blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3357114

EP3357114 - SILICON-CARBON COMPOSITE ANODE FOR LITHIUM-]ON BATTERIES [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  16.06.2023
Database last updated on 04.11.2024
FormerRequest for examination was made
Status updated on  06.07.2018
FormerThe international publication has been made
Status updated on  08.04.2017
Most recent event   Tooltip13.08.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Elkem AS
Drammensveien 169
0277 Oslo / NO
[2018/32]
Inventor(s)01 / ANDERSEN, Hanne Flàten
Veitvetsvingen 4D
N-0595 Oslo / NO
02 / VOJE, Jorunn
Hyllebakken 15
N-4622 Kristiansand / NO
 [2018/32]
Representative(s)Zacco Norway AS
P.O. Box 488 Skøyen
0213 Oslo / NO
[N/P]
Former [2018/32]Zacco Norway AS
Haakon VII's gate 2
PO Box 2003 Vika
0125 Oslo / NO
Application number, filing date16852149.029.09.2016
[2018/32]
WO2016NO00025
Priority number, dateNO2015000127829.09.2015         Original published format: NO 20151278
[2018/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017058024
Date:06.04.2017
Language:EN
[2017/14]
Type: A1 Application with search report 
No.:EP3357114
Date:08.08.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 06.04.2017 takes the place of the publication of the European patent application.
[2018/32]
Search report(s)International search report - published on:SE06.04.2017
(Supplementary) European search report - dispatched on:EP12.04.2019
ClassificationIPC:H01M4/134, H01M4/62, H01M4/04, H01M4/133, H01M4/1393
[2019/20]
CPC:
H01M4/364 (EP,US); H01M4/386 (KR,NO); H01M4/134 (EP,KR,US);
H01M10/0525 (EP,KR,US); H01M10/0567 (EP,KR,US); H01M4/0404 (EP,US);
H01M4/0409 (KR); H01M4/0471 (KR); H01M4/133 (EP,US);
H01M4/1393 (EP,US); H01M4/1395 (EP,KR,US); H01M4/622 (EP,KR,US);
H01M4/625 (EP,KR,NO,US); H01M2004/027 (US); H01M2300/0025 (US);
Y02E60/10 (EP) (-)
Former IPC [2018/32]H01M4/134, H01M4/62
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/32]
TitleGerman:SILICIUM-KOHLENSTOFF-VERBUNDANODE FÜR LITHIUM-IONEN-BATTERIEN[2018/32]
English:SILICON-CARBON COMPOSITE ANODE FOR LITHIUM-]ON BATTERIES[2018/32]
French:ANODE COMPOSITE SILICIUM-CARBONE POUR PILES AU LITHIUM-ION[2018/32]
Entry into regional phase12.09.2017National basic fee paid 
12.09.2017Search fee paid 
12.09.2017Designation fee(s) paid 
12.09.2017Examination fee paid 
Examination procedure12.09.2017Examination requested  [2018/32]
12.09.2017Date on which the examining division has become responsible
28.10.2019Amendment by applicant (claims and/or description)
19.06.2023Despatch of a communication from the examining division (Time limit: M04)
12.09.2023Reply to a communication from the examining division
Fees paidRenewal fee
11.09.2018Renewal fee patent year 03
13.09.2019Renewal fee patent year 04
14.09.2020Renewal fee patent year 05
15.09.2021Renewal fee patent year 06
11.08.2022Renewal fee patent year 07
24.08.2023Renewal fee patent year 08
13.08.2024Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]KR20090066031  (LG CHEMICAL LTD [KR]) [A] 1-15 * abstract *;
 [A]KR101397415B  (IUCF HYU [KR]) [A] 1-15* abstract *;
 [XI]EP2919298  (BELENOS CLEAN POWER HOLDING AG [CH]) [X] 1,3,7,12,14,15 * paragraphs [0043] , [0046]; figure 2; example 1; table 1 * [I] 2,4-6,8-13;
 [E]WO2016150639  (BOSCH GMBH ROBERT [DE]) [E] 1-3,7-15 * page 14, line 15 - page 15, line 34 *
International search[A]US2010297502  (ZHU YIMIN [US], et al) [A] 1-15 * ; whole document *;
 [A]WO2012028858  (NEXEON LTD [GB], et al) [A] 1-15 * ; whole document *;
 [A]US2015056510  (CHO YU-JEONG [KR], et al) [A] 1-15 * ; whole document *;
 [PA]US2016149220  (UHM IN SUNG [KR], et al) [PA] 1-15* ; whole document *;
 [PA]US2016197352  (BLASER RACHEL [US], et al) [PA] 1-15 * ; whole document *;
 [E]WO2016150639  (BOSCH GMBH ROBERT [DE]) [E] 1-3, 7-13 * ; abstract; page 14, line 15 -page 15, line 24; page 10, line 28 - page 11, line 2; page 12, line 22 - line 29; claims 1-15 *;
 [A]  - BUQA H et al., "Study of styrene butadiene rubber and sodium methyl cellulose as binder for negative electrodes in lithium-ion batteries", Journal of Power Sources, (20060000), vol. 161, pages 617 - 622, XP027938792 [A] 1-15 * ; whole document *
 [A]  - KIM HS et al., "Electrochemical properties of carbon-coated Si/B composite anode for lithium ion batteries", JOURNAL OF POWER SOURCES, (20090000), vol. 189, pages 108 - 113, XP025982672 [A] 1-15 * ; whole document *

DOI:   http://dx.doi.org/10.1016/j.jpowsour.2008.10.045
 [A]  - KIERZEK K et al., "Towards the realistic silicon/carbon composite for Li-ion secondary battery anode", JOURNAL OF APPLIED ELECTROCHEMISTRY, (20150000), vol. 45, pages 1 - 10, XP035415942 [A] 1-15 * ; whole document *

DOI:   http://dx.doi.org/10.1007/s10800-014-0754-3
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.