EP3305035 - METHOD AND SYSTEM FOR CONTROLLING THE SWITCHING ON OF LIGHTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.12.2021 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 01.01.2021 | ||
Former | Grant of patent is intended Status updated on 22.11.2020 | ||
Former | Examination is in progress Status updated on 30.03.2018 | ||
Former | Request for examination was made Status updated on 09.03.2018 | ||
Former | The international publication has been made Status updated on 07.07.2017 | ||
Former | unknown Status updated on 10.02.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Franciosa, Marco Via Mainetti 5/3 16148 Genova / IT | [2018/15] | Inventor(s) | 01 /
see applicant ... | [2018/15] | Representative(s) | Bottino, Giovanni ARBO Srl Via Colombo, 11/29 16121 Genova / IT | [2018/15] | Application number, filing date | 16831836.8 | 30.12.2016 | [2018/15] | WO2016IB58100 | Priority number, date | IT2015UB09817 | 31.12.2015 Original published format: IT UB20159817 | [2018/15] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017115326 | Date: | 06.07.2017 | Language: | EN | [2017/27] | Type: | A1 Application with search report | No.: | EP3305035 | Date: | 11.04.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.07.2017 takes the place of the publication of the European patent application. | [2018/15] | Type: | B1 Patent specification | No.: | EP3305035 | Date: | 03.02.2021 | Language: | EN | [2021/05] | Search report(s) | International search report - published on: | EP | 06.07.2017 | Classification | IPC: | H05B45/00, H05B47/155, H05B47/19 | [2020/51] | CPC: |
H05B45/00 (EP,US);
H05B45/20 (EP,US);
H05B47/155 (EP,US);
H05B47/19 (EP,US);
H05B47/1965 (EP)
|
Former IPC [2018/15] | H05B37/02, H05B33/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND SYSTEM ZUR STEUERUNG DES EINSCHALTENS VON LICHTERN | [2018/15] | English: | METHOD AND SYSTEM FOR CONTROLLING THE SWITCHING ON OF LIGHTS | [2018/15] | French: | PROCÉDÉ ET SYSTÈME DE COMMANDE DE MISE EN MARCHE DE LAMPES | [2018/15] | Entry into regional phase | 02.01.2018 | National basic fee paid | 02.01.2018 | Designation fee(s) paid | 02.01.2018 | Examination fee paid | Examination procedure | 02.01.2018 | Amendment by applicant (claims and/or description) | 02.01.2018 | Examination requested [2018/15] | 02.01.2018 | Date on which the examining division has become responsible | 29.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 30.05.2018 | Reply to a communication from the examining division | 30.06.2018 | Observations by third parties | 11.09.2018 | Despatch of a communication from the examining division (Time limit: M06) | 14.03.2019 | Reply to a communication from the examining division | 27.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 29.10.2019 | Reply to a communication from the examining division | 20.01.2020 | Despatch of a communication from the examining division (Time limit: M06) | 20.07.2020 | Reply to a communication from the examining division | 06.11.2020 | Cancellation of oral proceeding that was planned for 01.09.2021 | 23.11.2020 | Communication of intention to grant the patent | 09.12.2020 | Fee for grant paid | 09.12.2020 | Fee for publishing/printing paid | 09.12.2020 | Receipt of the translation of the claim(s) | 01.09.2021 | Date of oral proceedings (cancelled) | Opposition(s) | 04.11.2021 | No opposition filed within time limit [2022/02] | Fees paid | Renewal fee | 31.12.2018 | Renewal fee patent year 03 | 26.12.2019 | Renewal fee patent year 04 | 24.12.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.12.2016 | AL | 03.02.2021 | CY | 03.02.2021 | EE | 03.02.2021 | IT | 03.02.2021 | LT | 03.02.2021 | LV | 03.02.2021 | MC | 03.02.2021 | MK | 03.02.2021 | MT | 03.02.2021 | RO | 03.02.2021 | RS | 03.02.2021 | SI | 03.02.2021 | SK | 03.02.2021 | SM | 03.02.2021 | TR | 03.02.2021 | BG | 03.05.2021 | GR | 04.05.2021 | IS | 03.06.2021 | PT | 04.06.2021 | [2024/41] |
Former [2024/29] | HU | 30.12.2016 | |
AL | 03.02.2021 | ||
CY | 03.02.2021 | ||
EE | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
MK | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
TR | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2024/22] | HU | 30.12.2016 | |
AL | 03.02.2021 | ||
CY | 03.02.2021 | ||
EE | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
MK | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2023/30] | HU | 30.12.2016 | |
AL | 03.02.2021 | ||
CY | 03.02.2021 | ||
EE | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2023/29] | HU | 30.12.2016 | |
AL | 03.02.2021 | ||
EE | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/33] | AL | 03.02.2021 | |
EE | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/23] | AL | 03.02.2021 | |
EE | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/13] | AL | 03.02.2021 | |
EE | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2022/10] | AL | 03.02.2021 | |
EE | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2022/07] | AL | 03.02.2021 | |
EE | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/50] | EE | 03.02.2021 | |
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/48] | EE | 03.02.2021 | |
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RS | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/46] | LT | 03.02.2021 | |
LV | 03.02.2021 | ||
RS | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/42] | LT | 03.02.2021 | |
LV | 03.02.2021 | ||
RS | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/37] | LT | 03.02.2021 | |
LV | 03.02.2021 | ||
RS | 03.02.2021 | ||
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/36] | LT | 03.02.2021 | |
BG | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/33] | LT | 03.02.2021 | |
PT | 04.06.2021 | Cited in | International search | [A]WO2014027275 (KONINKL PHILIPS NV [NL]); | [A]US2015102731 (ALTAMURA STEVEN J [US], et al) | Examination | WO2007099318 |