blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3304819

EP3304819 - METHOD AND APPARATUS FOR NETWORK SLICING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.08.2021
Database last updated on 15.07.2024
FormerThe patent has been granted
Status updated on  04.09.2020
FormerGrant of patent is intended
Status updated on  06.05.2020
FormerExamination is in progress
Status updated on  23.10.2019
FormerRequest for examination was made
Status updated on  09.03.2018
FormerThe international publication has been made
Status updated on  04.03.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2018/15]
Inventor(s)01 / ZHANG, Hang
24 Gardengate Way
Nepean, Ontario K2G 5Z1 / CA
02 / LI, Xu
309 Lecanto Terrace
Nepean, Ontario K2J 0M4 / CA
 [2018/15]
Representative(s)Thun, Clemens
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Karlstraße 7
80333 München / DE
[N/P]
Former [2018/15]Thun, Clemens
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Sonnenstraße 33
80331 München / DE
Application number, filing date16838539.119.08.2016
[2018/15]
WO2016CN96074
Priority number, dateUS201562208118P21.08.2015         Original published format: US 201562208118 P
US20161518307515.06.2016         Original published format: US201615183075
[2018/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017032280
Date:02.03.2017
Language:EN
[2017/09]
Type: A1 Application with search report 
No.:EP3304819
Date:11.04.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 02.03.2017 takes the place of the publication of the European patent application.
[2018/15]
Type: B1 Patent specification 
No.:EP3304819
Date:07.10.2020
Language:EN
[2020/41]
Search report(s)International search report - published on:CN02.03.2017
(Supplementary) European search report - dispatched on:EP04.05.2018
ClassificationIPC:H04L12/24
[2018/15]
CPC:
H04L41/0895 (EP); H04L41/0896 (US); H04L41/0897 (EP);
H04L41/12 (US); H04L41/122 (EP); H04L41/40 (EP);
H04L41/5048 (EP,US); H04L41/5051 (EP); H04L41/0806 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/15]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM NETZWERK-SLICING[2018/15]
English:METHOD AND APPARATUS FOR NETWORK SLICING[2018/15]
French:PROCÉDÉ ET APPAREIL POUR UNE SEGMENTATION DE RÉSEAU[2018/15]
Entry into regional phase05.01.2018National basic fee paid 
05.01.2018Search fee paid 
05.01.2018Designation fee(s) paid 
05.01.2018Examination fee paid 
Examination procedure05.01.2018Examination requested  [2018/15]
05.01.2018Date on which the examining division has become responsible
15.10.2018Amendment by applicant (claims and/or description)
28.10.2019Despatch of a communication from the examining division (Time limit: M04)
21.01.2020Reply to a communication from the examining division
07.05.2020Communication of intention to grant the patent
27.07.2020Receipt of the translation of the claim(s)
10.08.2020Fee for grant paid
10.08.2020Fee for publishing/printing paid
Opposition(s)08.07.2021No opposition filed within time limit [2021/37]
Fees paidRenewal fee
27.08.2018Renewal fee patent year 03
29.08.2019Renewal fee patent year 04
26.08.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.08.2016
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
MK07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
[2024/22]
Former [2023/30]HU19.08.2016
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2023/29]HU19.08.2016
AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2022/23]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2022/18]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2022/10]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2021/50]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/48]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/45]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/37]AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/36]AT07.10.2020
CZ07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/35]AT07.10.2020
CZ07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/34]AT07.10.2020
CZ07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/33]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/32]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/30]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/28]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/25]AT07.10.2020
ES07.10.2020
FI07.10.2020
LV07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/23]AT07.10.2020
FI07.10.2020
LV07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2021/22]FI07.10.2020
RS07.10.2020
NO07.01.2021
PT08.02.2021
Former [2021/21]FI07.10.2020
PT08.02.2021
Former [2021/20]FI07.10.2020
Documents cited:Search[XI]WO2014173263  (HANGZHOU H3C TECH CO LTD [CN]) [X] 1-9 * abstract;; figures 1-24 * * paragraph [0029] - paragraph [0035] * * paragraph [0040] - paragraph [00201] * [I] 10-15;
 [A]WO2015071888  (ERICSSON TELEFON AB L M [SE], et al) [A] 1-15 * abstract;; figures 1-4 * * page 3, line 21 - page 5, line 15 * * page 15, line 1 - page 18, line 15 *;
 [A]  - "Network Functions Virtualisation (NFV); Management and Orchestration", GROUP SPECIFICATION, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, (20141201), vol. NFV MAN, no. V1.1.1, XP014235740 [A] 1-15 * the whole document *
 [A]  - "Network Functions Virtualisation (NFV); Ecosystem; Report on SDN Usage in NFV Architectural Framework;Draft ETSI GS NFV-EVE005", ETSI DRAFT; DRAFT ETSI GS NFV-EVE005, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, (20150814), vol. ISG - NFV, no. V0.1.0, pages 1 - 119, XP014255931 [A] 1-15 * the whole document *
International search[A]US2011004456  (PARK KEUN MO [KR], et al) [A] 1-25 * the whole document *;
 [A]CN103236945  (BEIJING INTERNET INST CO LTD) [A] 1-25 * the whole document *;
 [A]CN103905523  (INSPUR BEIJING ELECT INF IND) [A] 1-25 * the whole document *;
 [A]WO2015021248  (NEC LAB AMERICA INC [US]) [A] 1-25* the whole document *;
 [A]CN104639653  (BEIJING HANDSCAPE TECHNOLOGY CO LTD) [A] 1-25 * paragraphs[0017]-[0088] *
Examination   - YOUNG LEE HUAWEI DANIEL KING LANCASTER UNIVERSITY M BOUCADAIR FRANCE TELECOM R JING CHINA TELECOM L CONTRERAS MURILLO, "Problem Statement for Abstraction and Control of Transport Networks; draft-leeking-teas-actn-problem-statement-00.txt", PROBLEM STATEMENT FOR ABSTRACTION AND CONTROL OF TRANSPORT NETWORKS; DRAFT-LEEKING-TEAS-ACTN-PROBLEM-STATEMENT-00.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARDWORKINGDRAFT, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLA, (20150610), pages 1 - 25, XP015106619
by applicantWO2014173263
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.