EP3553566 - METHOD AND APPARATUS FOR DETECTING GROUND ENVIRONMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.04.2023 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 20.05.2022 | ||
Former | Grant of patent is intended Status updated on 03.02.2022 | ||
Former | Request for examination was made Status updated on 13.09.2019 | ||
Former | The international publication has been made Status updated on 06.07.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2019/42] | Inventor(s) | 01 /
CAO, Tongtong Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
SHAO, Yunfeng Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 03 /
YAO, Jun Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2019/42] | Representative(s) | Maiwald GmbH Elisenhof Elisenstraße 3 80335 München / DE | [N/P] |
Former [2019/42] | Maiwald Patent- und Rechtsanwaltsgesellschaft mbH Elisenhof Elisenstraße 3 80335 München / DE | Application number, filing date | 16925037.0 | 29.12.2016 | [2019/42] | WO2016CN113089 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018119902 | Date: | 05.07.2018 | Language: | ZH | [2018/27] | Type: | A1 Application with search report | No.: | EP3553566 | Date: | 16.10.2019 | Language: | EN | [2019/42] | Type: | B1 Patent specification | No.: | EP3553566 | Date: | 22.06.2022 | Language: | EN | [2022/25] | Search report(s) | International search report - published on: | CN | 05.07.2018 | (Supplementary) European search report - dispatched on: | EP | 11.12.2019 | Classification | IPC: | G01S7/48, G01S17/93, G01S17/42, G01S17/87, G01S17/931, G06K9/62, G06N3/08, G06V10/22, G06V10/60, G06V10/82, G06V20/56 | [2022/08] | CPC: |
G01S7/4802 (EP,US);
G01S7/4913 (KR);
G01S17/42 (EP);
G01S17/87 (EP);
G01S17/93 (EP);
G01S17/931 (EP,US);
G01S7/4808 (EP);
G06F18/23213 (EP);
G06F18/251 (EP);
G06F18/253 (EP);
G06N3/02 (KR,US);
G06V10/22 (EP,US);
G06V10/60 (EP,US);
G06V10/763 (EP,US);
G06V10/764 (EP,US);
G06V10/803 (EP,US);
G06V10/806 (EP,US);
G06V10/82 (EP,US);
|
Former IPC [2022/04] | G01S17/931, G01S7/48, G01S17/93, G01S17/42, G01S17/87 | ||
Former IPC [2020/02] | G01S17/93, G01S7/48, G01S17/42, G01S17/87, G06T7/11 | ||
Former IPC [2019/42] | G01S17/93 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR ERKENNUNG DER BODENUMGEBUNG | [2019/42] | English: | METHOD AND APPARATUS FOR DETECTING GROUND ENVIRONMENT | [2019/42] | French: | PROCÉDÉ ET APPAREIL DE DÉTECTION D'ENVIRONNEMENT TERRESTRE | [2019/42] | Entry into regional phase | 10.07.2019 | Translation filed | 10.07.2019 | National basic fee paid | 10.07.2019 | Search fee paid | 10.07.2019 | Designation fee(s) paid | 10.07.2019 | Examination fee paid | Examination procedure | 10.07.2019 | Examination requested [2019/42] | 17.07.2020 | Amendment by applicant (claims and/or description) | 04.02.2022 | Communication of intention to grant the patent | 09.05.2022 | Fee for grant paid | 09.05.2022 | Fee for publishing/printing paid | 12.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 23.03.2023 | No opposition filed within time limit [2023/22] | Fees paid | Renewal fee | 10.07.2019 | Renewal fee patent year 03 | 23.12.2019 | Renewal fee patent year 04 | 28.12.2020 | Renewal fee patent year 05 | 29.12.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.12.2016 | AL | 22.06.2022 | AT | 22.06.2022 | CY | 22.06.2022 | CZ | 22.06.2022 | DK | 22.06.2022 | EE | 22.06.2022 | ES | 22.06.2022 | FI | 22.06.2022 | HR | 22.06.2022 | IT | 22.06.2022 | LT | 22.06.2022 | LV | 22.06.2022 | MC | 22.06.2022 | MK | 22.06.2022 | MT | 22.06.2022 | NL | 22.06.2022 | PL | 22.06.2022 | RO | 22.06.2022 | RS | 22.06.2022 | SE | 22.06.2022 | SI | 22.06.2022 | SK | 22.06.2022 | SM | 22.06.2022 | TR | 22.06.2022 | BG | 22.09.2022 | NO | 22.09.2022 | GR | 23.09.2022 | IS | 22.10.2022 | PT | 24.10.2022 | IE | 29.12.2022 | LU | 29.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/42] |
Former [2024/29] | HU | 29.12.2016 | |
AL | 22.06.2022 | ||
AT | 22.06.2022 | ||
CY | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
MC | 22.06.2022 | ||
MK | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
TR | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 29.12.2022 | ||
LU | 29.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/27] | HU | 29.12.2016 | |
AL | 22.06.2022 | ||
AT | 22.06.2022 | ||
CY | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
MK | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 29.12.2022 | ||
LU | 29.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 29.12.2016 | |
AL | 22.06.2022 | ||
AT | 22.06.2022 | ||
CY | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 29.12.2022 | ||
LU | 29.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 29.12.2016 | |
AL | 22.06.2022 | ||
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 29.12.2022 | ||
LU | 29.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/11] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 29.12.2022 | ||
LU | 29.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 29.12.2022 | ||
LU | 29.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 29.12.2022 | ||
LU | 29.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
LU | 29.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
LU | 29.12.2022 | ||
Former [2023/37] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/21] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/17] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/12] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/11] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
PT | 24.10.2022 | ||
Former [2023/09] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
PT | 24.10.2022 | ||
Former [2023/08] | AT | 22.06.2022 | |
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2023/07] | AT | 22.06.2022 | |
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2023/02] | FI | 22.06.2022 | |
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/50] | FI | 22.06.2022 | |
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/49] | FI | 22.06.2022 | |
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/47] | FI | 22.06.2022 | |
LT | 22.06.2022 | ||
SE | 22.06.2022 | ||
NO | 22.09.2022 | Documents cited: | Search | [X]EP1569007 (ROSEMOUNT AEROSPACE INC [US]) [X] 1-18 * paragraphs [0001] , [00 2] * * paragraphs [0024] - [0070] *; | [XA] - HARDIE R C ET AL, "SPECTRAL BAND SELECTION AND CLASSIFIER DESIGN FOR A MULTISPECTRAL IMAGING LASER RADAR", OPTICAL ENGINEERING, SOC. OF PHOTO-OPTICAL INSTRUMENTATION ENGINEERS, BELLINGHAM, (19980301), vol. 37, no. 3, doi:10.1117/1.601907, ISSN 0091-3286, pages 752 - 762, XP000771051 [X] 1,2,6-8,12-14,18 * Abstract; chapters 1-3 * [A] 3-5,9-11,15-17 DOI: http://dx.doi.org/10.1117/1.601907 |