| EP3564608 - SKID-MOUNTED COLD BOX, ASSEMBLY MEMBERS THEREOF, AND ASSEMBLING METHOD THEREFOR [Right-click to bookmark this link] | |||
| Former [2019/45] | SKID-MOUNTED COLD BOX, PREFABRICATED STRUCTURE THEREOF, AND ASSEMBLING METHOD THEREFOR | ||
| [2024/21] | Status | No opposition filed within time limit Status updated on 15.08.2025 Database last updated on 20.03.2026 | |
| Former | The patent has been granted Status updated on 06.09.2024 | ||
| Former | Grant of patent is intended Status updated on 06.05.2024 | ||
| Former | Examination is in progress Status updated on 30.04.2021 | ||
| Former | Request for examination was made Status updated on 04.10.2019 | ||
| Former | The international publication has been made Status updated on 06.07.2018 | Most recent event Tooltip | 24.10.2025 | Lapse of the patent in a contracting state New state(s): CH, IE | published on 26.11.2025 [2025/48] | Applicant(s) | For all designated states L'AIR LIQUIDE, Société Anonyme pour l'Etude et l'Exploitation des Procédés Georges Claude 75, Quai d'Orsay 75007 Paris / FR | [2024/41] |
| Former [2019/45] | For all designated states L'AIR LIQUIDE, Société Anonyme pour l'Etude et l'Exploitation des Procédés Georges Claude 75, Quai d'Orsay 75007 Paris / FR | Inventor(s) | 01 /
GAO, Chenxi Floor 20 Tower 1 DELIXI Building No. 28 Xueyuan Road, West Lake District Hangzhou Zhejiang 310012 / CN | 02 /
KURTZ, Remy Floor 20 Tower 1 DELIXI Building No. 28 Xueyuan Road, West Lake District Hangzhou Zhejiang 310012 / CN | 03 /
BRIGLIA, Alain Floor 20 Tower 1 DELIXI Building No. 28 Xueyuan Road, West Lake District Hangzhou Zhejiang 310012 / CN | 04 /
DING, Jia Floor 20 Tower 1 DELIXI Building No. 28 Xueyuan Road, West Lake District Hangzhou Zhejiang 310012 / CN | [2019/45] | Representative(s) | Air Liquide L'Air Liquide S.A. Direction de la Propriété Intellectuelle 75, Quai d'Orsay 75321 Paris Cedex 07 / FR | [2024/41] |
| Former [2019/45] | Grout de Beaufort, François-Xavier L'Air Liquide Direction Propriété Intellectuelle 75, quai d'Orsay 75321 Paris Cedex 07 / FR | Application number, filing date | 16925282.2 | 30.12.2016 | [2019/45] | WO2016CN113663 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018120091 | Date: | 05.07.2018 | Language: | ZH | [2018/27] | Type: | A1 Application with search report | No.: | EP3564608 | Date: | 06.11.2019 | Language: | EN | [2019/45] | Type: | B1 Patent specification | No.: | EP3564608 | Date: | 09.10.2024 | Language: | EN | [2024/41] | Search report(s) | International search report - published on: | CN | 05.07.2018 | (Supplementary) European search report - dispatched on: | EP | 08.07.2020 | Classification | IPC: | F25J3/04, F25J3/02, E04H5/10, F25J1/00, F25J1/02 | [2020/32] | CPC: |
F25J3/04945 (EP,US);
B65D71/0092 (US);
B65D90/16 (US);
E04B1/3483 (US);
E04C3/32 (EP);
E04H5/10 (EP);
E04H5/12 (US);
F25J3/0295 (EP);
E04B1/34315 (US);
|
| Former IPC [2019/45] | F25J3/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | RAHMENMONTIERTE KÜHLBOX, BAUTEILE DAFÜR UND MONTAGEVERFAHREN DAFÜR | [2024/21] | English: | SKID-MOUNTED COLD BOX, ASSEMBLY MEMBERS THEREOF, AND ASSEMBLING METHOD THEREFOR | [2024/21] | French: | BOÎTE FROIDE MONTÉE SUR PATINS, MEMBRES D'ASSEMBLAGE DE CELLE-CI ET SON PROCÉDÉ D'ASSEMBLAGE | [2024/21] |
| Former [2019/45] | RAHMENMONTIERTE KÜHLBOX, VORGEFERTIGTE STRUKTUR DAFÜR UND MONTAGEVERFAHREN DAFÜR | ||
| Former [2019/45] | SKID-MOUNTED COLD BOX, PREFABRICATED STRUCTURE THEREOF, AND ASSEMBLING METHOD THEREFOR | ||
| Former [2019/45] | BOÎTE FROIDE MONTÉE SUR PATINS, STRUCTURE PRÉFABRIQUÉE DE CELLE-CI ET SON PROCÉDÉ D'ASSEMBLAGE | Entry into regional phase | 06.06.2019 | Translation filed | 30.07.2019 | National basic fee paid | 30.07.2019 | Search fee paid | 30.07.2019 | Designation fee(s) paid | 30.07.2019 | Examination fee paid | Examination procedure | 30.07.2019 | Examination requested [2019/45] | 26.01.2021 | Amendment by applicant (claims and/or description) | 29.04.2021 | Despatch of a communication from the examining division (Time limit: M06) | 09.11.2021 | Reply to a communication from the examining division | 07.05.2024 | Communication of intention to grant the patent | 29.08.2024 | Fee for grant paid | 29.08.2024 | Fee for publishing/printing paid | 29.08.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 10.07.2025 | No opposition filed within time limit [2025/38] | Fees paid | Renewal fee | 23.05.2019 | Renewal fee patent year 03 | 23.12.2019 | Renewal fee patent year 04 | 24.12.2020 | Renewal fee patent year 05 | 24.12.2021 | Renewal fee patent year 06 | 29.12.2022 | Renewal fee patent year 07 | 28.12.2023 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 09.10.2024 | BG | 09.10.2024 | CZ | 09.10.2024 | DK | 09.10.2024 | EE | 09.10.2024 | ES | 09.10.2024 | FI | 09.10.2024 | HR | 09.10.2024 | IT | 09.10.2024 | LV | 09.10.2024 | MC | 09.10.2024 | PL | 09.10.2024 | RO | 09.10.2024 | SE | 09.10.2024 | SK | 09.10.2024 | SM | 09.10.2024 | IE | 30.12.2024 | LU | 30.12.2024 | CH | 31.12.2024 | GB | 09.01.2025 | NO | 09.01.2025 | RS | 09.01.2025 | GR | 10.01.2025 | IS | 09.02.2025 | PT | 10.02.2025 | [2025/48] |
| Former [2025/47] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| CZ | 09.10.2024 | ||
| DK | 09.10.2024 | ||
| EE | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| IT | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| MC | 09.10.2024 | ||
| PL | 09.10.2024 | ||
| RO | 09.10.2024 | ||
| SE | 09.10.2024 | ||
| SK | 09.10.2024 | ||
| SM | 09.10.2024 | ||
| LU | 30.12.2024 | ||
| GB | 09.01.2025 | ||
| NO | 09.01.2025 | ||
| RS | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/42] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| CZ | 09.10.2024 | ||
| DK | 09.10.2024 | ||
| EE | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| IT | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| MC | 09.10.2024 | ||
| PL | 09.10.2024 | ||
| RO | 09.10.2024 | ||
| SE | 09.10.2024 | ||
| SK | 09.10.2024 | ||
| SM | 09.10.2024 | ||
| LU | 30.12.2024 | ||
| NO | 09.01.2025 | ||
| RS | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/39] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| CZ | 09.10.2024 | ||
| DK | 09.10.2024 | ||
| EE | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| IT | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| MC | 09.10.2024 | ||
| PL | 09.10.2024 | ||
| RO | 09.10.2024 | ||
| SK | 09.10.2024 | ||
| SM | 09.10.2024 | ||
| LU | 30.12.2024 | ||
| NO | 09.01.2025 | ||
| RS | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/36] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| CZ | 09.10.2024 | ||
| DK | 09.10.2024 | ||
| EE | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| IT | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| MC | 09.10.2024 | ||
| PL | 09.10.2024 | ||
| RO | 09.10.2024 | ||
| SK | 09.10.2024 | ||
| SM | 09.10.2024 | ||
| NO | 09.01.2025 | ||
| RS | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/35] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| DK | 09.10.2024 | ||
| EE | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| MC | 09.10.2024 | ||
| PL | 09.10.2024 | ||
| RO | 09.10.2024 | ||
| SM | 09.10.2024 | ||
| NO | 09.01.2025 | ||
| RS | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/33] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| DK | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| MC | 09.10.2024 | ||
| PL | 09.10.2024 | ||
| SM | 09.10.2024 | ||
| NO | 09.01.2025 | ||
| RS | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/32] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| PL | 09.10.2024 | ||
| SM | 09.10.2024 | ||
| NO | 09.01.2025 | ||
| RS | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/23] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| PL | 09.10.2024 | ||
| NO | 09.01.2025 | ||
| RS | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/22] | AT | 09.10.2024 | |
| BG | 09.10.2024 | ||
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| LV | 09.10.2024 | ||
| NO | 09.01.2025 | ||
| GR | 10.01.2025 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | ||
| Former [2025/21] | BG | 09.10.2024 | |
| ES | 09.10.2024 | ||
| FI | 09.10.2024 | ||
| HR | 09.10.2024 | ||
| IS | 09.02.2025 | ||
| PT | 10.02.2025 | Documents cited: | Search | [A] WO2004005651 (LINDE AG et al.) [A] 1-12 * page 3, line 24 - page 4, line 8; figures 1-6 * * page 5, lines 1,31-35 * * page 6, lines 9-15 * * page 7, line 13 - page 8, line 6 * * page 8, line 25 - page 9, line 12 * | [A] FR2946075 (AIR LIQUIDE et al.) [A] 1-12 * page 4, lines 12-17; figures 12,13 * * page 8, lines 4-25 * | [A] DE1103948 (LINDE EISMASCH AG et al.) [A] 1-12 * paragraphs [0006] , [0016] , [0020]; figure - * | [A] US4331252 (CARREN THOMAS G et al.) [A] 1-12 * column 3, lines 3-40; figures 2-6 * | [A] CN106223669 (ZHEJIANG ZHIHAI CHEMICAL EQUIPMENT ENG CO LTD et al.) [A] 1-12 * paragraphs [0010] - [0013] - [0031] - [0036]; figure 1 * |