EP3386148 - POWER SUPPLY CONTROL METHOD AND APPARATUS FOR COMMUNICATION NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.08.2021 Database last updated on 24.01.2025 | |
Former | The patent has been granted Status updated on 04.09.2020 | ||
Former | Grant of patent is intended Status updated on 13.02.2020 | ||
Former | Examination is in progress Status updated on 11.07.2019 | ||
Former | Request for examination was made Status updated on 07.09.2018 | ||
Former | The international publication has been made Status updated on 15.06.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | [2020/41] |
Former [2018/41] | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | Inventor(s) | 01 /
GUO, Qiang c/o ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | [2018/41] | Representative(s) | Bandpay & Greuter 11 rue Christophe Colomb 75008 Paris / FR | [N/P] |
Former [2020/41] | Bandpay & Greuter 30, rue Notre-Dame des Victoires 75002 Paris / FR | ||
Former [2018/41] | Studio Torta S.p.A. Via Viotti, 9 10121 Torino / IT | Application number, filing date | 16869701.9 | 01.08.2016 | [2018/41] | WO2016CN92715 | Priority number, date | CN201510863426 | 30.11.2015 Original published format: CN201510863426 | [2018/41] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017092390 | Date: | 08.06.2017 | Language: | ZH | [2017/23] | Type: | A1 Application with search report | No.: | EP3386148 | Date: | 10.10.2018 | Language: | EN | [2018/41] | Type: | B1 Patent specification | No.: | EP3386148 | Date: | 07.10.2020 | Language: | EN | [2020/41] | Search report(s) | International search report - published on: | CN | 08.06.2017 | (Supplementary) European search report - dispatched on: | EP | 20.09.2018 | Classification | IPC: | H04L12/10, H02J1/10 | [2020/08] | CPC: |
H04L12/10 (EP,CN);
H02J1/00 (CN)
|
Former IPC [2018/43] | H04L12/10, H02M3/04 | ||
Former IPC [2018/41] | H04L12/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR STEUERUNG DER STROMVERSORGUNG EINES KOMMUNIKATIONSNETZES | [2018/41] | English: | POWER SUPPLY CONTROL METHOD AND APPARATUS FOR COMMUNICATION NETWORK | [2018/41] | French: | PROCÉDÉ DE COMMANDE D'ALIMENTATION ÉLECTRIQUE ET APPAREIL POUR UN RÉSEAU DE COMMUNICATION | [2018/41] | Entry into regional phase | 29.06.2018 | Translation filed | 29.06.2018 | National basic fee paid | 29.06.2018 | Search fee paid | 29.06.2018 | Designation fee(s) paid | 29.06.2018 | Examination fee paid | Examination procedure | 29.06.2018 | Examination requested [2018/41] | 29.06.2018 | Date on which the examining division has become responsible | 04.04.2019 | Amendment by applicant (claims and/or description) | 15.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 25.11.2019 | Reply to a communication from the examining division | 14.02.2020 | Communication of intention to grant the patent | 22.06.2020 | Fee for grant paid | 22.06.2020 | Fee for publishing/printing paid | 22.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 08.07.2021 | No opposition filed within time limit [2021/37] | Fees paid | Renewal fee | 29.06.2018 | Renewal fee patent year 03 | 25.11.2019 | Renewal fee patent year 04 | 31.08.2020 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 31.08.2019 | 04   M06   Fee paid on   25.11.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.08.2016 | AL | 07.10.2020 | AT | 07.10.2020 | CY | 07.10.2020 | CZ | 07.10.2020 | DK | 07.10.2020 | EE | 07.10.2020 | ES | 07.10.2020 | FI | 07.10.2020 | HR | 07.10.2020 | LT | 07.10.2020 | LV | 07.10.2020 | MC | 07.10.2020 | MK | 07.10.2020 | MT | 07.10.2020 | NL | 07.10.2020 | PL | 07.10.2020 | RO | 07.10.2020 | RS | 07.10.2020 | SE | 07.10.2020 | SI | 07.10.2020 | SK | 07.10.2020 | SM | 07.10.2020 | TR | 07.10.2020 | BG | 07.01.2021 | NO | 07.01.2021 | GR | 08.01.2021 | IS | 07.02.2021 | PT | 08.02.2021 | [2024/42] |
Former [2024/29] | HU | 01.08.2016 | |
AL | 07.10.2020 | ||
AT | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
MK | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
TR | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2024/22] | HU | 01.08.2016 | |
AL | 07.10.2020 | ||
AT | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
MK | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2023/33] | HU | 01.08.2016 | |
AL | 07.10.2020 | ||
AT | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2023/30] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2022/23] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2022/18] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2022/10] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/50] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/45] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/37] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/36] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/35] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/33] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/32] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/30] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/28] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/25] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/23] | AT | 07.10.2020 | |
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/22] | FI | 07.10.2020 | |
RS | 07.10.2020 | ||
NO | 07.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/21] | FI | 07.10.2020 | |
PT | 08.02.2021 | ||
Former [2021/20] | FI | 07.10.2020 | Documents cited: | Search | [Y]US2014191742 (KUNG NIEN-HUI [TW], et al) [Y] 1-13 * abstract * * paragraph [0037] *; | [A]WO2015033119 (WILLIAMS DAVID GARETH [GB], et al) [A] 1-13 * abstract ** pages 1-5 *; | [Y]WO2015117476 (ZTE CORP [CN]) [Y] 1-13 * the whole document *; | [Y]US2015333514 (WANG CHEN-HSUNG [TW], et al) [Y] 1-13 * abstract * * paragraphs [0020] - [0026]; claims 1-15 *; | EP3174172 [ ] (ZTE CORP [CN]) [ ] * the whole document * | International search | [A]US2006171399 (FERENTZ ALON [IL], et al) [A] 1-12* the whole document *; | [A]CN101594236 (HUAWEI TECH CO LTD [CN]) [A] 1-12 * the whole document *; | [A]CN103107891 (INVENTEC CORP) [A] 1-12 * the whole document *; | [X]CN104460792 (CHINA TELECOM CORP LTD) [X] 1-12 * description, paragraphs [0039]-[0074], and figures 2-4 * |