EP3400744 - METHODS AND DEVICES FOR DOWNLINK FLOW CONTROL IN WIRELESS COMMUNICATION SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 28.02.2022 | ||
Former | Examination is in progress Status updated on 12.02.2021 | ||
Former | Request for examination was made Status updated on 12.10.2018 | ||
Former | The international publication has been made Status updated on 14.07.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2022/17] |
Former [2019/50] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | ||
Former [2018/46] | For all designated states Telefonaktiebolaget LM Ericsson (PUBL) 164 83 Stockholm / SE | Inventor(s) | 01 /
ZHU, Huaisong No. 5 Lize East Street Chaoyang District Beijing 100102 / CN | 02 /
LU, Qianxi No. 5 Lize East Street Chaoyang District Beijing 100102 / CN | 03 /
ZHANG, Zhan No. 5 Lize East Street Chaoyang District Beijing 100102 / CN | [2018/46] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [N/P] |
Former [2022/17] | Zacco Sweden AB Valhallavägen 117 Box 5581 114 85 Stockholm / SE | ||
Former [2018/46] | Zacco Sweden AB P.O. Box 5581 114 85 Stockholm / SE | Application number, filing date | 16882921.6 | 07.01.2016 | [2018/46] | WO2016CN70381 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017117776 | Date: | 13.07.2017 | Language: | EN | [2017/28] | Type: | A1 Application with search report | No.: | EP3400744 | Date: | 14.11.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 13.07.2017 takes the place of the publication of the European patent application. | [2018/46] | Type: | B1 Patent specification | No.: | EP3400744 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | CN | 13.07.2017 | (Supplementary) European search report - dispatched on: | EP | 03.06.2019 | Classification | IPC: | H04L47/34, H04W72/08, H04W24/10, H04L5/00, H04W28/02, H04W28/06, H04W28/12, H04W72/04 | [2022/08] | CPC: |
H04W28/0236 (EP,US);
H04L47/34 (EP,US);
H04L5/00 (US);
H04W24/10 (EP,US);
H04W28/02 (EP,US);
H04W28/065 (US);
|
Former IPC [2019/27] | H04W72/08, H04W24/10, H04L5/00, H04W28/02, H04W28/06, H04W28/12, H04W72/04, H04L12/801 | ||
Former IPC [2018/46] | H04W72/08, H04W24/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNGEN ZUR DOWNLINK-FLUSSSTEUERUNG IN DRAHTLOSKOMMUNIKATIONSSYSTEMEN | [2018/46] | English: | METHODS AND DEVICES FOR DOWNLINK FLOW CONTROL IN WIRELESS COMMUNICATION SYSTEMS | [2018/46] | French: | PROCÉDÉS ET DISPOSITIFS DE RÉGULATION DU DÉBIT DE LIAISON DESCENDANTE DANS DES SYSTÈMES DE COMMUNICATION SANS FIL | [2018/46] | Entry into regional phase | 12.07.2018 | National basic fee paid | 12.07.2018 | Search fee paid | 12.07.2018 | Designation fee(s) paid | 12.07.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 12.07.2018 | Examination requested [2018/46] | 03.12.2019 | Amendment by applicant (claims and/or description) | 16.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 05.03.2021 | Reply to a communication from the examining division | 01.03.2022 | Communication of intention to grant the patent | 18.03.2022 | Fee for grant paid | 18.03.2022 | Fee for publishing/printing paid | 18.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 17.07.2018 | Renewal fee patent year 03 | 28.01.2019 | Renewal fee patent year 04 | 27.01.2020 | Renewal fee patent year 05 | 27.01.2021 | Renewal fee patent year 06 | 27.01.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 27.04.2022 | AT | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | BG | 27.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | IE | 07.01.2023 | LU | 07.01.2023 | [2024/29] |
Former [2024/11] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 07.01.2023 | ||
LU | 07.01.2023 | ||
Former [2024/08] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 07.01.2023 | ||
LU | 07.01.2023 | ||
Former [2023/43] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
LU | 07.01.2023 | ||
Former [2023/25] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/44] | NL | 27.04.2022 | Documents cited: | Search | [XI]WO2015116877 (QUALCOMM INC [US]) [X] 1,3-5,7,9,11,12,14 * paragraph [0039] * * paragraphs [0083] , [0054] *[I] 2,6,8,10,13,15 | International search | [X]CN101895921 (POTEVIO INST TECHNOLOGY CO LTD) [X] 1, 3-5, 8-10, 14, 15, 17, 19-21, 24- 26, 30, 31, 33-38 * description, paragraphs [0045] to [0067] and figures 1 to 3 *; | [A]CN101932080 (DATANG MOBILE COMM EQUIP CO) [A] 1-38 * the whole document *; | [A]CN102843715 (ZTE CORP) [A] 1-38 * the whole document *; | [A]CN103259615 (HUAWEI TECH CO LTD) [A] 1-38 * the whole document *; | [A]KR20150133617 (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-38* the whole document * | by applicant | WO2015116877 |