Extract from the Register of European Patents

EP About this file: EP3200070

EP3200070 - COUPLED DEVICE DEPLOYMENT LOCATION CLASSIFICATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.12.2023
Database last updated on 11.04.2026
FormerThe patent has been granted
Status updated on  23.12.2022
FormerGrant of patent is intended
Status updated on  05.10.2022
FormerExamination is in progress
Status updated on  16.04.2021
FormerRequest for examination was made
Status updated on  01.06.2018
FormerThe application has been published
Status updated on  04.07.2017
Most recent event   Tooltip19.12.2025Lapse of the patent in a contracting state
New state(s): TR
published on 21.01.2026  [2026/04]
Applicant(s)For all designated states
NCR Corporation
864 Spring St. NW
Atlanta, GA 30308-1007 / US
[2018/20]
Former [2017/31]For all designated states
NCR Corporation
3097 Satellite Boulevard
Duluth, GA 30096 / US
Inventor(s)01 / Caine, Nicholas
4855 Truman Mountain Road
Gainesville, GA Georgia 30506 / US
02 / Mayo, David
2990 Chamonix Dr.
Cumming, GA Georgia 30041 / US
 [2017/31]
Representative(s)Secerna LLP
The Old Fire Station
18 Clifford Street
York YO1 9RD / GB
[2023/04]
Former [2017/31]Secerna LLP
The Catalyst
Baird Lane, Heslington East
York YO10 5GA / GB
Application number, filing date17153134.625.01.2017
[2017/31]
Priority number, dateUS20161501159931.01.2016         Original published format: US201615011599
[2017/31]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP3200070
Date:02.08.2017
Language:EN
[2017/31]
Type: A3 Search report 
No.:EP3200070
Date:29.11.2017
Language:EN
[2017/48]
Type: B1 Patent specification 
No.:EP3200070
Date:25.01.2023
Language:EN
[2023/04]
Search report(s)(Supplementary) European search report - dispatched on:EP02.11.2017
ClassificationIPC:G06F9/4401, G06F13/38, G06F21/62, G06F21/85, G06Q20/20, G06Q20/32
[2022/36]
CPC:
G06F9/4411 (EP,US); G06F13/4068 (US); G06F13/36 (US);
G06F13/385 (EP,US); G06F13/4282 (US); G06F21/6209 (EP,US);
G06F21/85 (EP,US); G06K7/084 (US); G06Q20/20 (EP,US);
G06Q20/3224 (EP,US); G06F2213/0042 (EP,US); G06F2221/2113 (EP,US);
G06F2221/2141 (EP,US); G06F2221/2145 (EP,US) (-)
Former IPC [2017/48]G06F9/44, G06F13/38, G06Q20/20, G06F21/85, G06K7/08
Former IPC [2017/31]G06F9/44, G06F13/38, G06Q20/20, G06F21/85
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/27]
Former [2017/31]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:EINSATZPOSITIONSKLASSIFIZIERUNG EINER GEKOPPELTEN VORRICHTUNG[2017/31]
English:COUPLED DEVICE DEPLOYMENT LOCATION CLASSIFICATION[2017/31]
French:CLASSIFICATION D'EMPLACEMENT DE DÉPLOIEMENT DE DISPOSITIF COUPLÉ[2017/31]
Examination procedure25.01.2017Date on which the examining division has become responsible
12.03.2018Amendment by applicant (claims and/or description)
29.05.2018Examination requested  [2018/27]
16.04.2021Despatch of a communication from the examining division (Time limit: M04)
30.07.2021Reply to a communication from the examining division
04.04.2022Despatch of a communication from the examining division (Time limit: M04)
27.06.2022Reply to a communication from the examining division
06.10.2022Communication of intention to grant the patent
16.12.2022Fee for grant paid
16.12.2022Fee for publishing/printing paid
16.12.2022Receipt of the translation of the claim(s)
Opposition(s)26.10.2023No opposition filed within time limit [2024/01]
Fees paidRenewal fee
31.01.2019Renewal fee patent year 03
24.12.2019Renewal fee patent year 04
01.02.2021Renewal fee patent year 05
31.01.2022Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY25.01.2017
HU25.01.2017
AT25.01.2023
BG25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
IE25.01.2023
IT25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SI25.01.2023
SK25.01.2023
SM25.01.2023
TR25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
[2026/04]
Former [2025/39]CY25.01.2017
HU25.01.2017
AT25.01.2023
BG25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
IE25.01.2023
IT25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SI25.01.2023
SK25.01.2023
SM25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2025/36]CY25.01.2017
AT25.01.2023
BG25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
IE25.01.2023
IT25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SI25.01.2023
SK25.01.2023
SM25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2024/51]AT25.01.2023
BG25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
IE25.01.2023
IT25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SI25.01.2023
SK25.01.2023
SM25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2024/26]AT25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
IE25.01.2023
IT25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SI25.01.2023
SK25.01.2023
SM25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2024/11]AT25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
IE25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SI25.01.2023
SK25.01.2023
SM25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2024/08]AT25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
IE25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SK25.01.2023
SM25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2023/50]AT25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SK25.01.2023
SM25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2023/49]AT25.01.2023
CZ25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RO25.01.2023
RS25.01.2023
SE25.01.2023
SM25.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2023/48]AT25.01.2023
DK25.01.2023
EE25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
MC25.01.2023
NL25.01.2023
PL25.01.2023
RS25.01.2023
SE25.01.2023
SM25.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2023/47]AT25.01.2023
DK25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
NL25.01.2023
PL25.01.2023
RS25.01.2023
SE25.01.2023
SM25.01.2023
CH31.01.2023
LI31.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2023/46]AT25.01.2023
DK25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
NL25.01.2023
PL25.01.2023
RS25.01.2023
SE25.01.2023
SM25.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2023/43]AT25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LU25.01.2023
LV25.01.2023
NL25.01.2023
PL25.01.2023
RS25.01.2023
SE25.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2023/39]AT25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LV25.01.2023
NL25.01.2023
PL25.01.2023
RS25.01.2023
SE25.01.2023
NO25.04.2023
GR26.04.2023
IS25.05.2023
PT25.05.2023
Former [2023/38]AT25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LV25.01.2023
NL25.01.2023
PL25.01.2023
RS25.01.2023
SE25.01.2023
NO25.04.2023
GR26.04.2023
PT25.05.2023
Former [2023/37]AT25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LV25.01.2023
NL25.01.2023
RS25.01.2023
SE25.01.2023
NO25.04.2023
GR26.04.2023
PT25.05.2023
Former [2023/36]AT25.01.2023
ES25.01.2023
FI25.01.2023
HR25.01.2023
LT25.01.2023
LV25.01.2023
NL25.01.2023
RS25.01.2023
SE25.01.2023
NO25.04.2023
PT25.05.2023
Former [2023/35]AT25.01.2023
ES25.01.2023
HR25.01.2023
LT25.01.2023
NL25.01.2023
RS25.01.2023
NO25.04.2023
PT25.05.2023
Former [2023/34]ES25.01.2023
LT25.01.2023
NL25.01.2023
RS25.01.2023
PT25.05.2023
Former [2023/33]ES25.01.2023
LT25.01.2023
NL25.01.2023
Former [2023/31]NL25.01.2023
Documents cited:Search[XI] US7203774  (ZHOU SHUDONG et al.) [X] 1-5,10 * abstract * * column 2, line 50 - column 3, line 22; figure 2 * * column 5, line 52 - column 6, line 8 * * column 6, lines 9-33, 47-59; figure 4 * * column 7, line 18 - column 9, line 17; figure 6 * * column 9, line 46 - column 10, line 32; figure 7 * * column 10, line 33 - column 11, line 10; figure 8 *[I] 6-9,11-14
 [A] US2009240844  (LEE YI-LUNG et al.) [A] 1-14 * abstract * * paragraph [0024] - paragraph [0029]; figure 1 *
 [A] US6535947  (AMONI SERGIO et al.) [A] 1-14 * abstract * * column 5, lines 13-28; figure 2 * * column 5, line 46 - column 6, line 42; figure 3 * * column 7, lines 21-43; figure 4 * * column 7, line 60 - column 8, line 40; figure 5 *
 [A] US2002143921  (STEPHAN YANN et al.) [A] 1-14 * abstract * * paragraphs [0030] , [0040]; figure 1 * * paragraphs [0041] - [0042]; figure 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.