EP3396752 - GAS DIFFUSION ELECTRODE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.09.2023 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 14.10.2022 | ||
Former | Grant of patent is intended Status updated on 10.07.2022 | ||
Former | Request for examination was made Status updated on 28.09.2018 | ||
Former | The international publication has been made Status updated on 05.07.2017 | Most recent event Tooltip | 19.07.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 21.08.2024 [2024/34] | Applicant(s) | For all designated states Toray Industries, Inc. 1-1, Nihonbashi-Muromachi, 2-chome Chuo-ku Tokyo 103-8666 / JP | [2018/44] | Inventor(s) | 01 /
MIYAKE, Toru c/o Shiga Plant Toray Industries Inc. 1-1 Sonoyama 1-chome Otsu-shi Shiga 520-8558 / JP | 02 /
UTSUNOMIYA, Masamichi c/o Shiga Plant Toray Industries Inc. 1-1 Sonoyama 1-chome Otsu-shi Shiga 520-8558 / JP | 03 /
TANIMURA, Yasuaki c/o Shiga Plant Toray Industries Inc. 1-1 Sonoyama 1-chome Otsu-shi Shiga 520-8558 / JP | 04 /
SHIGETA, Kazuyo c/o Shiga Plant Toray Industries Inc. 1-1 Sonoyama 1-chome Otsu-shi Shiga 520-8558 / JP | [2018/44] | Representative(s) | Prüfer & Partner mbB Patentanwälte · Rechtsanwälte Sohnckestraße 12 81479 München / DE | [2018/44] | Application number, filing date | 16878579.8 | 16.12.2016 | [2018/44] | WO2016JP87624 | Priority number, date | JP20150251254 | 24.12.2015 Original published format: JP 2015251254 | [2018/44] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017110690 | Date: | 29.06.2017 | Language: | JA | [2017/26] | Type: | A1 Application with search report | No.: | EP3396752 | Date: | 31.10.2018 | Language: | EN | [2018/44] | Type: | B1 Patent specification | No.: | EP3396752 | Date: | 16.11.2022 | Language: | EN | [2022/46] | Search report(s) | International search report - published on: | JP | 29.06.2017 | (Supplementary) European search report - dispatched on: | EP | 06.12.2019 | Classification | IPC: | H01M4/86, H01M8/10, // H01M8/1018 | [2022/31] | CPC: |
H01M4/861 (EP,KR,US);
H01M4/8605 (CN,US);
H01M4/96 (US);
H01M4/8652 (EP,US);
H01M4/8657 (EP,KR,US);
H01M4/8673 (EP,US);
H01M4/8807 (CN);
H01M8/0234 (KR);
H01M8/0245 (KR);
H01M8/1007 (CN);
H01M8/141 (US);
H01M2008/1095 (EP,US);
|
Former IPC [2019/27] | H01M4/86, // H01M8/1018 | ||
Former IPC [2018/44] | H01M4/86, H01M4/96, H01M8/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | GASDIFFUSIONSELEKTRODE | [2018/44] | English: | GAS DIFFUSION ELECTRODE | [2018/44] | French: | ÉLECTRODE À DIFFUSION GAZEUSE | [2018/44] | Entry into regional phase | 29.05.2018 | Translation filed | 29.05.2018 | National basic fee paid | 29.05.2018 | Search fee paid | 29.05.2018 | Designation fee(s) paid | 29.05.2018 | Examination fee paid | Examination procedure | 29.05.2018 | Examination requested [2018/44] | 29.05.2018 | Date on which the examining division has become responsible | 03.02.2020 | Amendment by applicant (claims and/or description) | 11.07.2022 | Communication of intention to grant the patent | 07.10.2022 | Fee for grant paid | 07.10.2022 | Fee for publishing/printing paid | 07.10.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 17.08.2023 | No opposition filed within time limit [2023/43] | Fees paid | Renewal fee | 17.12.2018 | Renewal fee patent year 03 | 13.12.2019 | Renewal fee patent year 04 | 14.12.2020 | Renewal fee patent year 05 | 30.11.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 16.11.2022 | AT | 16.11.2022 | BG | 16.11.2022 | CY | 16.11.2022 | CZ | 16.11.2022 | DK | 16.11.2022 | EE | 16.11.2022 | ES | 16.11.2022 | FI | 16.11.2022 | HR | 16.11.2022 | IT | 16.11.2022 | LT | 16.11.2022 | LV | 16.11.2022 | MC | 16.11.2022 | MK | 16.11.2022 | NL | 16.11.2022 | PL | 16.11.2022 | RO | 16.11.2022 | RS | 16.11.2022 | SE | 16.11.2022 | SI | 16.11.2022 | SK | 16.11.2022 | SM | 16.11.2022 | IE | 16.12.2022 | LU | 16.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | NO | 16.02.2023 | GR | 17.02.2023 | IS | 16.03.2023 | PT | 16.03.2023 | [2024/34] |
Former [2024/29] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CY | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
IT | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
MK | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
IE | 16.12.2022 | ||
LU | 16.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2024/27] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CY | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
IT | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MK | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
IE | 16.12.2022 | ||
LU | 16.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2024/26] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CY | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
IT | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
IE | 16.12.2022 | ||
LU | 16.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2024/21] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CY | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
IE | 16.12.2022 | ||
LU | 16.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/51] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
IE | 16.12.2022 | ||
LU | 16.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/49] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
IE | 16.12.2022 | ||
LU | 16.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/48] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
IE | 16.12.2022 | ||
LU | 16.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/47] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
LU | 16.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/38] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
LU | 16.12.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/37] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/35] | AT | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/34] | AT | 16.11.2022 | |
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/33] | AT | 16.11.2022 | |
DK | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/29] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/26] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/24] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/23] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/22] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
LT | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/20] | LT | 16.11.2022 | |
NO | 16.02.2023 | Documents cited: | Search | [A]JP2009070637 (EQUOS RES CO LTD); | [A]EP2337128 (NISSAN MOTOR [JP], et al); | [A]EP2680352 (JNTC CO LTD [KR], et al) | International search | [A]JP2000182626 (SANYO ELECTRIC CO); | [A]JP2006155921 (NIPPON STEEL CORP); | [A]JP2007214019 (AISIN SEIKI); | [A]JP2009238376 (EQUOS RES CO LTD); | [A]WO2010035815 (NISSAN MOTOR [JP], et al); | [A]JP2010267539 (TOYOTA MOTOR CORP, et al); | [A]JP2011233274 (JAPAN VILENE CO LTD); | [A]JP2011243314 (HONDA MOTOR CO LTD); | [A]JP2012054111 (DAINIPPON PRINTING CO LTD, et al); | [A]JP2014011163 (JNTC CO LTD, et al) | Examination | EP2680352 |