EP3556175 - A METHOD FOR MANAGING MEDIA STREAMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 25.06.2021 | ||
Former | Grant of patent is intended Status updated on 23.03.2021 | ||
Former | Request for examination was made Status updated on 20.09.2019 | ||
Former | The international publication has been made Status updated on 30.06.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Teleste Oyj Telestenkatu 1 20660 Littoinen / FI | [2019/43] | Inventor(s) | 01 /
ALAMAUNU, Jyrki Luolavuorentie 46 A 15 20720 Turku / FI | 02 /
VIRTANEN, Kari Perkontie 11 21160 Naantali / FI | 03 /
VÄRE, Jani Valotie 7 20780 Kaarina / FI | [2019/43] | Representative(s) | Berggren Oy P.O. Box 16 Eteläinen Rautatiekatu 10A 00101 Helsinki / FI | [2021/30] |
Former [2019/43] | Berggren Oy, Tampere Visiokatu 1 33720 Tampere / FI | Application number, filing date | 16924485.2 | 19.12.2016 | [2019/43] | WO2016FI50898 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018115568 | Date: | 28.06.2018 | Language: | EN | [2018/26] | Type: | A1 Application with search report | No.: | EP3556175 | Date: | 23.10.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.06.2018 takes the place of the publication of the European patent application. | [2019/43] | Type: | B1 Patent specification | No.: | EP3556175 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Search report(s) | International search report - published on: | FI | 28.06.2018 | (Supplementary) European search report - dispatched on: | EP | 08.11.2019 | Classification | IPC: | H04W84/00, H04W28/16, H04W28/26, H04W84/12, H04H20/62 | [2019/43] | CPC: |
H04H20/62 (EP);
H04N21/2146 (US);
H04N21/2662 (US);
H04N21/4126 (EP,US);
H04N21/436 (US);
H04N21/44029 (US);
H04N21/44209 (US);
H04N21/643 (US);
H04W84/005 (EP);
H04W28/18 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR VERWALTUNG VON MEDIENSTRÖMEN | [2019/43] | English: | A METHOD FOR MANAGING MEDIA STREAMS | [2019/43] | French: | PROCÉDÉ DE GESTION DE FLUX MULTIMÉDIAS | [2019/43] | Entry into regional phase | 18.06.2019 | National basic fee paid | 18.06.2019 | Search fee paid | 18.06.2019 | Designation fee(s) paid | 18.06.2019 | Examination fee paid | Examination procedure | 12.10.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 18.06.2019 | Examination requested [2019/43] | 13.05.2020 | Amendment by applicant (claims and/or description) | 23.03.2021 | Communication of intention to grant the patent | 22.06.2021 | Fee for grant paid | 22.06.2021 | Fee for publishing/printing paid | 22.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 18.06.2019 | Renewal fee patent year 03 | 12.12.2019 | Renewal fee patent year 04 | 15.12.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.12.2016 | AL | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | EE | 28.07.2021 | ES | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | MT | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | TR | 28.07.2021 | BG | 28.10.2021 | GR | 29.10.2021 | IS | 28.11.2021 | PT | 29.11.2021 | IE | 19.12.2021 | LU | 19.12.2021 | BE | 31.12.2021 | [2024/42] |
Former [2024/29] | HU | 19.12.2016 | |
AL | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
MK | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
TR | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
IE | 19.12.2021 | ||
LU | 19.12.2021 | ||
BE | 31.12.2021 | ||
Former [2024/22] | HU | 19.12.2016 | |
AL | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
MK | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
IE | 19.12.2021 | ||
LU | 19.12.2021 | ||
BE | 31.12.2021 | ||
Former [2023/33] | HU | 19.12.2016 | |
AL | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
IE | 19.12.2021 | ||
LU | 19.12.2021 | ||
BE | 31.12.2021 | ||
Former [2023/30] | AL | 28.07.2021 | |
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
IE | 19.12.2021 | ||
LU | 19.12.2021 | ||
BE | 31.12.2021 | ||
Former [2023/01] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
IE | 19.12.2021 | ||
LU | 19.12.2021 | ||
BE | 31.12.2021 | ||
Former [2022/48] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
IE | 19.12.2021 | ||
LU | 19.12.2021 | ||
Former [2022/46] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
LU | 19.12.2021 | ||
Former [2022/33] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/29] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/25] | CZ | 28.07.2021 | |
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/24] | CZ | 28.07.2021 | |
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SK | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/10] | ES | 28.07.2021 | |
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
RS | 28.07.2021 | ||
BG | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/09] | ES | 28.07.2021 | |
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
RS | 28.07.2021 | ||
BG | 28.10.2021 | ||
PT | 29.11.2021 | ||
Former [2022/08] | ES | 28.07.2021 | |
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
BG | 28.10.2021 | Documents cited: | Search | [I]DE102014200226 (BAYERISCHE MOTOREN WERKE AG [DE]) [I] 1-15* paragraphs [0046] - [0060] - [0 77] , [0091] - [0098] - [0105] * | International search | [A]US2011222426 (CHAZEL ANNE-SOPHIE [FR], et al) [A] 1-26 * abstract *; | [A]EP2629538 (ALCATEL LUCENT [FR]) [A] 1-26 * abstract *; | [X]EP2942971 (ICOMERA AB [SE]) [X] 1-26 * abstract, pars. [0006], [0016]-[0019], [0028], [0043], [0048]-[0052] *; | [A]US2011222426 (CHAZEL ANNE-SOPHIE [FR], et al); | [A]EP2629538 (ALCATEL LUCENT [FR]); | [X]EP2942971 (ICOMERA AB [SE]); | [A] - RIISER, H. et al., "Bitrate and video quality planning for mobile streaming scenarios using a GPS-based bandwidth lookup service", Multimedia and Expo (ICME) , 2011 IEEE International Conference, (20110711), pages 1 - 6, XP031964723 [A] 1-26 * DOI:10.1109/ICME.2011.6012045 * DOI: http://dx.doi.org/10.1109/ICME.2011.6012045 | [A] - RIISER, H. ET AL., "Bitrate and video quality planning for mobile streaming scenarios using a GPS-based bandwidth lookup service", MULTIMEDIA AND EXPO (ICME) , 2011 IEEE INTERNATIONAL CONFERENCE, (20110711), pages 1 - 6, XP031964723 DOI: http://dx.doi.org/10.1109/ICME.2011.6012045 | by applicant | DE102014200226 |