EP3175934 - ROLLING METHOD IN A ROLLING PLANT FOR THE PRODUCTION OF FLAT ROLLED PRODUCTS [Right-click to bookmark this link] | |||
Former [2017/23] | METHOD AND PLANT FOR THE PRODUCTION OF FLAT ROLLED PRODUCTS | ||
[2019/12] | Status | Opposition rejected Status updated on 26.01.2024 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 10.02.2021 | ||
Former | Examination is in progress Status updated on 19.02.2019 | ||
Former | Request for examination was made Status updated on 15.06.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Danieli & C. Officine Meccaniche SpA Via Nazionale, 41 33042 Buttrio (UD) / IT | [2017/23] | Inventor(s) | 01 /
Benedetti, Gianpietro Via San Michele, 36 33019 Tricesimo (UD) / IT | 02 /
Bobig, Paolo Via Mazzini, 17 34075 San Canzian d'Isonzo (GO) / IT | [2017/23] | Representative(s) | Petraz, Gilberto Luigi, et al GLP S.r.l. Viale Europa Unita, 171 33100 Udine / IT | [2017/23] | Application number, filing date | 17152314.5 | 09.05.2011 | [2017/23] | Priority number, date | IT2010UD00091 | 10.05.2010 Original published format: IT UD20100091 | [2017/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3175934 | Date: | 07.06.2017 | Language: | EN | [2017/23] | Type: | B1 Patent specification | No.: | EP3175934 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.04.2017 | Classification | IPC: | B21B1/46 | [2017/23] | CPC: |
B21B1/46 (EP,US);
B21B1/463 (EP,US);
B21B1/466 (EP,US);
B21B13/22 (EP,US);
B21B15/005 (EP,US);
B21B2201/08 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/23] | Title | German: | VERFAHREN ZUM WALZEN IN EINER ANLAGE ZUR HERSTELLUNG VON FLACHGEWALZTEN PRODUKTEN | [2021/08] | English: | ROLLING METHOD IN A ROLLING PLANT FOR THE PRODUCTION OF FLAT ROLLED PRODUCTS | [2021/08] | French: | PROCÉDÉ DE LAMINAGE DANS UNE INSTALLATION DE PRODUCTION DE PRODUITS LAMINÉS PLATS | [2021/08] |
Former [2017/23] | VERFAHREN UND ANLAGE ZUR HERSTELLUNG VON FLACHGEWALZTEN PRODUKTEN | ||
Former [2017/23] | METHOD AND PLANT FOR THE PRODUCTION OF FLAT ROLLED PRODUCTS | ||
Former [2017/23] | PROCÉDÉ ET INSTALLATION DE PRODUCTION DE PRODUITS LAMINÉS PLATS | Examination procedure | 19.01.2017 | Examination requested [2017/23] | 19.01.2017 | Date on which the examining division has become responsible | 27.03.2018 | Amendment by applicant (claims and/or description) | 22.02.2019 | Despatch of a communication from the examining division (Time limit: M06) | 09.10.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 18.12.2019 | Reply to a communication from the examining division | 13.01.2021 | Cancellation of oral proceeding that was planned for 27.01.2021 | 27.01.2021 | Date of oral proceedings (cancelled) | 11.02.2021 | Communication of intention to grant the patent | 13.05.2021 | Fee for grant paid | 13.05.2021 | Fee for publishing/printing paid | 13.05.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP11725499.5 / EP2569104 | EP15177342.1 / EP2957358 | Opposition(s) | Opponent(s) | 01
29.03.2022
31.03.2022
ADMISSIBLE SMS group GmbH Eduard-Schloemann-Strasse 4 40237 Düsseldorf / DE Opponent's representative Hemmerich & Kollegen Hammerstraße 2 57072 Siegen / DE | [2022/18] | 26.04.2022 | Invitation to proprietor to file observations on the notice of opposition | 01.09.2022 | Reply of patent proprietor to notice(s) of opposition | 18.09.2023 | Cancellation of oral proceeding that was planned for 08.11.2023 | 10.10.2023 | Date of despatch of rejection of opposition | 20.10.2023 | Legal effect of rejection of opposition [2024/09] | 08.11.2023 | Date of oral proceedings | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 18.12.2019 | Request for further processing filed | 18.12.2019 | Full payment received (date of receipt of payment) Request granted | 09.01.2020 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 27.03.2018 | Request for further processing filed | 27.03.2018 | Full payment received (date of receipt of payment) Request granted | 27.04.2018 | Decision despatched | The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application | 27.03.2018 | Request for further processing filed | 27.03.2018 | Full payment received (date of receipt of payment) Request granted | 27.04.2018 | Decision despatched | Fees paid | Renewal fee | 19.01.2017 | Renewal fee patent year 03 | 19.01.2017 | Renewal fee patent year 04 | 19.01.2017 | Renewal fee patent year 05 | 19.01.2017 | Renewal fee patent year 06 | 24.05.2017 | Renewal fee patent year 07 | 25.05.2018 | Renewal fee patent year 08 | 21.05.2019 | Renewal fee patent year 09 | 20.05.2020 | Renewal fee patent year 10 | 19.05.2021 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.05.2011 | AL | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | MT | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | TR | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | IE | 09.05.2022 | LU | 09.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | [2024/42] |
Former [2024/29] | HU | 09.05.2011 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
TR | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/22] | HU | 09.05.2011 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/20] | HU | 09.05.2011 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/18] | HU | 09.05.2011 | |
AL | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/25] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/20] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/19] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
LU | 09.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/09] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
LU | 09.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/08] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
LU | 09.05.2022 | ||
Former [2023/06] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | CZ | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/10] | CZ | 30.06.2021 | |
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | CZ | 30.06.2021 | |
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | CZ | 30.06.2021 | |
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [A]DE19613718 (MANNESMANN AG [DE]) [A] 1 * column 3, line 23 - column 4, line 20; figure 1 *; | [A]WO2007073841 (SMS DEMAG AG [DE], et al) [A] 1-7 * page 3, line 19 - page 14, line l; figure 1 *; | [A]EP1868748 (ARVEDI GIOVANNI [IT]) [A] 1* figures 1,3; claims 1-5 *; | [X]DE102008003222 (SMS DEMAG AG [DE]) [X] 1-7 * paragraph [0030] - paragraph [0071]; claims 1-14 *; | [XD]WO2009065840 (SIEMENS VAI METALS TECH GMBH [AT], et al) [XD] 1-7 * page 3, paragraph 3 - page 6, paragraph 1; figures 1-2 * * page 11, line 13 - page 13, paragraph 1 * | Examination | EP3175934 | by applicant | EP1868748 | WO2009065840 | Opposition | WO8911363 | WO9746332 | JP2000271607 | WO2007073841 | DE102008003222 |