blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3509295

EP3509295 - VEHICLE MONITORING SYSTEM, MANAGEMENT DEVICE AND MONITORING METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.09.2021
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  09.10.2020
FormerGrant of patent is intended
Status updated on  17.06.2020
FormerRequest for examination was made
Status updated on  07.06.2019
FormerThe international publication has been made
Status updated on  30.03.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Hitachi Kokusai Electric Inc.
15-12, Nishi-shimbashi 2-chome
Minato-ku
Tokyo 105-8039 / JP
[2019/28]
Inventor(s)01 / MARUTA, Satoshi
c/o HITACHI KOKUSAI ELECTRIC INC.
32 Miyuki-cho
Kodaira-shi Tokyo 187-8511 / JP
 [2019/28]
Representative(s)Strehl Schübel-Hopf & Partner
Maximilianstrasse 54
80538 München / DE
[2019/28]
Application number, filing date16916841.626.09.2016
[2019/28]
WO2016JP78298
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018055774
Date:29.03.2018
Language:JA
[2018/13]
Type: A1 Application with search report 
No.:EP3509295
Date:10.07.2019
Language:EN
[2019/28]
Type: B1 Patent specification 
No.:EP3509295
Date:11.11.2020
Language:EN
[2020/46]
Search report(s)International search report - published on:JP29.03.2018
(Supplementary) European search report - dispatched on:EP05.06.2019
ClassificationIPC:H04N7/18, B60R1/06, B61B1/02, B61D19/02, B61L1/18, H04N21/214, B61L15/00, G08B13/196
[2019/28]
CPC:
H04N7/181 (EP,US); B61B1/02 (US); B60R1/06 (EP,US);
B61D19/02 (EP,US); B61K13/04 (US); B61L15/0072 (EP,US);
B61L15/009 (EP,US); H04N21/214 (EP,US); H04N7/18 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/28]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:FAHRZEUGÜBERWACHUNGSSYSTEM, VERWALTUNGSVORRICHTUNG UND ÜBERWACHUNGSVERFAHREN[2019/28]
English:VEHICLE MONITORING SYSTEM, MANAGEMENT DEVICE AND MONITORING METHOD[2019/28]
French:SYSTÈME, DISPOSITIF ET PROCÉDÉ DE SURVEILLANCE DE VÉHICULE[2019/28]
Entry into regional phase14.03.2019Translation filed 
14.03.2019National basic fee paid 
14.03.2019Search fee paid 
14.03.2019Designation fee(s) paid 
14.03.2019Examination fee paid 
Examination procedure14.03.2019Examination requested  [2019/28]
07.01.2020Amendment by applicant (claims and/or description)
24.06.2020Communication of intention to grant the patent
01.10.2020Fee for grant paid
01.10.2020Fee for publishing/printing paid
01.10.2020Receipt of the translation of the claim(s)
Opposition(s)12.08.2021No opposition filed within time limit [2021/42]
Fees paidRenewal fee
14.03.2019Renewal fee patent year 03
30.09.2019Renewal fee patent year 04
30.09.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.09.2016
AL11.11.2020
AT11.11.2020
CY11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
ES11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
MC11.11.2020
MK11.11.2020
MT11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
[2024/42]
Former [2024/22]HU26.09.2016
AL11.11.2020
AT11.11.2020
CY11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
ES11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
MC11.11.2020
MK11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2023/33]HU26.09.2016
AL11.11.2020
AT11.11.2020
CY11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
ES11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
MC11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2023/30]AL11.11.2020
AT11.11.2020
CY11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
ES11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
MC11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2022/25]AL11.11.2020
AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
ES11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
MC11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2022/23]AL11.11.2020
AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
ES11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2022/10]AL11.11.2020
AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
ES11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
PT11.03.2021
Former [2022/08]AL11.11.2020
AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
ES11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/50]AL11.11.2020
AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SI11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/48]AL11.11.2020
AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
FI11.11.2020
HR11.11.2020
IT11.11.2020
LT11.11.2020
LV11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/46]AL11.11.2020
AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
FI11.11.2020
HR11.11.2020
LT11.11.2020
LV11.11.2020
NL11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/45]AL11.11.2020
AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
FI11.11.2020
HR11.11.2020
LT11.11.2020
LV11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/37]AT11.11.2020
CZ11.11.2020
DK11.11.2020
EE11.11.2020
FI11.11.2020
HR11.11.2020
LT11.11.2020
LV11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/36]AT11.11.2020
CZ11.11.2020
EE11.11.2020
FI11.11.2020
HR11.11.2020
LT11.11.2020
LV11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/35]AT11.11.2020
CZ11.11.2020
FI11.11.2020
HR11.11.2020
LT11.11.2020
LV11.11.2020
PL11.11.2020
RO11.11.2020
RS11.11.2020
SE11.11.2020
SK11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/33]AT11.11.2020
FI11.11.2020
HR11.11.2020
LT11.11.2020
LV11.11.2020
PL11.11.2020
RS11.11.2020
SE11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/32]AT11.11.2020
FI11.11.2020
HR11.11.2020
LV11.11.2020
PL11.11.2020
RS11.11.2020
SE11.11.2020
SM11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/28]AT11.11.2020
FI11.11.2020
HR11.11.2020
LV11.11.2020
PL11.11.2020
RS11.11.2020
SE11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/25]AT11.11.2020
FI11.11.2020
LV11.11.2020
PL11.11.2020
RS11.11.2020
SE11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
IS11.03.2021
PT11.03.2021
Former [2021/23]AT11.11.2020
FI11.11.2020
LV11.11.2020
RS11.11.2020
SE11.11.2020
BG11.02.2021
NO11.02.2021
GR12.02.2021
PT11.03.2021
Former [2021/22]FI11.11.2020
RS11.11.2020
NO11.02.2021
PT11.03.2021
Former [2021/21]FI11.11.2020
PT11.03.2021
Former [2021/20]FI11.11.2020
Documents cited:Search[A]US2011069170  (EMOTO NORISHIGE [JP], et al) [A] 1-7* abstract *;
 [A]JP2011119912  (HITACHI INT ELECTRIC INC) [A] 1-7 * abstract *;
 [A]WO2015141586  (HITACHI INT ELECTRIC INC [JP]) [A] 1-7 * abstract *;
 [A]WO2015145736  (HITACHI INT ELECTRIC INC [JP]) [A] 1-7 * abstract *
International search[A]WO2011148847  (HITACHI LTD [JP], et al) [A] 1-7 * , entire text; all drawings & JP 2011-250496 A & CN 102905933 A *;
 [A]JP2011240846  (HITACHI INT ELECTRIC INC) [A] 1-7 * , entire text; all drawings (Family: none) *;
 [A]JP2012217088  (HITACHI INT ELECTRIC INC) [A] 1-7 * , entire text; all drawings (Family: none) *;
 [A]JP2013184610  (MITSUBISHI ELECTRIC CORP) [A] 1-7* , entire text; all drawings (Family: none) *;
 [A]WO2015141586  (HITACHI INT ELECTRIC INC [JP]) [A] 1-7 * , entire text; all drawings (Family: none) *;
 [A]WO2015145736  (HITACHI INT ELECTRIC INC [JP]) [A] 1-7 * , entire text; all drawings (Family: none) *;
 [A]WO2015146641  (HITACHI INT ELECTRIC INC [JP]) [A] 1-7 * , entire text; all drawings (Family: none) *;
 [A]WO2016051504  (HITACHI INT ELECTRIC INC [JP]) [A] 1-7 * , entire text; all drawings (Family: none) *;
 [A]WO2016121374  (KAWASAKI HEAVY IND LTD [JP]) [A] 1-7 * , entire text; all drawings (Family: none) *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.