03] | Type: | A1 Application with search report | No.: | EP3323189 | Date: | 23.05.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.01.2017 takes the place of the publication of the European patent application. | [2018/21] | Type: | B1 Patent specification | No.: | EP3323189 | Date: | 06.07.2022 | Language: | EN | [2022/27] | Search report(s) | International search report - published on: | US | 19.01.2017 | (Supplementary) European search report - dispatched on: | EP | 03.01.2019 | Classification | IPC: | H02K1/16, H02K3/28, H02K3/46, H02K15/085, H02K3/52 | [2019/04] | CPC: |
H02K3/522 (EP,US);
H02K21/16 (EP,US);
H02K2201/03 (EP,US);
H02K2213/03 (EP,US);
H02K29/03 (EP,US)
|
Former IPC [2018/21] | H02K1/16, H02K3/28, H02K3/46, H02K15/085 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BÜRSTENLOSER MOTOR MIT ANSCHLUSSBEFESTIGUNGSKASTEN | [2018/21] | English: | BRUSHLESS MOTOR HAVING TERMINAL FIXING BLOCKS | [2018/21] | French: | MOTEUR SANS BALAI DOTÉ DE BLOCS DE FIXATION DE BORNE | [2018/21] | Entry into regional phase | 16.02.2018 | National basic fee paid | 16.02.2018 | Search fee paid | 16.02.2018 | Designation fee(s) paid | 16.02.2018 | Examination fee paid | Examination procedure | 13.02.2018 | Date on which the examining division has become responsible | 16.02.2018 | Examination requested [2018/21] | 27.06.2019 | Amendment by applicant (claims and/or description) | 08.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 14.08.2020 | Reply to a communication from the examining division | 10.02.2021 | Despatch of a communication from the examining division (Time limit: M02) | 08.04.2021 | Reply to a communication from the examining division | 04.02.2022 | Communication of intention to grant the patent | 31.05.2022 | Fee for grant paid | 31.05.2022 | Fee for publishing/printing paid | 31.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.04.2023 | No opposition filed within time limit [2023/24] | Fees paid | Renewal fee | 31.07.2018 | Renewal fee patent year 03 | 31.07.2019 | Renewal fee patent year 04 | 31.07.2020 | Renewal fee patent year 05 | 02.08.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.07.2016 | AL | 06.07.2022 | AT | 06.07.2022 | BG | 06.07.2022 | CY | 06.07.2022 | CZ | 06.07.2022 | DK | 06.07.2022 | EE | 06.07.2022 | ES | 06.07.2022 | FI | 06.07.2022 | HR | 06.07.2022 | IT | 06.07.2022 | LT | 06.07.2022 | LV | 06.07.2022 | MC | 06.07.2022 | MK | 06.07.2022 | MT | 06.07.2022 | PL | 06.07.2022 | RO | 06.07.2022 | RS | 06.07.2022 | SE | 06.07.2022 | SI | 06.07.2022 | SK | 06.07.2022 | SM | 06.07.2022 | TR | 06.07.2022 | IE | 14.07.2022 | LU | 14.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | NO | 06.10.2022 | GR | 07.10.2022 | IS | 06.11.2022 | PT | 07.11.2022 | [2024/42] |
Former [2024/34] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
BG | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
TR | 06.07.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/29] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
TR | 06.07.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/22] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/20] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/18] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/11] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
IT | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/37] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/33] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 14.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/29] | AL | 06.07.2022 | |
AT | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/25] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/23] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/22] | AT | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/21] | DK | 06.07.2022 | |
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/20] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/12] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/11] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/10] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/09] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/08] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | Documents cited: | Search | [I]US2005231050 (SASAKI KENJI [JP], et al) [I] 1,5,6 * paragraph [0039] - paragraph [0046]; figures 1,2 ** paragraph [0065] - paragraph [0068]; figures 8-10 *; | [X]US2011316365 (KIM BYOUNG SOO [KR]) [X] 1-5 * paragraph [0150]; figures 3,4,9 * * paragraph [0164]; figure 12 * * paragraph [0186] * | International search | [Y]US6992419 (KIM PYUNG KYU [KR], et al) [Y] 5* , Fig 6C, 6D, abstract, col 14, In 50-57 *; | [Y]US2013181556 (LI WENBING [CN], et al) [Y] 1-6 * , Fig 5, 6, abstract, para [0002], [0022]-[0028] *; | [Y]US8492948 (WANG WILLIAM [US], et al) [Y] 1-6 * , Fig 1, 3, 5, 16, 17, abstrac!, coI 1, In 5-28, col 5, In 49-58, col 8, In 17-42, col 9, In 13-21, col 10, In 28-47, col 15, In 10-13 *; | [Y] - "MAG-MATE Connector With Multispring Pin.", TYCO ELECTRONICS CORPORATION, (20130000), pages 1 - 2, URL: http://datasheet.octopart.com/1247003-2-TE-Connectivity-datasheet- 14918754.pdf, XP055347158 [Y] 3 | Examination | US2011037331 | by applicant | US2005231050 | US2011316365 |