EP3312910 - METHOD FOR MANUFACTURING ELECTRODE FOR SECONDARY BATTERY, COMPRISING PROCESS OF DRYING ELECTRODE SLURRY BY APPLYING VACUUM IN SPECIFIC DIRECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 06.05.2020 | ||
Former | Examination is in progress Status updated on 11.09.2019 | ||
Former | Request for examination was made Status updated on 23.03.2018 | ||
Former | The international publication has been made Status updated on 18.04.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states LG Chem, Ltd. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2018/17] | Inventor(s) | 01 /
DOELLE, Janis Research Park LG Chem Ltd. 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | [2018/17] | Representative(s) | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2018/17] | Application number, filing date | 16853830.4 | 12.09.2016 | [2018/17] | WO2016KR10289 | Priority number, date | KR20150141355 | 08.10.2015 Original published format: KR 20150141355 | [2018/17] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017061714 | Date: | 13.04.2017 | Language: | KO | [2017/15] | Type: | A1 Application with search report | No.: | EP3312910 | Date: | 25.04.2018 | Language: | EN | [2018/17] | Type: | B1 Patent specification | No.: | EP3312910 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | International search report - published on: | KR | 13.04.2017 | (Supplementary) European search report - dispatched on: | EP | 21.03.2018 | Classification | IPC: | H01M4/04, H01M10/04, H01M10/052, H01M2/10 | [2018/17] | CPC: |
H01M4/0404 (EP,US);
H01M10/052 (EP,US);
H01M10/058 (EP,US);
H01M4/04 (EP,US);
H01M4/1391 (US);
H01M10/0525 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINER ELEKTRODE FÜR SEKUNDÄRBATTERIE MIT TROCKNUNGSPROZESS FÜR ELEKTRODENSCHLAMM DURCH VAKUUM IN SPEZIFISCHER RICHTUNG | [2018/17] | English: | METHOD FOR MANUFACTURING ELECTRODE FOR SECONDARY BATTERY, COMPRISING PROCESS OF DRYING ELECTRODE SLURRY BY APPLYING VACUUM IN SPECIFIC DIRECTION | [2018/17] | French: | PROCÉDÉ DE FABRICATION D'ÉLECTRODE POUR ACCUMULATEUR, CONSISTANT EN UN PROCESSUS DE SÉCHAGE DE PÂTE D'ÉLECTRODE PAR APPLICATION D'UN VIDE DANS UNE DIRECTION SPÉCIFIQUE | [2018/17] | Entry into regional phase | 17.01.2018 | Translation filed | 17.01.2018 | National basic fee paid | 17.01.2018 | Search fee paid | 17.01.2018 | Designation fee(s) paid | 17.01.2018 | Examination fee paid | Examination procedure | 17.01.2018 | Examination requested [2018/17] | 17.01.2018 | Date on which the examining division has become responsible | 09.08.2018 | Amendment by applicant (claims and/or description) | 16.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 10.12.2019 | Reply to a communication from the examining division | 07.05.2020 | Communication of intention to grant the patent | 23.06.2020 | Fee for grant paid | 23.06.2020 | Fee for publishing/printing paid | 23.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 21.09.2018 | Renewal fee patent year 03 | 24.09.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.09.2016 | AL | 05.08.2020 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | IT | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | MT | 05.08.2020 | NL | 05.08.2020 | PL | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | TR | 05.08.2020 | IE | 12.09.2020 | LU | 12.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | [2022/32] |
Former [2022/27] | HU | 12.09.2016 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
MT | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
TR | 05.08.2020 | ||
IE | 12.09.2020 | ||
LU | 12.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/37] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
IE | 12.09.2020 | ||
LU | 12.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
LU | 12.09.2020 | ||
BE | 30.09.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
LU | 12.09.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
LU | 12.09.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/27] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
LU | 12.09.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/25] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | AT | 05.08.2020 | |
DK | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/12] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | ES | 05.08.2020 | |
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Documents cited: | Search | [XI]JPH07220722 (SUMITOMO CHEMICAL CO) [X] 1,12-15 * paragraph [0002] * * paragraph [0011] * * paragraph [0017] * [I] 2-11; | [XI]US2015086875 (YOSHIDA NAOKI [JP]) [X] 1,12-15 * paragraph [0003] * * paragraph [0029] * * paragraph [0134] * [I] 2-11; | [XI]JP2015173034 (TOYOTA MOTOR CORP) [X] 1,12-15 * abstract * * paragraph [0001] * * paragraph [0003] * * paragraph [0012] * * paragraph [0019] * [I] 2-11; | [XI]US2015280208 (KIMURA NAOKI [JP], et al) [X] 1,12-15 * the whole document *[I] 2-11 | International search | [A]KR100659863B (SAMSUNG SDI CO LTD [KR]) [A] 1-21 * See paragraphs [0012]-[0014] and [0047]; and claims 1-6. *; | [A]KR20130076758 (NISSAN MOTOR [JP]) [A] 1-21 * See claims 1-7. *; | [A]KR20130130292 (LG CHEMICAL LTD [KR]) [A] 1-21 * See claims 1-13. *; | [A]KR20140054840 (LG CHEMICAL LTD [KR]) [A] 1-21* See claims 1-13. *; | [A]KR20150057990 (LG CHEMICAL LTD [KR]) [A] 1-21 * See paragraphs [0031]-[0045]; and claims 1-21. * | Examination | US2012285036 |