blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3196529

EP3196529 - THERMAL INSULATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.09.2020
Database last updated on 16.11.2024
FormerThe patent has been granted
Status updated on  27.09.2019
FormerGrant of patent is intended
Status updated on  15.05.2019
FormerRequest for examination was made
Status updated on  02.02.2018
FormerThe application has been published
Status updated on  23.06.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2017/30]
Inventor(s)01 / KOZAN, Stuart C.
42 Bear Hill Road
Bethany, CT Connecticut 06524 / US
02 / BOGUE, William
1 West Main Street
Hebron, CT Connecticut 06248 / US
 [2017/30]
Representative(s)Dehns
10 Old Bailey
London EC4M 7NG / GB
[N/P]
Former [2019/44]Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Former [2017/30]Leckey, David Herbert
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17152285.719.01.2017
[2017/30]
Priority number, dateUS20161500426122.01.2016         Original published format: US201615004261
[2017/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3196529
Date:26.07.2017
Language:EN
[2017/30]
Type: B1 Patent specification 
No.:EP3196529
Date:30.10.2019
Language:EN
[2019/44]
Search report(s)(Supplementary) European search report - dispatched on:EP21.06.2017
ClassificationIPC:F16L59/16, B65D25/36, B65D81/38, B65D90/06, F17C13/00
[2017/30]
CPC:
F16L59/163 (EP,US); B32B3/08 (US); F16L59/028 (US);
F16L59/029 (US); F16L59/14 (US); F16L59/166 (EP,US);
F16L59/168 (EP,US); F17C13/001 (EP,US); B32B2307/304 (US);
B32B2571/00 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/10]
Former [2017/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:WÄRMEDÄMMUNG[2017/30]
English:THERMAL INSULATION[2017/30]
French:ISOLATION THERMIQUE[2017/30]
Examination procedure19.01.2017Date on which the examining division has become responsible
26.01.2018Examination requested  [2018/10]
07.03.2018Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
14.05.2018Amendment by applicant (claims and/or description)
16.05.2019Communication of intention to grant the patent
18.09.2019Fee for grant paid
18.09.2019Fee for publishing/printing paid
18.09.2019Receipt of the translation of the claim(s)
Opposition(s)31.07.2020No opposition filed within time limit [2020/41]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
14.05.2018Request for further processing filed
14.05.2018Full payment received (date of receipt of payment)
Request granted
30.05.2018Decision despatched
Fees paidRenewal fee
24.01.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.01.2017
AL30.10.2019
AT30.10.2019
CY30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
MK30.10.2019
MT30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
TR30.10.2019
IE19.01.2020
LU19.01.2020
BG30.01.2020
NO30.01.2020
BE31.01.2020
CH31.01.2020
GR31.01.2020
LI31.01.2020
IS29.02.2020
PT02.03.2020
[2022/32]
Former [2022/27]HU19.01.2017
AL30.10.2019
AT30.10.2019
CY30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
MT30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
TR30.10.2019
IE19.01.2020
LU19.01.2020
BG30.01.2020
NO30.01.2020
BE31.01.2020
CH31.01.2020
GR31.01.2020
LI31.01.2020
IS29.02.2020
PT02.03.2020
Former [2021/08]AL30.10.2019
AT30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
IE19.01.2020
LU19.01.2020
BG30.01.2020
NO30.01.2020
BE31.01.2020
CH31.01.2020
GR31.01.2020
LI31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/51]AL30.10.2019
AT30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SI30.10.2019
SK30.10.2019
SM30.10.2019
LU19.01.2020
BG30.01.2020
NO30.01.2020
BE31.01.2020
CH31.01.2020
GR31.01.2020
LI31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/48]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
ES30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SK30.10.2019
SM30.10.2019
LU19.01.2020
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/46]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SK30.10.2019
SM30.10.2019
LU19.01.2020
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/39]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
MC30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/38]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
FI30.10.2019
HR30.10.2019
IT30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/37]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
SK30.10.2019
SM30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/36]AL30.10.2019
CZ30.10.2019
DK30.10.2019
EE30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/35]AL30.10.2019
CZ30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RO30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/32]AL30.10.2019
FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/25]FI30.10.2019
HR30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
RS30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/24]FI30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
IS29.02.2020
PT02.03.2020
Former [2020/23]FI30.10.2019
LT30.10.2019
LV30.10.2019
NL30.10.2019
PL30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
GR31.01.2020
PT02.03.2020
Former [2020/22]FI30.10.2019
LT30.10.2019
SE30.10.2019
BG30.01.2020
NO30.01.2020
PT02.03.2020
Former [2020/21]NO30.01.2020
Documents cited:Search[X]DE7237684U  (KEUTNER ERNST) [X] 1,12,13,15 * pages 2,3; figures 1,2 *;
 [X]GB1029897  (AIR LIQUIDE) [X] 1,2,4,7,10,12,13 * page 1, line 46 - page 2, line 30; figure 1 *;
 [XI]DE4204451  (LINDE AG [DE]) [X] 1-7,12-15 * column 2, line 59 - column 3, line 49; figure 1; claim 7 * [I] 8,9,11;
 [X]US5575402  (BOTSOLAS CHRISTOS J [US]) [X] 1-3,10,12,13 * column 2, line 52 - column 4, line 22; figures 2-5 *;
 [X]EP2662608  (KOLEKTOR MISSEL INSULATIONS GMBH [DE]) [X] 1,12,13,15* paragraphs [0042] - [0047]; figures 2a,3a *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.