blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3373633

EP3373633 - CHANNEL STATE MEASUREMENT PILOT CONFIGURATION METHOD AND APPARATUS, AND PARSING METHOD AND APPARATUS [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  04.02.2021
Database last updated on 29.07.2024
FormerRequest for examination was made
Status updated on  10.08.2018
FormerThe international publication has been made
Status updated on  13.05.2017
Most recent event   Tooltip25.05.2024New entry: Despatch of examination report + time limit 
Applicant(s)For all designated states
ZTE Corporation
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen, Guangdong 518057 / CN
[2018/37]
Inventor(s)01 / LI, Yong
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
02 / CHEN, Yijian
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
03 / LI, YU Ngok
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
04 / LU, Zhaohua
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
05 / XIAO, Huahua
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
06 / WU, Hao
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
07 / WANG, Yuxin
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
08 / CAI, Jianxing
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen Guangdong 518057 / CN
 [2018/37]
Representative(s)Regimbeau
20, rue de Chazelles
75847 Paris Cedex 17 / FR
[2018/37]
Application number, filing date16861501.128.10.2016
[2018/37]
WO2016CN103818
Priority number, dateCN20151075346706.11.2015         Original published format: CN201510753467
[2018/37]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017076233
Date:11.05.2017
Language:ZH
[2017/19]
Type: A1 Application with search report 
No.:EP3373633
Date:12.09.2018
Language:EN
[2018/37]
Search report(s)International search report - published on:CN11.05.2017
(Supplementary) European search report - dispatched on:EP25.02.2019
ClassificationIPC:H04W24/08, H04L5/00, // H04W72/04
[2019/13]
CPC:
H04L5/005 (EP,US); H04L5/0048 (CN,US); H04L5/0091 (EP,US);
H04L5/0007 (EP,US); H04L5/0016 (EP,US); H04L5/0023 (EP,US)
Former IPC [2018/37]H04W24/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/37]
TitleGerman:KONFIGURATIONSVERFAHREN UND VORRICHTUNG FÜR KANALZUSTANDSMESSPILOTSIGNAL SOWIE PARSINGVERFAHREN UND VORRICHTUNG[2018/37]
English:CHANNEL STATE MEASUREMENT PILOT CONFIGURATION METHOD AND APPARATUS, AND PARSING METHOD AND APPARATUS[2018/37]
French:PROCÉDÉ ET APPAREIL DE CONFIGURATION DE PILOTE DE MESURE D'ÉTAT DE CANAL, ET PROCÉDÉ ET APPAREIL D'ANALYSE[2018/37]
Entry into regional phase05.06.2018Translation filed 
05.06.2018National basic fee paid 
05.06.2018Search fee paid 
05.06.2018Designation fee(s) paid 
05.06.2018Examination fee paid 
Examination procedure05.06.2018Examination requested  [2018/37]
05.06.2018Date on which the examining division has become responsible
17.09.2019Amendment by applicant (claims and/or description)
03.02.2021Despatch of a communication from the examining division (Time limit: M04)
01.06.2021Reply to a communication from the examining division
07.07.2022Despatch of a communication from the examining division (Time limit: M04)
14.11.2022Reply to a communication from the examining division
24.05.2024Despatch of a communication from the examining division (Time limit: M04)
Fees paidRenewal fee
05.06.2018Renewal fee patent year 03
25.09.2019Renewal fee patent year 04
23.09.2020Renewal fee patent year 05
28.09.2021Renewal fee patent year 06
22.09.2022Renewal fee patent year 07
26.09.2023Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[IA]WO2014123340  (PANTECH CO LTD [KR]) [I] 1,7,13,14 * abstract * [A] 2-6,8-12;
 [P]US2016080059  (YOON SUNG JUN [KR], et al) [P] * paragraph [0033] - paragraph [0049] * * paragraph [0147] - paragraph [0155] * * figure 11 * * claims 1,3 *;
 [XA]  - NEC GROUP, "Configuration and signalling for CSI-RS", 3GPP DRAFT; R1-104529-CSIRS-SIGNALLING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100817), vol. RAN WG1, no. Madrid, Spain; 20100823, XP050449834 [X] 1,7,13,14 * 2 Configuration of Rel-8 CRS and Rel-10 CSI-RS * * 3 Signaling for CSI-RS (Table 1) * [A] 2-6,8-12
 [IA]  - HUAWEI ET AL, "Discussion on CSI-RS design and signalling for 16 ports", vol. RAN WG1, no. Malmo, Sweden; 20151005 - 20151009, (20151004), 3GPP DRAFT; R1-155080, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20151004), XP051002070 [I] 1,7,13,14 * 2 Discussion on CSI-RS resource aggregation for 16 ports * * 4 Conclusions * [A] 2-6,8-12
 [IA]  - ITL INC, "Details on 12- and 16-port NZP CSI-RS resource configuration for FD-MIMO", vol. RAN WG1, no. Malmö, Sweden; 20151005 - 20151009, (20150926), 3GPP DRAFT; R1-155773, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_82b/Docs/, (20150926), XP051021751 [I] 1,7,13,14 * 2. 12- and 16-port NZP CSI-RS resource configuration * * 3. Conclusions * [A] 2-6,8-12
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.