blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3396359

EP3396359 - DAMAGE INFORMATION PROCESSING DEVICE AND DAMAGE INFORMATION PROCESSING METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.03.2022
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  26.03.2021
FormerGrant of patent is intended
Status updated on  19.11.2020
FormerExamination is in progress
Status updated on  25.01.2020
FormerRequest for examination was made
Status updated on  28.09.2018
FormerThe international publication has been made
Status updated on  05.07.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
FUJIFILM Corporation
26-30, Nishiazabu 2-chome
Minato-ku
Tokyo 106-8620 / JP
[N/P]
Former [2021/14]For all designated states
FUJIFILM Corporation
26-30, Nishiazabu 2-chome, Minato-ku
Tokyo 106-8620 / JP
Former [2018/44]For all designated states
Fujifilm Corporation
26-30, Nishiazabu 2-chome Minato-ku
Tokyo 106-8620 / JP
Inventor(s)01 / KARUBE, Mikihiko
c/o FUJIFILM Corporation
7-3, Akasaka 9-chome
Minato-ku
Tokyo 107-0052 / JP
 [2018/44]
Representative(s)Klunker IP Patentanwälte PartG mbB
Destouchesstraße 68
80796 München / DE
[2018/44]
Application number, filing date16878177.109.11.2016
[2018/44]
WO2016JP83191
Priority number, dateJP2015025497625.12.2015         Original published format: JP 2015254976
[2018/44]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017110279
Date:29.06.2017
Language:JA
[2017/26]
Type: A1 Application with search report 
No.:EP3396359
Date:31.10.2018
Language:EN
[2018/44]
Type: B1 Patent specification 
No.:EP3396359
Date:28.04.2021
Language:EN
[2021/17]
Search report(s)International search report - published on:JP29.06.2017
(Supplementary) European search report - dispatched on:EP19.12.2018
ClassificationIPC:G01N21/88, G06Q50/08, G06T7/00
[2019/03]
CPC:
G06T7/0004 (EP,US); G01N21/8851 (US); G01N21/88 (EP,US);
G06Q50/08 (EP,US); G01N2021/8887 (US); G06T2207/30132 (EP,US)
Former IPC [2018/44]G01N21/88, G06Q50/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/44]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SCHADENSINFORMATIONSVERARBEITUNGSVORRICHTUNG UND SCHADENSINFORMATIONSVERARBEITUNGSVERFAHREN[2018/44]
English:DAMAGE INFORMATION PROCESSING DEVICE AND DAMAGE INFORMATION PROCESSING METHOD[2018/44]
French:DISPOSITIF ET PROCÉDÉ DE TRAITEMENT D'INFORMATIONS DE DOMMAGES[2018/44]
Entry into regional phase14.06.2018Translation filed 
14.06.2018National basic fee paid 
14.06.2018Search fee paid 
14.06.2018Designation fee(s) paid 
14.06.2018Examination fee paid 
Examination procedure14.06.2018Examination requested  [2018/44]
14.06.2018Date on which the examining division has become responsible
27.06.2019Amendment by applicant (claims and/or description)
29.01.2020Despatch of a communication from the examining division (Time limit: M04)
02.06.2020Reply to a communication from the examining division
20.11.2020Communication of intention to grant the patent
18.03.2021Fee for grant paid
18.03.2021Fee for publishing/printing paid
18.03.2021Receipt of the translation of the claim(s)
Opposition(s)31.01.2022No opposition filed within time limit [2022/14]
Fees paidRenewal fee
14.11.2018Renewal fee patent year 03
14.11.2019Renewal fee patent year 04
13.11.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.11.2016
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
TR28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
GB09.11.2021
IE09.11.2021
LU09.11.2021
BE30.11.2021
FR30.11.2021
[2024/29]
Former [2024/22]HU09.11.2016
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
GB09.11.2021
IE09.11.2021
LU09.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/33]HU09.11.2016
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
GB09.11.2021
IE09.11.2021
LU09.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/30]AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
GB09.11.2021
IE09.11.2021
LU09.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/01]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
GB09.11.2021
IE09.11.2021
LU09.11.2021
BE30.11.2021
FR30.11.2021
Former [2022/48]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
GB09.11.2021
IE09.11.2021
LU09.11.2021
BE30.11.2021
Former [2022/47]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
GB09.11.2021
LU09.11.2021
BE30.11.2021
Former [2022/36]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
LU09.11.2021
BE30.11.2021
Former [2022/34]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
LU09.11.2021
BE30.11.2021
Former [2022/33]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
BE30.11.2021
Former [2022/29]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/26]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/23]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/10]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
IS22.12.2021
Former [2022/09]AT28.04.2021
CZ28.04.2021
DK28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/08]AT28.04.2021
CZ28.04.2021
DK28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/07]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/52]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/51]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/50]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
Former [2021/49]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
Former [2021/47]AT28.04.2021
FI28.04.2021
LT28.04.2021
NL28.04.2021
BG28.07.2021
Former [2021/46]AT28.04.2021
FI28.04.2021
LT28.04.2021
Documents cited:Search[XAI]  - QIN ZOU ET AL, "CrackTree: Automatic crack detection from pavement images", PATTERN RECOGNITION LETTERS, vol. 33, no. 3, doi:10.1016/J.PATREC.2011.11.004, ISSN 0167-8655, (20110712), pages 227 - 238, (20111112), XP028122430 [X] 1,2,13,14,16 * Section 13rd paragraph starting at "In this paper..." and Fig. 1. Fig. 5 c-h and corresponding text in Section 5.2, 2nd and 3rd paragraphs. Section 5.2, 2nd paragraph, last sentence. Fig. 5 e-h and corresponding text in Section 5.2, 2nd and 3rd paragraphs * [A] 3,6-8 [I] 4,5,9-12,15

DOI:   http://dx.doi.org/10.1016/j.patrec.2011.11.004
 [XAI]  - KONOVALENKO I V ET AL, "Error analysis of an algorithm for identifying thermal fatigue cracks", OPTOELECTRONICS, INSTRUMENTATION AND DATA PROCESSING, ALLERTON PRESS, INC, HEIDELBERG, (20111012), vol. 47, no. 4, doi:10.3103/S8756699011040066, ISSN 1934-7944, pages 360 - 367, XP019963625 [X] 1,2,16 * Fig. 4 and corresponding text : 3 last lines of p. 362. p. 363, sub-section "Skeletonization". * [A] 3,6-8,13,14 [I] 4,5,9-12,15

DOI:   http://dx.doi.org/10.3103/S8756699011040066
 [XAI]  - H.-J. VOGEL ET AL, "Studies of crack dynamics in clay soil. I. Experimental methods, results and morphological quantification", GEODERMA, AMSTERDAM, NL, (20040821), vol. 125, doi:10.1016/j.geoderma.2004.07.008, ISSN 0016-7061, pages 203 - 211, XP055528996 [X] 1,2,16 * p. 205, right column, 2nd paragraph starting at "The result of.. " and Fig. 2. 1st paragraph of Section 4.1. p. 206, left column, 10 last lines. * [A] 3,6-8,13,14 [I] 4,5,9-12,15

DOI:   http://dx.doi.org/10.1016/j.geoderma.2004.07.008
 [XI]  - QI ZI HUANG PENG ET AL, "Automatic Crack Length Measurement of Concrete Structure Based on Image Processing", ADVANCED MATERIALS RESEARCH, (20140922), vol. 1030-1032, doi:10.4028/www.scientific.net/AMR.1030-1032.728, pages 728 - 731, XP055529255 [X] 1-3,6-8,13-16 * Fig. 2 and p. 728, 2nd paragraph of Subsection "Crack inspection system and image preprocessing". p. 729, 2nd paragraph of Subsection "Crack image preprocessing". p. 729, Subsection "Construct of crack skeleton tree" and Fig. 3. Title. * [I] 4,5,9-12

DOI:   http://dx.doi.org/10.4028/www.scientific.net/AMR.1030-1032.728
International search[A]JPH03138775  (TOKYO ELECTRIC POWER CO, et al) [A] 1-16 * , (Family: none) *;
 [A]JPH06148089  (SHIMIZU CONSTRUCTION CO LTD) [A] 1-16 * , paragraph [0014] (Family: none) *;
 [A]JP2000046691  (ASAHI OPTICAL CO LTD) [A] 1-16 * , (Family: none) *;
 [A]JP2002257744  (TAKENAKA KOMUTEN CO) [A] 1-16 * , (Family: none *;
 [A]JP2013250058  (RAILWAY TECHNICAL RES INST, et al) [A] 1-16 * , (Family: none) *;
 [PA]JP2016050887  (KANSAI KOJI SOKURYO KK) [PA] 1-1* , (Family: none) *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.