EP3326778 - MOLD DEVICE, INJECTION MOLDING SYSTEM AND METHOD FOR MANUFACTURING MOLDED ARTICLE [Right-click to bookmark this link] | |||
Former [2018/22] | DIE DEVICE, MOLDING APPARATUS, INJECTION MOLDING SYSTEM, AND MOLDING MANUFACTURING METHOD | ||
[2023/13] | Status | No opposition filed within time limit Status updated on 12.04.2024 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 05.05.2023 | ||
Former | Grant of patent is intended Status updated on 23.10.2022 | ||
Former | Examination is in progress Status updated on 04.06.2021 | ||
Former | Request for examination was made Status updated on 27.04.2018 | ||
Former | The international publication has been made Status updated on 14.07.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Suzuki, Yasuhiro 575 banchi Hirose-chou Suzuka-shi, Mie 513-0001 / JP | [2018/22] | Inventor(s) | 01 /
see applicant ... | [2018/22] | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2018/22] | Application number, filing date | 16883728.4 | 07.12.2016 | [2018/22] | WO2016JP86380 | Priority number, date | JP20160000781 | 06.01.2016 Original published format: JP 2016000781 | JP20160094427 | 10.05.2016 Original published format: JP 2016094427 | JP20160168716 | 31.08.2016 Original published format: JP 2016168716 | [2018/22] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017119228 | Date: | 13.07.2017 | Language: | JA | [2017/28] | Type: | A1 Application with search report | No.: | EP3326778 | Date: | 30.05.2018 | Language: | EN | [2018/22] | Type: | B1 Patent specification | No.: | EP3326778 | Date: | 07.06.2023 | Language: | EN | [2023/23] | Search report(s) | International search report - published on: | JP | 13.07.2017 | (Supplementary) European search report - dispatched on: | EP | 03.04.2019 | Classification | IPC: | B29C45/34, B29C45/00, B29C45/43, B29C45/17, // B29C45/40 | [2022/46] | CPC: |
B29C45/34 (EP,KR,US);
B29C45/43 (KR);
B29C45/1734 (EP,KR,US);
B29C45/0025 (EP,US);
B29C45/0055 (US);
B29C45/03 (US);
B29C45/1732 (EP,US);
B29C45/174 (EP,US);
B29C45/401 (KR,US);
|
Former IPC [2019/18] | B29C45/34, B29C45/17, B29C45/43, B29C45/00 | ||
Former IPC [2018/22] | B29C45/34, B29C45/17, B29C45/43 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FORMVORRICHTUNG, SPRITZGIESSSYSTEM UND VERFAHREN ZUR HERSTELLUNG VON FORMARTIKELN | [2023/13] | English: | MOLD DEVICE, INJECTION MOLDING SYSTEM AND METHOD FOR MANUFACTURING MOLDED ARTICLE | [2023/13] | French: | MOULE, SYSTEME DE MOULAGE PAR INJECTION ET PROCEDE DE FABRICATION D'UN ARTICLE MOULE | [2023/13] |
Former [2018/22] | STEMPELVORRICHTUNG, FORMVORRICHTUNG, SPRITZGIESSSYSTEM UND FORMHERSTELLUNGSVERFAHREN | ||
Former [2018/22] | DIE DEVICE, MOLDING APPARATUS, INJECTION MOLDING SYSTEM, AND MOLDING MANUFACTURING METHOD | ||
Former [2018/22] | DISPOSITIF DU TYPE FILIÈRE, APPAREIL DE MOULAGE, SYSTÈME DE MOULAGE PAR INJECTION ET PROCÉDÉ DE FABRICATION PAR MOULAGE | Entry into regional phase | 31.01.2018 | Translation filed | 31.01.2018 | National basic fee paid | 31.01.2018 | Search fee paid | 31.01.2018 | Designation fee(s) paid | 31.01.2018 | Examination fee paid | Examination procedure | 31.01.2018 | Examination requested [2018/22] | 31.01.2018 | Date on which the examining division has become responsible | 31.10.2019 | Amendment by applicant (claims and/or description) | 04.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 01.10.2021 | Reply to a communication from the examining division | 24.05.2022 | Despatch of a communication from the examining division (Time limit: M04) | 26.09.2022 | Reply to a communication from the examining division | 24.10.2022 | Communication of intention to grant the patent | 21.02.2023 | Receipt of the translation of the claim(s) | 23.02.2023 | Fee for grant paid | 23.02.2023 | Fee for publishing/printing paid | Opposition(s) | 08.03.2024 | No opposition filed within time limit [2024/20] | Fees paid | Renewal fee | 17.12.2018 | Renewal fee patent year 03 | 30.12.2019 | Renewal fee patent year 04 | 14.12.2020 | Renewal fee patent year 05 | 15.12.2021 | Renewal fee patent year 06 | 13.12.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 07.06.2023 | CZ | 07.06.2023 | DK | 07.06.2023 | EE | 07.06.2023 | ES | 07.06.2023 | FI | 07.06.2023 | HR | 07.06.2023 | IT | 07.06.2023 | LT | 07.06.2023 | LV | 07.06.2023 | NL | 07.06.2023 | PL | 07.06.2023 | RO | 07.06.2023 | RS | 07.06.2023 | SE | 07.06.2023 | SI | 07.06.2023 | SK | 07.06.2023 | SM | 07.06.2023 | NO | 07.09.2023 | GR | 08.09.2023 | IS | 07.10.2023 | PT | 09.10.2023 | [2024/26] |
Former [2024/24] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/22] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/10] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/09] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
Former [2024/08] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/03] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/01] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/52] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/51] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/50] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/48] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
Former [2023/46] | ES | 07.06.2023 | Documents cited: | Search | [IY]US4479914 (BAUMRUCKER ERVIN J [US]) [I] 1,5-7,9 * figures 1, 3, 5, 6; claims 1-8 * * column 4, line 16 - line 63 * * column 4, line 64 - column 5, line 57 * * column 6 * [Y] 1,5-7,9; | [Y]US4508356 (JANIAN ROBERT [US]) [Y] 1,5-7 * page 1; figures 1-3, 6, 8 *; | [Y]JPH03224719 (TOYODA GOSEI KK) [Y] 1,5-7 * abstract *; | [XI]EP0495614 (NIPPON STEEL CHEMICAL CO [JP]) [X] 3 * column 10; figures 10, 11 * [I] 4; | [A]JPH05111938 (HONDA MOTOR CO LTD) [A] 1-10* abstract *; | [XYI]JPH0866946 (IDEMITSU PETROCHEMICAL CO) [X] 2,6 * paragraph [0015] - paragraph [0023]; figures 1-5 * [Y] 9 [I] 9; | [A]DE19516290 (BATTENFELD GMBH [DE]) [A] 1-10 * column 7; figures 1, 2 *; | [XYI]JPH1024469 (ASAHI CHEMICAL IND) [X] 2,3 * abstract * * the whole document * [Y] 1,5-7,9 [I] 10; | [Y]JP2009299787 (MITSUBISHI CABLE IND LTD) [Y] 1,5-7 * paragraph [0002] - paragraph [0005]; figure 1 * * paragraph [0009] - paragraph [0015] *; | [XYI]JP2010184401 (TOYOTA BOSHOKU CORP) [X] 2,6 * paragraph [0016] - paragraph [0026]; figures 1-7 * [Y] 9 [I] 9; | [Y]JP2011255541 (CANON KK) [Y] 1,5-7,9 * ref.-no. 4, 13, 22;; figures 1-7 * * paragraph [0005] - paragraph [0016] * * abstract *; | [E]EP3228434 (SUZUKI YASUHIRO [JP]) [E] 1,2,5-7,9 * figures 1-60; claims 1-7 * * paragraph [0233] - paragraph [0278] * * paragraph [0136] - paragraph [0160] * * the whole document *; | [X] - "Möglichkeiten und Grenzen der Projektilinjektionstechnik", IKV FACHTAGUNG ?GAS- UND WASSERINJEKTIONSTECHNIK POTENZIALE NUTZEN, HERAUSFORDERUNGEN MEIST,, (20071128), pages 1 - 7, XP007905530 [X] 3,6 * page 5; figure 5 * | International search | [A]JPH06198691 (SUMITOMO JUKIKAI PLAST MACH KK, et al) [A] 1-10 * , entire text; all drawings & US 5439371 A & EP 596271 A1 & KR 10-0188562 B *; | [XY]JPH0866946 (IDEMITSU PETROCHEMICAL CO) [X] 2, 6 * , paragraphs [0015] to [0023]; fig. 1 to 5 (Family: none) * [Y] 4, 8-10; | [A]JPH0866932 (IDEMITSU PETROCHEMICAL CO) [A] 1-10* , entire text; all drawings (Family: none) *; | [Y]JPH11108193 (MITSUBISHI CABLE IND LTD) [Y] 1, 4-8 * , claims 1, 4; paragraphs [0027] to [0028]; fig. 4 (Family: none) *; | [Y]JPH11216748 (ASAHI CHEMICAL IND) [Y] 1, 4-10 * , claims 1 to 3; paragraphs [0011] to [0017]; fig. 1 to 3 (Family: none) *; | [A]JP2001162654 (INOUE MTP KK) [A] 3 * , paragraphs [0009] to [0014]; fig. 1 (Family: none) *; | [A]JP2004299357 (MITSUBISHI ENG PLASTICS CORP) [A] 3 * , paragraphs [0037] to [0046], [0053] to [0059]; fig. 1, 5 (Family: none) *; | [Y]JP2009299787 (MITSUBISHI CABLE IND LTD) [Y] 1, 4-8 * , paragraphs [0002] to [0005], [0009] to [0015]; fig. 1 (Family: none) *; | [XY]JP2010184401 (TOYOTA BOSHOKU CORP) [X] 2, 6 * , claims 1 to 2; paragraphs [0016] to [0026]; fig. 1 to 6 (Family: none) * [Y] 4, 8-10; | [Y]JP2011255541 (CANON KK) [Y] 1, 4-10 * , claim 1; paragraphs [0011], [0014]; fig. 1, 4, 6 (Family: none) * | Examination | DE19516290 |