blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3351684

EP3351684 - METHOD FOR SETTING A ROAD SURFACE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.03.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  03.04.2020
FormerGrant of patent is intended
Status updated on  16.10.2019
FormerRequest for examination was made
Status updated on  01.02.2019
FormerThe application has been published
Status updated on  22.06.2018
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For:AL  AT  BE  BG  CY  CZ  DE  EE  ES  FR  GR  HR  HU  IE  IS  IT  LT  LU  LV  MC  MK  MT  NL  PL  PT  RO  RS  SI  SK  SM  TR 
Freilinger Beschichtungstechnik GmbH
Mandlstraße 21
80802 München / DE
For:CH  DK  FI  GB  LI  NO  SE 
Gallusberg Anstalt
Schlossstrasse 50
9497 Triesenberg / LI
[2020/35]
Former [2018/30]For all designated states
Freilinger Beschichtungstechnik GmbH
Mandlstraße 21
80802 München / DE
Inventor(s)01 / Freilinger, Christian
Donautalweg 10
4062 Kirchberg-Thening / AT
 [2018/30]
Representative(s)Burgstaller, Peter
Rechtsanwalt Landstrasse 12 Arkade
4020 Linz / AT
[2018/30]
Application number, filing date17151961.418.01.2017
[2018/30]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3351684
Date:25.07.2018
Language:DE
[2018/30]
Type: B1 Patent specification 
No.:EP3351684
Date:06.05.2020
Language:DE
[2020/19]
Search report(s)(Supplementary) European search report - dispatched on:EP11.07.2017
ClassificationIPC:E01C7/14, E01C7/35
[2018/30]
CPC:
E01C7/142 (EP); E01C7/147 (EP); E01C7/351 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/10]
Former [2018/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR ERRICHTUNG EINES FAHRBAHNBELAGS[2018/30]
English:METHOD FOR SETTING A ROAD SURFACE[2018/30]
French:PROCÉDÉ DE PRODUCTION D'UN REVÊTEMENT DE CHAUSSÉE[2018/30]
Examination procedure24.01.2019Examination requested  [2019/10]
24.01.2019Date on which the examining division has become responsible
11.02.2019Amendment by applicant (claims and/or description)
27.02.2019Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
17.10.2019Communication of intention to grant the patent
24.02.2020Receipt of the translation of the claim(s)
25.02.2020Fee for grant paid
25.02.2020Fee for publishing/printing paid
Opposition(s)09.02.2021No opposition filed within time limit [2021/15]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
12.03.2019Request for further processing filed
12.03.2019Full payment received (date of receipt of payment)
Request granted
22.03.2019Decision despatched
Fees paidRenewal fee
24.01.2019Renewal fee patent year 03
25.02.2020Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.01.202004   M06   Fee paid on   25.02.2020
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.01.2017
AL06.05.2020
CY06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MK06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
IE18.01.2021
LU18.01.2021
BE31.01.2021
FR31.01.2021
[2024/22]
Former [2023/33]HU18.01.2017
AL06.05.2020
CY06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
IE18.01.2021
LU18.01.2021
BE31.01.2021
FR31.01.2021
Former [2023/30]AL06.05.2020
CY06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
IE18.01.2021
LU18.01.2021
BE31.01.2021
FR31.01.2021
Former [2022/33]AL06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
IE18.01.2021
LU18.01.2021
BE31.01.2021
FR31.01.2021
Former [2022/07]AL06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
IE18.01.2021
LU18.01.2021
FR31.01.2021
Former [2021/48]AL06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
LU18.01.2021
FR31.01.2021
Former [2021/43]AL06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
LU18.01.2021
Former [2021/40]AL06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/24]AL06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/10]AL06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/09]AL06.05.2020
CZ06.05.2020
EE06.05.2020
ES06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SM06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/04]AL06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RS06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/01]HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
BG06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/51]HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/50]HR06.05.2020
LT06.05.2020
LV06.05.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/49]LT06.05.2020
IS06.09.2020
PT07.09.2020
Former [2020/47]LT06.05.2020
IS06.09.2020
Former [2020/46]IS06.09.2020
Documents cited:Search[XA]JPH02145469  (MITSUBISHI MINING & CEMENT CO, et al) [X] 1,2 * the whole document * [A] 3-8;
 [E]AT517528  (FREILINGER BESCHICHTUNGSTECHNIK UG [DE]) [E] 1-8* the whole document *;
 [IA]  - Schomburg Gmbh, "Sicherheitsdatenblatt BETOCRETE-C16", (20160512), pages 1 - 7, URL: https://www.schomburg.com/de/de/dateien/betocrete-c16-7933a3b0-37f8-4107-8448-761c696e04d9/BETOCRETE-C16_(12)DE.pdf?dl=1, (20170629), XP055386410 [I] 1,2 * the whole document * [A] 3-8
 [IA]  - Schomburg Gmbh, "BETOCRETE-C16, Betonzusatzmittel zur kristallinen Abdichtung, Technisches Merkblatt", (20160512), pages 1 - 2, URL: https://www.schomburg.com/de/de/dateien/betocrete-c16/TM BETOCRETE-C16_dt_3016.pdf?dl=1, (20170629), XP055386418 [I] 1-3 * the whole document * [A] 4-8
by applicantEP2292568
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.