EP3395043 - RULE-BASED NETWORK-THREAT DETECTION FOR ENCRYPTED COMMUNICATIONS [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 01.01.2021 Database last updated on 12.11.2024 | |
Former | Grant of patent is intended Status updated on 09.08.2020 | ||
Former | Request for examination was made Status updated on 28.09.2018 | ||
Former | The international publication has been made Status updated on 05.07.2017 | ||
Former | unknown Status updated on 10.03.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Centripetal Limited Galway Technology Centre Mervue Business Park Galway / IE | [2023/14] |
Former [2018/44] | For all designated states Centripetal Networks, Inc. 2251 Corporate Park Drive, Suite 150 Herndon, VA 20171 / US | Inventor(s) | 01 /
AHN, David K. c/o Centripetal Networks Inc. 2251 Corporate Park Drive Suite 150 Herndon, Virginia 20171 / US | 02 /
MOORE, Sean c/o Centripetal Networks Inc. 2251 Corporate Park Drive Suite 150 Herndon, Virginia 20171 / US | 03 /
DISABELLO, Douglas M. c/o Centripetal Networks Inc. 2251 Corporate Park Drive Suite 150 Herndon, Virginia 20171 / US | [2018/44] | Representative(s) | MFG Patentanwälte Meyer-Wildhagen Meggle-Freund Gerhard PartG mbB, et al Amalienstraße 62 80799 München / DE | [N/P] |
Former [2018/44] | Derry, Paul Stefan, et al Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | Application number, filing date | 16840343.4 | 16.12.2016 | [2018/44] | WO2016US67111 | Priority number, date | US201514757638 | 23.12.2015 Original published format: US201514757638 | [2018/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017112535 | Date: | 29.06.2017 | Language: | EN | [2017/26] | Type: | A1 Application with search report | No.: | EP3395043 | Date: | 31.10.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.06.2017 takes the place of the publication of the European patent application. | [2018/44] | Type: | B1 Patent specification | No.: | EP3395043 | Date: | 03.02.2021 | Language: | EN | [2021/05] | Search report(s) | International search report - published on: | EP | 29.06.2017 | Classification | IPC: | H04L29/06 | [2018/44] | CPC: |
H04L63/0227 (EP,US);
H04L63/1425 (US);
H04L61/4511 (US);
H04L63/0263 (US);
H04L63/0281 (US);
H04L63/1416 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | REGELBASIERTE NETZWERK-BEDROHUNGSERKENNUNG FÜR VERSCHLÜSSELTE KOMMUNIKATION | [2018/44] | English: | RULE-BASED NETWORK-THREAT DETECTION FOR ENCRYPTED COMMUNICATIONS | [2018/44] | French: | DÉTECTION DE MENACE DE RÉSEAU À BASE DE RÈGLES POUR DES COMMUNICATIONS CHIFFRÉES | [2018/44] | Entry into regional phase | 23.07.2018 | National basic fee paid | 23.07.2018 | Designation fee(s) paid | 23.07.2018 | Examination fee paid | Examination procedure | 23.07.2018 | Examination requested [2018/44] | 23.07.2018 | Date on which the examining division has become responsible | 13.02.2019 | Amendment by applicant (claims and/or description) | 10.08.2020 | Communication of intention to grant the patent | 17.12.2020 | Fee for grant paid | 17.12.2020 | Fee for publishing/printing paid | 17.12.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21153219.7 / EP3832978 | EP21209420.5 / EP3979559 | EP23164778.5 / EP4224793 | Opposition(s) | Opponent(s) | 01
03.11.2021
05.11.2021
ADMISSIBLE Cisco Systems GmbH Parkring 20 85748 Garching / DE Opponent's representative Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | 02
23.11.2021
30.11.2021
INTERVENTION ADMISSIBLE Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134 / US Opponent's representative Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2022/01] |
Former [2021/52] | |||
Opponent(s) | 01
03.11.2021
05.11.2021
ADMISSIBLE Cisco Systems GmbH Parkring 20 85748 Garching / DE Opponent's representative Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | ||
02
23.11.2021
Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134 / US Opponent's representative Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | |||
Former [2021/49] | |||
Opponent(s) | 01
03.11.2021
Cisco Systems GmbH Parkring 20 85748 Garching / DE Opponent's representative Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | 14.12.2021 | Invitation to proprietor to file observations on the notice of opposition | 24.06.2022 | Reply of patent proprietor to notice(s) of opposition | 08.02.2024 | Date of oral proceedings | 29.02.2024 | Despatch of minutes of oral proceedings | 29.02.2024 | Despatch of communication that the patent will be revoked | Appeal following opposition | 14.03.2024 | Appeal received No. T0405/24 | 14.03.2024 | Payment of appeal fee | 27.06.2024 | Statement of grounds filed | Fees paid | Renewal fee | 31.12.2018 | Renewal fee patent year 03 | 27.12.2019 | Renewal fee patent year 04 | 28.12.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.12.2016 | AL | 03.02.2021 | AT | 03.02.2021 | CY | 03.02.2021 | CZ | 03.02.2021 | DK | 03.02.2021 | EE | 03.02.2021 | ES | 03.02.2021 | FI | 03.02.2021 | HR | 03.02.2021 | IT | 03.02.2021 | LT | 03.02.2021 | LV | 03.02.2021 | MC | 03.02.2021 | MK | 03.02.2021 | MT | 03.02.2021 | NL | 03.02.2021 | PL | 03.02.2021 | RO | 03.02.2021 | RS | 03.02.2021 | SE | 03.02.2021 | SI | 03.02.2021 | SK | 03.02.2021 | SM | 03.02.2021 | TR | 03.02.2021 | BG | 03.05.2021 | NO | 03.05.2021 | GR | 04.05.2021 | IS | 03.06.2021 | PT | 04.06.2021 | IE | 16.12.2021 | LU | 16.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/42] |
Former [2024/29] | HU | 16.12.2016 | |
AL | 03.02.2021 | ||
AT | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
MK | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
TR | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
IE | 16.12.2021 | ||
LU | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2024/22] | HU | 16.12.2016 | |
AL | 03.02.2021 | ||
AT | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
MK | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
IE | 16.12.2021 | ||
LU | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/33] | HU | 16.12.2016 | |
AL | 03.02.2021 | ||
AT | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
IE | 16.12.2021 | ||
LU | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/30] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
IE | 16.12.2021 | ||
LU | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
IE | 16.12.2021 | ||
LU | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
IE | 16.12.2021 | ||
LU | 16.12.2021 | ||
BE | 31.12.2021 | ||
Former [2022/48] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
IE | 16.12.2021 | ||
LU | 16.12.2021 | ||
Former [2022/46] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
LU | 16.12.2021 | ||
Former [2022/33] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/23] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/13] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
IS | 22.12.2021 | ||
Former [2022/08] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/07] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/50] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/49] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/48] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/46] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/42] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/39] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/38] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/37] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RS | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/36] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/35] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
NO | 03.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/33] | FI | 03.02.2021 | |
LT | 03.02.2021 | ||
NO | 03.05.2021 | ||
PT | 04.06.2021 | Cited in | International search | [X]US2014283004 (MOORE SEAN [US]); | [X]US2014317397 (MARTINI PAUL MICHAEL [US]) | Opposition | US8161547 |