EP3356708 - VALVE ASSEMBLY WITH DIRECTIONAL FLOW PATH [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.04.2022 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 21.05.2021 | ||
Former | Grant of patent is intended Status updated on 13.01.2021 | ||
Former | Examination is in progress Status updated on 24.06.2020 | ||
Former | Request for examination was made Status updated on 06.07.2018 | ||
Former | The international publication has been made Status updated on 08.04.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Repligen Corporation 41 Seyon Street, Building 1, Suite 100 Waltham, MA 02453 / US | [2021/23] |
Former [2018/32] | For all designated states Alphinity, LLC 1771 S. Sutro Terrace Carson City, NV 89706 / US | Inventor(s) | 01 /
GAGNE, Michael C. 1771 S. Sutro Terrace Carson City, Nevada 89706 / US | 02 /
CATES, Steven V. 6113 Candlewood St. Lakewood, California 90713 / US | 03 /
RICHARDS, Dean C. 5990 Fearing Street Simi Valley, California 93063 / US | 04 /
BENDON, Scott 14 Elled Road Wainfelin Pontypool Torfaen Wales South Wales NP4 6DR / GB | [2018/32] | Representative(s) | Lecomte & Partners 76-78, rue de Merl 2146 Luxembourg / LU | [2021/25] |
Former [2018/32] | Lecomte & Partners P.O. Box 1623 1016 Luxembourg / LU | Application number, filing date | 16852791.9 | 30.09.2016 | [2018/32] | WO2016US55016 | Priority number, date | US201562236007P | 01.10.2015 Original published format: US 201562236007 P | [2018/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017059370 | Date: | 06.04.2017 | Language: | EN | [2017/14] | Type: | A1 Application with search report | No.: | EP3356708 | Date: | 08.08.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.04.2017 takes the place of the publication of the European patent application. | [2018/32] | Type: | B1 Patent specification | No.: | EP3356708 | Date: | 23.06.2021 | Language: | EN | [2021/25] | Search report(s) | International search report - published on: | US | 06.04.2017 | (Supplementary) European search report - dispatched on: | EP | 31.05.2019 | Classification | IPC: | F16K11/20, F16K7/07, F16K27/00 | [2019/27] | CPC: |
F16K11/22 (EP,CN,KR,US);
F16K7/06 (CN,US);
B29C45/14614 (US);
B29C66/01 (US);
F16K25/005 (KR);
F16K27/003 (EP,CN,KR,US);
F16K27/0236 (EP,CN,US);
F16K7/07 (EP,CN,KR,US);
F16L41/03 (CN);
|
Former IPC [2018/32] | F16K11/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VENTILANORDNUNG MIT GERICHTETEM STRÖMUNGSWEG | [2018/32] | English: | VALVE ASSEMBLY WITH DIRECTIONAL FLOW PATH | [2018/32] | French: | ENSEMBLE CLAPET À CHEMIN D'ÉCOULEMENT DIRECTIONNEL | [2018/32] | Entry into regional phase | 21.03.2018 | National basic fee paid | 21.03.2018 | Search fee paid | 21.03.2018 | Designation fee(s) paid | 21.03.2018 | Examination fee paid | Examination procedure | 21.03.2018 | Examination requested [2018/32] | 21.03.2018 | Date on which the examining division has become responsible | 24.12.2019 | Amendment by applicant (claims and/or description) | 29.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 29.10.2020 | Reply to a communication from the examining division | 14.01.2021 | Communication of intention to grant the patent | 12.05.2021 | Fee for grant paid | 12.05.2021 | Fee for publishing/printing paid | 12.05.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21174692.0 / EP3896319 | Opposition(s) | 24.03.2022 | No opposition filed within time limit [2022/22] | Fees paid | Renewal fee | 21.09.2018 | Renewal fee patent year 03 | 25.09.2019 | Renewal fee patent year 04 | 22.09.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.09.2016 | AL | 23.06.2021 | AT | 23.06.2021 | CY | 23.06.2021 | CZ | 23.06.2021 | DK | 23.06.2021 | EE | 23.06.2021 | ES | 23.06.2021 | FI | 23.06.2021 | HR | 23.06.2021 | IT | 23.06.2021 | LT | 23.06.2021 | LV | 23.06.2021 | MC | 23.06.2021 | MK | 23.06.2021 | MT | 23.06.2021 | NL | 23.06.2021 | PL | 23.06.2021 | RO | 23.06.2021 | RS | 23.06.2021 | SI | 23.06.2021 | SK | 23.06.2021 | SM | 23.06.2021 | BG | 23.09.2021 | NO | 23.09.2021 | GR | 24.09.2021 | BE | 30.09.2021 | LU | 30.09.2021 | IS | 23.10.2021 | PT | 25.10.2021 | [2024/42] |
Former [2024/22] | HU | 30.09.2016 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
BE | 30.09.2021 | ||
LU | 30.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2023/33] | HU | 30.09.2016 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
BE | 30.09.2021 | ||
LU | 30.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2023/30] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
BE | 30.09.2021 | ||
LU | 30.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/36] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
BE | 30.09.2021 | ||
LU | 30.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/34] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
BE | 30.09.2021 | ||
LU | 30.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/29] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/25] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/21] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/10] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/09] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
PT | 25.10.2021 | ||
Former [2022/08] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RS | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2022/07] | AT | 23.06.2021 | |
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RS | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/51] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/49] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/47] | FI | 23.06.2021 | |
LT | 23.06.2021 | ||
BG | 23.09.2021 | ||
Former [2021/46] | FI | 23.06.2021 | |
LT | 23.06.2021 | Documents cited: | Search | [A]US2006048818 (WELCH STEVEN D [US], et al); | [A]US2010288385 (GAGNE MICHAEL C [US], et al); | [A]WO2015109209 (ALPHINITY LLC [US]) | International search | [A]US3468342 (CRAFT DAVID JOHN); | [A]US3559683 (MAGUIRE JOHN); | [A]US4457339 (JUAN JUAN J S [ES], et al); | [A]US2006048818 (WELCH STEVEN D [US], et al); | [A]US2010288385 (GAGNE MICHAEL C [US], et al) | by applicant | US2010288385 |