EP3372822 - HYDROELECTRIC POWER GENERATION DEVICE AND POWER GENERATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 03.04.2021 | ||
Former | Grant of patent is intended Status updated on 20.12.2020 | ||
Former | Examination is in progress Status updated on 05.11.2019 | ||
Former | Request for examination was made Status updated on 10.08.2018 | ||
Former | The international publication has been made Status updated on 13.05.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states NTN Corporation 3-17, Kyomachibori 1-chome Nishi-ku Osaka-shi, Osaka 550-0003 / JP | [2018/37] | Inventor(s) | 01 /
FUJITA, Yasuyuki c/o NTN CORPORATION 1578 Higashikaizuka Iwata-shi Shizuoka 438-8510 / JP | 02 /
KAWAI, Tomoya c/o NTN CORPORATION 1578 Higashikaizuka Iwata-shi Shizuoka 438-8510 / JP | [2018/37] | Representative(s) | Bockhorni & Brüntjen Partnerschaft Patentanwälte mbB Agnes-Bernauer-Straße 88 80687 München / DE | [N/P] |
Former [2018/37] | Bockhorni & Brüntjen Partnerschaft Patentanwälte mbB Elsenheimerstraße 49 80687 München / DE | Application number, filing date | 16861867.6 | 03.10.2016 | [2018/37] | WO2016JP79261 | Priority number, date | JP20150215789 | 02.11.2015 Original published format: JP 2015215789 | JP20160136055 | 08.07.2016 Original published format: JP 2016136055 | [2018/37] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017077799 | Date: | 11.05.2017 | Language: | JA | [2017/19] | Type: | A1 Application with search report | No.: | EP3372822 | Date: | 12.09.2018 | Language: | EN | [2018/37] | Type: | B1 Patent specification | No.: | EP3372822 | Date: | 05.05.2021 | Language: | EN | [2021/18] | Search report(s) | International search report - published on: | JP | 11.05.2017 | (Supplementary) European search report - dispatched on: | EP | 22.02.2019 | Classification | IPC: | F03B15/18, F03B11/08, F03B13/26, F03B17/06 | [2019/13] | CPC: |
F03B11/08 (EP,KR,US);
F03B15/16 (US);
F03B11/008 (US);
F03B13/264 (EP,US);
F03B15/18 (EP,KR,US);
F03B17/061 (EP,US);
F03B17/062 (EP,US);
F03B13/22 (US);
F05B2270/20 (EP,US);
|
Former IPC [2018/37] | F03B15/18, F03B11/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG ZUR ERZEUGUNG VON HYDROELEKTRISCHER ENERGIE UND STROMERZEUGUNGSSYSTEM | [2018/37] | English: | HYDROELECTRIC POWER GENERATION DEVICE AND POWER GENERATION SYSTEM | [2018/37] | French: | DISPOSITIF DE PRODUCTION D'ÉNERGIE HYDROÉLECTRIQUE ET SYSTÈME DE PRODUCTION D'ÉNERGIE | [2018/37] | Entry into regional phase | 18.05.2018 | Translation filed | 18.05.2018 | National basic fee paid | 18.05.2018 | Search fee paid | 18.05.2018 | Designation fee(s) paid | 18.05.2018 | Examination fee paid | Examination procedure | 18.05.2018 | Examination requested [2018/37] | 18.05.2018 | Date on which the examining division has become responsible | 28.08.2019 | Amendment by applicant (claims and/or description) | 08.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 28.02.2020 | Reply to a communication from the examining division | 12.11.2020 | Cancellation of oral proceeding that was planned for 07.12.2020 | 07.12.2020 | Date of oral proceedings (cancelled) | 21.12.2020 | Communication of intention to grant the patent | 25.03.2021 | Fee for grant paid | 25.03.2021 | Fee for publishing/printing paid | 25.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] | Fees paid | Renewal fee | 18.05.2018 | Renewal fee patent year 03 | 22.10.2019 | Renewal fee patent year 04 | 28.10.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.10.2016 | AL | 05.05.2021 | AT | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | ES | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | IT | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | MT | 05.05.2021 | NL | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | GB | 03.10.2021 | IE | 03.10.2021 | LU | 03.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | LI | 31.10.2021 | [2024/41] |
Former [2024/22] | HU | 03.10.2016 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
MK | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 03.10.2021 | ||
IE | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/30] | HU | 03.10.2016 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 03.10.2021 | ||
IE | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/29] | HU | 03.10.2016 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 03.10.2021 | ||
IE | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/48] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 03.10.2021 | ||
IE | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/37] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/36] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/35] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/33] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
BE | 31.10.2021 | ||
Former [2022/29] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/26] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/23] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/10] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/08] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/07] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/04] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/52] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/51] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/50] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
Former [2021/49] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
Former [2021/47] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | ||
BG | 05.08.2021 | ||
Former [2021/46] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | Documents cited: | Search | [X]US2012056424 (HOLSTEIN BENJAMIN [DE], et al) [X] 1-3,10,11,13 * abstract * * paragraphs [0006] - [0007] * * paragraph [0010] * * paragraphs [0018] - [0019] * * figures 1-3 *; | [X]CN103511171 (UNIV ZHEJIANG) [X] 1,2,11,13* the whole document *; | [X]US2014117667 (HOLSTEIN BENJAMIN [DE], et al) [X] 1-3,10,11,13 * abstract * * paragraphs [0012] - [0013] * * paragraph [0026] * * paragraph [0033] * * claim 2 * * figures 1-3 * | International search | [A]JPS4938117 (Mitsubishi Electric Corp.) [A] 2-3 * , entire text; all drawings (Family: none) *; | [A]JP2752215B (Toshiba Corp.) [A] 2* , entire text; all drawings (Family: none) *; | [XA]JP2008261327 (KAWASAKI HEAVY IND LTD) [X] 1, 4, 6, 8-9, 11, 13 * , paragraphs [0022] to [0026], [0037] to [0040]; fig. 1 to 2, 6 & WO 2008/114482 A1 & CN 101652560 A * [A] 2-3, 5, 7, 10, 12; | [XA]JP2012197703 (TOKYO ELECTRIC POWER CO INC ) [X] 1, 4-9, 12 * , paragraphs [0044] to [0067]; fig. 1 to 5 (Family: none) * [A] 2-3, 10-11, 13; | [A]JP2015151914 (NAKASHIMA PROPELLER CO LTD) [A] 1-13 * , entire text; all drawings (Family: none) * |