EP3358397 - OPTICAL MODULATOR, OPTICAL TRANSMITTER, AND OPTICAL MODULATION METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.01.2021 | ||
Former | Grant of patent is intended Status updated on 13.10.2020 | ||
Former | Request for examination was made Status updated on 06.07.2018 | ||
Former | The international publication has been made Status updated on 08.04.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2018/32] | Inventor(s) | 01 /
KOGA, Tadashi c/o NEC CORPORATION 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2018/32] | Representative(s) | Reeve, Nicholas Edward Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [2018/32] | Application number, filing date | 16850621.0 | 15.09.2016 | [2018/32] | WO2016JP04220 | Priority number, date | JP20150189327 | 28.09.2015 Original published format: JP 2015189327 | [2018/32] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017056440 | Date: | 06.04.2017 | Language: | JA | [2017/14] | Type: | A1 Application with search report | No.: | EP3358397 | Date: | 08.08.2018 | Language: | EN | [2018/32] | Type: | B1 Patent specification | No.: | EP3358397 | Date: | 17.02.2021 | Language: | EN | [2021/07] | Search report(s) | International search report - published on: | JP | 06.04.2017 | (Supplementary) European search report - dispatched on: | EP | 11.09.2018 | Classification | IPC: | G02F1/01, H04B10/556 | [2018/32] | CPC: |
G02F1/0123 (EP,US);
G02F1/225 (EP,US);
H04B10/50575 (EP);
H04B10/541 (US);
H04B10/556 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | OPTISCHER MODULATOR, OPTISCHER SENDER UND OPTISCHES MODULATIONSVERFAHREN | [2018/32] | English: | OPTICAL MODULATOR, OPTICAL TRANSMITTER, AND OPTICAL MODULATION METHOD | [2018/32] | French: | MODULATEUR OPTIQUE, ÉMETTEUR OPTIQUE, ET PROCÉDÉ DE MODULATION OPTIQUE | [2018/32] | Entry into regional phase | 13.03.2018 | Translation filed | 13.03.2018 | National basic fee paid | 13.03.2018 | Search fee paid | 13.03.2018 | Designation fee(s) paid | 13.03.2018 | Examination fee paid | Examination procedure | 13.03.2018 | Examination requested [2018/32] | 13.03.2018 | Date on which the examining division has become responsible | 28.03.2019 | Amendment by applicant (claims and/or description) | 14.10.2020 | Communication of intention to grant the patent | 05.01.2021 | Fee for grant paid | 05.01.2021 | Fee for publishing/printing paid | 05.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] | Fees paid | Renewal fee | 05.06.2018 | Renewal fee patent year 03 | 13.09.2019 | Renewal fee patent year 04 | 14.09.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.09.2016 | AL | 17.02.2021 | AT | 17.02.2021 | CY | 17.02.2021 | CZ | 17.02.2021 | DK | 17.02.2021 | EE | 17.02.2021 | ES | 17.02.2021 | HR | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | MK | 17.02.2021 | MT | 17.02.2021 | NL | 17.02.2021 | PL | 17.02.2021 | RO | 17.02.2021 | RS | 17.02.2021 | SE | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | SM | 17.02.2021 | BG | 17.05.2021 | NO | 17.05.2021 | GR | 18.05.2021 | IS | 17.06.2021 | PT | 17.06.2021 | GB | 15.09.2021 | IE | 15.09.2021 | LU | 15.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/42] |
Former [2024/22] | HU | 15.09.2016 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
MK | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
GB | 15.09.2021 | ||
IE | 15.09.2021 | ||
LU | 15.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/33] | HU | 15.09.2016 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
GB | 15.09.2021 | ||
IE | 15.09.2021 | ||
LU | 15.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
GB | 15.09.2021 | ||
IE | 15.09.2021 | ||
LU | 15.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
GB | 15.09.2021 | ||
IE | 15.09.2021 | ||
LU | 15.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
GB | 15.09.2021 | ||
IE | 15.09.2021 | ||
LU | 15.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
LU | 15.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/25] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/23] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/13] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/10] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/08] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/07] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/50] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/49] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/48] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
EE | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/46] | AT | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/42] | HR | 17.02.2021 | |
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/39] | HR | 17.02.2021 | |
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/38] | HR | 17.02.2021 | |
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/37] | HR | 17.02.2021 | |
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
RS | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/36] | HR | 17.02.2021 | |
LT | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/35] | HR | 17.02.2021 | |
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/33] | LT | 17.02.2021 | |
NO | 17.05.2021 | ||
PT | 17.06.2021 | Documents cited: | Search | [Y]JP2010062654 (YOKOGAWA ELECTRIC CORP) [Y] 1-9 * paragraph [0049] *; | [Y]US2013101296 (NISHIMOTO HIROSHI [JP]) [Y] 1-9 * figures 1-3 * * paragraphs [0023] - [0041] *; | [Y]US2014334829 (AKIYAMA YUICHI [JP]) [Y] 3,4 * paragraphs [0013] , [ 0014] , [ 0037] - [0039] *; | [Y]JP2015162720 (NEC CORP) [Y] 4* paragraph [0023] * | International search | [Y]JP2010062654 (YOKOGAWA ELECTRIC CORP) [Y] 1-9 * , paragraph [0049] (Family: none) *; | [Y]JP2013090292 (FUJITSU OPTICAL COMPONENTS LTD) [Y] 1-9 * , paragraphs [0017] to [0035]; fig. 1 to 3 & US 2013/0101296 A1 paragraphs [0023] to [0041]; fig. 1 to 3 & US 8811821 B2 & EP 2584718 A1 & CN 103067091 A *; | [Y]WO2013114628 (FUJITSU LTD [JP], et al) [Y] 3-4 * , paragraphs [0013], [0014], [0020] to [0022] & JP 5924349 B2 & US 2014/0334829 A1 paragraphs [0013], [0014], [0037] to [0039] & US 9350455 B2 *; | [Y]JP2015162720 (NEC CORP) [Y] 4 * , paragraph [0023] & US 2015/0244467 A1 paragraph [0033] *; | [A]US2015270905 (RASMUSSEN CHRISTIAN [US], et al) [A] 1-9* , entire text; all drawings (Family: none) *; | [PX]JP2016102870 (FUJITSU OPTICAL COMPONENTS LTD) [PX] 1-2, 5-9 * , paragraphs [0019] to [0050]; fig. 6 to 17 & US 2016/0156416 A1 paragraphs [0045] to [0077]; fig. 1 to 17 & EP 3026832 A1 & CN 105656563 A * |