EP3402947 - MODULAR TENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 05.10.2020 | ||
Former | Request for examination was made Status updated on 19.10.2018 | ||
Former | The international publication has been made Status updated on 21.07.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Kalvani IP Holdings, LLC. 51 Wood Oaks Drive South Barrington, Illinois 60010 / US | [2018/47] | Inventor(s) | 01 /
KALVANI, Bimal A. 51 Woods Oaks Drive South Barrington, Illinois 60010 / US | [2018/47] | Representative(s) | Prock, Thomas Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | [2021/14] |
Former [2018/47] | Prock, Thomas Marks & Clerk LLP 90 Long Acre London WC2E 9RA / GB | Application number, filing date | 16885362.0 | 16.02.2016 | [2018/47] | WO2016US18092 | Priority number, date | US201614992943 | 11.01.2016 Original published format: US201614992943 | [2018/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017123263 | Date: | 20.07.2017 | Language: | EN | [2017/29] | Type: | A1 Application with search report | No.: | EP3402947 | Date: | 21.11.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.07.2017 takes the place of the publication of the European patent application. | [2018/47] | Type: | B1 Patent specification | No.: | EP3402947 | Date: | 07.04.2021 | Language: | EN | [2021/14] | Search report(s) | International search report - published on: | US | 20.07.2017 | (Supplementary) European search report - dispatched on: | EP | 31.07.2019 | Classification | IPC: | E04H15/56, E04H15/42 | [2019/35] | CPC: |
E04H15/56 (EP,CN,KR,US);
E04H15/54 (CN,KR,US);
E04H15/34 (KR,US);
E04H15/425 (EP,US);
E04H15/58 (CN)
|
Former IPC [2018/47] | E04H15/56 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | MODULARES ZELT | [2018/47] | English: | MODULAR TENT | [2018/47] | French: | TENTE MODULAIRE | [2018/47] | Entry into regional phase | 02.08.2018 | National basic fee paid | 02.08.2018 | Search fee paid | 02.08.2018 | Designation fee(s) paid | 02.08.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 02.08.2018 | Examination requested [2018/47] | 02.03.2020 | Amendment by applicant (claims and/or description) | 06.10.2020 | Communication of intention to grant the patent | 16.02.2021 | Fee for grant paid | 16.02.2021 | Fee for publishing/printing paid | 16.02.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21162447.3 / EP3854965 | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Fees paid | Renewal fee | 02.08.2018 | Renewal fee patent year 03 | 27.02.2019 | Renewal fee patent year 04 | 27.02.2020 | Renewal fee patent year 05 | 25.02.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.02.2016 | AL | 07.04.2021 | CY | 07.04.2021 | CZ | 07.04.2021 | EE | 07.04.2021 | FI | 07.04.2021 | HR | 07.04.2021 | LT | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | MT | 07.04.2021 | RO | 07.04.2021 | RS | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | TR | 07.04.2021 | BG | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | [2024/42] |
Former [2024/29] | HU | 16.02.2016 | |
AL | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
TR | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2024/22] | HU | 16.02.2016 | |
AL | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2024/20] | HU | 16.02.2016 | |
AL | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2024/18] | HU | 16.02.2016 | |
AL | 07.04.2021 | ||
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2022/44] | AL | 07.04.2021 | |
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2022/29] | AL | 07.04.2021 | |
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2022/26] | AL | 07.04.2021 | |
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2022/23] | CZ | 07.04.2021 | |
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2022/10] | CZ | 07.04.2021 | |
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | CZ | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2022/07] | FI | 07.04.2021 | |
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RS | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2021/51] | FI | 07.04.2021 | |
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RS | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
Former [2021/49] | FI | 07.04.2021 | |
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
BG | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | FI | 07.04.2021 | |
LT | 07.04.2021 | ||
BG | 07.07.2021 | ||
Former [2021/46] | FI | 07.04.2021 | |
LT | 07.04.2021 | Documents cited: | Search | [XA]JPS5030803Y ; | [XAI]FR2707686 (MILLET SOC NOUVELLE [FR]); | [XAI]JP2002227455 (HIROSE SHOKAI CO LTD) | International search | [Y]US3586013 (GLADDEN DAVID J); | [Y]US3656494 (CORNETT CECIL J, et al); | [A]DE3332169 (SALEWA GMBH SPORTGERAETEFAB [DE]); | [XY]US5699820 (EVANS DAVID L [US], et al); | [Y]US5853016 (COWAN MICHAEL FOREST [CA]); | [Y]US2007272289 (COOPER THEODORE JOHN [US]); | [A]US2010170549 (BELL GEOFFREY IAN [GB], et al) | by applicant | JP2002227455 |