EP3387817 - ROUTING AND SECURITY WITHIN A MOBILE NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.05.2022 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 18.06.2021 | ||
Former | Grant of patent is intended Status updated on 03.02.2021 | ||
Former | Examination is in progress Status updated on 25.06.2019 | ||
Former | Request for examination was made Status updated on 14.09.2018 | ||
Former | The international publication has been made Status updated on 16.06.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states JPU.IO Ltd PO Box 4098 Imber 14 49514 Petach Tikva / IL | [2018/42] | Inventor(s) | 01 /
SCHWARTZ, Jonathan 8 Moshe Kol Street 6962660 Tel Aviv / IL | 02 /
MALKA, Franck 46 Sigalon Street POB 7081 4033926 Kfar Yona / IL | [2018/42] | Representative(s) | Creation IP Ltd Hillington Park Innovation Centre 1 Ainslie Road Glasgow G52 4RU / GB | [N/P] |
Former [2021/29] | Schwegman Lundberg Woessner Limited Hillington Park Innovation Centre 1 Ainslie Road Glasgow G52 4RU / GB | ||
Former [2018/42] | Collins, John David Schwegman Lundberg Woessner Limited Hillington Park Innovation Centre 1 Ainslie Road Glasgow G52 4RU / GB | Application number, filing date | 16872480.5 | 02.12.2016 | [2018/42] | WO2016IB01827 | Priority number, date | US201562264791P | 08.12.2015 Original published format: US 201562264791 P | US201615090918 | 05.04.2016 Original published format: US201615090918 | [2018/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017098320 | Date: | 15.06.2017 | Language: | EN | [2017/24] | Type: | A1 Application with search report | No.: | EP3387817 | Date: | 17.10.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.06.2017 takes the place of the publication of the European patent application. | [2018/42] | Type: | B1 Patent specification | No.: | EP3387817 | Date: | 21.07.2021 | Language: | EN | [2021/29] | Search report(s) | International search report - published on: | US | 15.06.2017 | (Supplementary) European search report - dispatched on: | EP | 11.10.2018 | Classification | IPC: | H04W12/088, H04L29/06, H04L29/12, H04W88/16 | [2021/07] | CPC: |
H04L63/20 (EP,KR,US);
H04L63/0227 (EP,KR,US);
H04L45/76 (KR);
H04L61/256 (KR);
H04L61/4511 (EP,KR,US);
H04L61/5007 (EP,KR,US);
H04L63/0272 (EP,KR,US);
H04L63/104 (EP,KR,US);
H04W12/088 (EP,KR,US);
H04W88/16 (EP,KR,US);
H04L2101/375 (KR);
H04L41/0894 (KR);
H04L61/2503 (EP,US)
(-)
|
Former IPC [2018/46] | H04L29/06, H04L29/12, H04W12/08, H04W88/16 | ||
Former IPC [2018/42] | H04L29/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ROUTING UND SICHERHEIT INNERHALB EINES MOBILFUNKNETZES | [2018/42] | English: | ROUTING AND SECURITY WITHIN A MOBILE NETWORK | [2018/42] | French: | ROUTAGE ET SÉCURITÉ DANS UN RÉSEAU MOBILE | [2018/42] | Entry into regional phase | 15.06.2018 | National basic fee paid | 15.06.2018 | Search fee paid | 15.06.2018 | Designation fee(s) paid | 15.06.2018 | Examination fee paid | Examination procedure | 04.10.2017 | Request for preliminary examination filed International Preliminary Examining Authority: US | 15.06.2018 | Examination requested [2018/42] | 15.06.2018 | Date on which the examining division has become responsible | 07.05.2019 | Amendment by applicant (claims and/or description) | 27.06.2019 | Despatch of a communication from the examining division (Time limit: M06) | 07.01.2020 | Reply to a communication from the examining division | 04.02.2021 | Communication of intention to grant the patent | 10.06.2021 | Fee for grant paid | 10.06.2021 | Fee for publishing/printing paid | 10.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.04.2022 | No opposition filed within time limit [2022/26] | Fees paid | Renewal fee | 31.12.2018 | Renewal fee patent year 03 | 27.12.2019 | Renewal fee patent year 04 | 28.12.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.12.2016 | AL | 21.07.2021 | AT | 21.07.2021 | CY | 21.07.2021 | CZ | 21.07.2021 | DK | 21.07.2021 | EE | 21.07.2021 | FI | 21.07.2021 | HR | 21.07.2021 | IT | 21.07.2021 | LT | 21.07.2021 | LV | 21.07.2021 | MC | 21.07.2021 | MK | 21.07.2021 | PL | 21.07.2021 | RO | 21.07.2021 | RS | 21.07.2021 | SE | 21.07.2021 | SI | 21.07.2021 | SK | 21.07.2021 | SM | 21.07.2021 | BG | 21.10.2021 | NO | 21.10.2021 | GR | 22.10.2021 | IS | 21.11.2021 | PT | 22.11.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/22] |
Former [2023/30] | HU | 02.12.2016 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 02.12.2016 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
BE | 31.12.2021 | ||
Former [2022/36] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/33] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/29] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/25] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/24] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/21] | AT | 21.07.2021 | |
DK | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/11] | AT | 21.07.2021 | |
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/09] | AT | 21.07.2021 | |
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
PT | 22.11.2021 | ||
Former [2022/08] | AT | 21.07.2021 | |
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
Former [2022/07] | AT | 21.07.2021 | |
LT | 21.07.2021 | ||
NO | 21.10.2021 | Documents cited: | Search | [XI]US2012233668 (LEAFE EDWARD [US], et al) [X] 1,9,10,14 * paragraph [0066] - paragraph [0092] * [I] 4-8,13; | [XI]US8316435 (VARADHAN KANNAN [US], et al) [X] 1-4,9-12,14 * column 1, line 30 - column 2, line 42 * * column 3, line 3 - line 20 * * column 4, line 5 - line 18 * * column 6, line 14 - line 55 * * column 7 * * column 8, line 46 - line 64 * * column 9, line 46 - column 10, line 45 * * column 13, line 62 - column 14, line 4 * * column 15, line 9 - column 16, line 59 * * column 18, line 1 - line 36 * * claims 1-14 * * figures 1-12 * [I] 5-8,13; | [I]EP2557854 (JUNIPER NETWORKS INC [US]) [I] 1-14 * paragraph [0049] - paragraph [0053] * * paragraph [0061] - paragraph [0065] * * paragraph [0120] ** figures 4-9 * | International search | [A]US2010058436 (MAES STEPHANE H [US]) [A] 1-36* , entire document *; | [Y]US2011099604 (ZHOU XIAOYUN [CN], et al) [Y] 1-36 * , entire document, especially; abstract, para. [0002], [0003], [0005], [0044] *; | [Y]US2014007222 (QURESHI WAHEED [US], et al) [Y] 1-36 * , entire document, especially; abstract, para. [0055]. [0057]-[0061], [0068], [0070], [0084], [0090], [0113], [0118], [0175], [0191], [0194], [01951, [0297], [0351] * | by applicant | US2012233668 | US8316435 | EP2557854 |