blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3358397

EP3358397 - OPTICAL MODULATOR, OPTICAL TRANSMITTER, AND OPTICAL MODULATION METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.12.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  15.01.2021
FormerGrant of patent is intended
Status updated on  13.10.2020
FormerRequest for examination was made
Status updated on  06.07.2018
FormerThe international publication has been made
Status updated on  08.04.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
NEC Corporation
7-1, Shiba 5-chome Minato-ku
Tokyo 108-8001 / JP
[2018/32]
Inventor(s)01 / KOGA, Tadashi
c/o NEC CORPORATION
7-1 Shiba 5-chome
Minato-ku
Tokyo 108-8001 / JP
 [2018/32]
Representative(s)Reeve, Nicholas Edward
Reddie & Grose LLP The White Chapel Building
10 Whitechapel High Street
London E1 8QS / GB
[2018/32]
Application number, filing date16850621.015.09.2016
[2018/32]
WO2016JP04220
Priority number, dateJP2015018932728.09.2015         Original published format: JP 2015189327
[2018/32]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017056440
Date:06.04.2017
Language:JA
[2017/14]
Type: A1 Application with search report 
No.:EP3358397
Date:08.08.2018
Language:EN
[2018/32]
Type: B1 Patent specification 
No.:EP3358397
Date:17.02.2021
Language:EN
[2021/07]
Search report(s)International search report - published on:JP06.04.2017
(Supplementary) European search report - dispatched on:EP11.09.2018
ClassificationIPC:G02F1/01, H04B10/556
[2018/32]
CPC:
G02F1/0123 (EP,US); G02F1/225 (EP,US); H04B10/50575 (EP);
H04B10/541 (US); H04B10/556 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/32]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:OPTISCHER MODULATOR, OPTISCHER SENDER UND OPTISCHES MODULATIONSVERFAHREN[2018/32]
English:OPTICAL MODULATOR, OPTICAL TRANSMITTER, AND OPTICAL MODULATION METHOD[2018/32]
French:MODULATEUR OPTIQUE, ÉMETTEUR OPTIQUE, ET PROCÉDÉ DE MODULATION OPTIQUE[2018/32]
Entry into regional phase13.03.2018Translation filed 
13.03.2018National basic fee paid 
13.03.2018Search fee paid 
13.03.2018Designation fee(s) paid 
13.03.2018Examination fee paid 
Examination procedure13.03.2018Examination requested  [2018/32]
13.03.2018Date on which the examining division has become responsible
28.03.2019Amendment by applicant (claims and/or description)
14.10.2020Communication of intention to grant the patent
05.01.2021Fee for grant paid
05.01.2021Fee for publishing/printing paid
05.01.2021Receipt of the translation of the claim(s)
Opposition(s)18.11.2021No opposition filed within time limit [2022/04]
Fees paidRenewal fee
05.06.2018Renewal fee patent year 03
13.09.2019Renewal fee patent year 04
14.09.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.09.2016
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
MT17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.09.2021
IE15.09.2021
LU15.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
[2024/42]
Former [2024/22]HU15.09.2016
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.09.2021
IE15.09.2021
LU15.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/33]HU15.09.2016
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.09.2021
IE15.09.2021
LU15.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/30]AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.09.2021
IE15.09.2021
LU15.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/37]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.09.2021
IE15.09.2021
LU15.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/35]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.09.2021
IE15.09.2021
LU15.09.2021
BE30.09.2021
Former [2022/34]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
LU15.09.2021
BE30.09.2021
Former [2022/25]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/23]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/13]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/10]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/08]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/07]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/50]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/49]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/48]AT17.02.2021
CZ17.02.2021
EE17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/46]AT17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/42]HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/39]HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/38]HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/37]HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/36]HR17.02.2021
LT17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/35]HR17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Former [2021/33]LT17.02.2021
NO17.05.2021
PT17.06.2021
Documents cited:Search[Y]JP2010062654  (YOKOGAWA ELECTRIC CORP) [Y] 1-9 * paragraph [0049] *;
 [Y]US2013101296  (NISHIMOTO HIROSHI [JP]) [Y] 1-9 * figures 1-3 * * paragraphs [0023] - [0041] *;
 [Y]US2014334829  (AKIYAMA YUICHI [JP]) [Y] 3,4 * paragraphs [0013] , [ 0014] , [ 0037] - [0039] *;
 [Y]JP2015162720  (NEC CORP) [Y] 4* paragraph [0023] *
International search[Y]JP2010062654  (YOKOGAWA ELECTRIC CORP) [Y] 1-9 * , paragraph [0049] (Family: none) *;
 [Y]JP2013090292  (FUJITSU OPTICAL COMPONENTS LTD) [Y] 1-9 * , paragraphs [0017] to [0035]; fig. 1 to 3 & US 2013/0101296 A1 paragraphs [0023] to [0041]; fig. 1 to 3 & US 8811821 B2 & EP 2584718 A1 & CN 103067091 A *;
 [Y]WO2013114628  (FUJITSU LTD [JP], et al) [Y] 3-4 * , paragraphs [0013], [0014], [0020] to [0022] & JP 5924349 B2 & US 2014/0334829 A1 paragraphs [0013], [0014], [0037] to [0039] & US 9350455 B2 *;
 [Y]JP2015162720  (NEC CORP) [Y] 4 * , paragraph [0023] & US 2015/0244467 A1 paragraph [0033] *;
 [A]US2015270905  (RASMUSSEN CHRISTIAN [US], et al) [A] 1-9* , entire text; all drawings (Family: none) *;
 [PX]JP2016102870  (FUJITSU OPTICAL COMPONENTS LTD) [PX] 1-2, 5-9 * , paragraphs [0019] to [0050]; fig. 6 to 17 & US 2016/0156416 A1 paragraphs [0045] to [0077]; fig. 1 to 17 & EP 3026832 A1 & CN 105656563 A *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.