EP3203589 - HOUSING FOR ELECTRICAL PLUG CONNECTIONS AND METHOD OF PRODUCING THE HOUSING [Right-click to bookmark this link] | |||
Former [2017/32] | HOUSING FOR ELECTRICAL PLUG CONNECTIONS, USE AND METHOD OF PRODUCING THE HOUSING | ||
[2018/21] | Status | No opposition filed within time limit Status updated on 20.06.2024 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 14.07.2023 | ||
Former | Grant of patent is intended Status updated on 15.03.2023 | ||
Former | Examination is in progress Status updated on 05.10.2018 | ||
Former | Request for examination was made Status updated on 19.09.2018 | ||
Former | Grant of patent is intended Status updated on 14.05.2018 | ||
Former | Request for examination was made Status updated on 16.02.2018 | ||
Former | The application has been published Status updated on 07.07.2017 | Most recent event Tooltip | 20.06.2024 | No opposition filed within time limit | published on 24.07.2024 [2024/30] | Applicant(s) | For all designated states Küster Holding GmbH Am Bahnhof 13 35630 Ehringshausen / DE | [2017/32] | Inventor(s) | 01 /
Keller, Oliver Triftstrasse 3 56477 Nister-Möhrendorf / DE | 02 /
Schütz, Thorsten Brunnenstrasse 46 35630 Ehringhausen-Kölschhausen / DE | [2017/32] | Representative(s) | Müller, Eckhard Mühlstrasse 9a 65597 Hünfelden-Dauborn / DE | [2017/32] | Application number, filing date | 17154182.4 | 01.02.2017 | [2017/32] | Priority number, date | DE201610101762 | 02.02.2016 Original published format: DE102016101762 | [2017/32] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3203589 | Date: | 09.08.2017 | Language: | DE | [2017/32] | Type: | B1 Patent specification | No.: | EP3203589 | Date: | 16.08.2023 | Language: | DE | [2023/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.06.2017 | Classification | IPC: | H01R4/72, H02G15/013, H02G15/18, H05K5/00, // H01R13/52 | [2023/12] | CPC: |
H01R4/72 (EP);
H01R13/5208 (EP);
H01R2107/00 (EP);
H01R2201/26 (EP)
|
Former IPC [2017/32] | H01R13/52 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/12] |
Former [2017/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GEHÄUSE FÜR ELEKTRISCHE STECKVERBINDUNGEN UND EIN VERFAHREN ZUR HERSTELLUNG DES GEHÄUSES | [2018/21] | English: | HOUSING FOR ELECTRICAL PLUG CONNECTIONS AND METHOD OF PRODUCING THE HOUSING | [2018/21] | French: | BOÎTIER POUR CONNECTEUR ÉLECTRIQUE ET PROCÉDÉ DE PRODUCTION DUDIT BOÎTIER | [2018/21] |
Former [2017/32] | GEHÄUSE FÜR ELEKTRISCHE STECKVERBINDUNGEN, DESSEN VERWENDUNG UND EIN VERFAHREN ZUR HERSTELLUNG DES GEHÄUSES | ||
Former [2017/32] | HOUSING FOR ELECTRICAL PLUG CONNECTIONS, USE AND METHOD OF PRODUCING THE HOUSING | ||
Former [2017/32] | BOÎTIER POUR CONNECTEUR ÉLECTRIQUE, SON UTILISATION ET PROCÉDÉ DE PRODUCTION DUDIT BOÎTIER | Examination procedure | 01.02.2017 | Date on which the examining division has become responsible | 09.02.2018 | Amendment by applicant (claims and/or description) | 09.02.2018 | Examination requested [2018/12] | 15.05.2018 | Communication of intention to grant the patent | 14.09.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 08.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 19.12.2018 | Reply to a communication from the examining division | 20.11.2019 | Despatch of a communication from the examining division (Time limit: M06) | 14.05.2020 | Reply to a communication from the examining division | 15.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 14.04.2021 | Reply to a communication from the examining division | 01.12.2021 | Despatch of a communication from the examining division (Time limit: M04) | 30.03.2022 | Reply to a communication from the examining division | 16.03.2023 | Communication of intention to grant the patent | 10.07.2023 | Fee for grant paid | 10.07.2023 | Fee for publishing/printing paid | 10.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 17.05.2024 | No opposition filed within time limit [2024/30] | Fees paid | Renewal fee | 18.02.2019 | Renewal fee patent year 03 | 27.01.2020 | Renewal fee patent year 04 | 26.02.2021 | Renewal fee patent year 05 | 06.01.2022 | Renewal fee patent year 06 | 31.01.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 16.08.2023 | DK | 16.08.2023 | EE | 16.08.2023 | ES | 16.08.2023 | FI | 16.08.2023 | HR | 16.08.2023 | LT | 16.08.2023 | LV | 16.08.2023 | NL | 16.08.2023 | PL | 16.08.2023 | RO | 16.08.2023 | RS | 16.08.2023 | SE | 16.08.2023 | SK | 16.08.2023 | SM | 16.08.2023 | NO | 16.11.2023 | GR | 17.11.2023 | IS | 16.12.2023 | PT | 18.12.2023 | [2024/23] |
Former [2024/22] | CZ | 16.08.2023 | |
DK | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/20] | FI | 16.08.2023 | |
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/10] | FI | 16.08.2023 | |
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/09] | FI | 16.08.2023 | |
LT | 16.08.2023 | ||
NL | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
Former [2024/08] | LT | 16.08.2023 | |
NL | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | Documents cited: | Search | [X]DE102004051367 (AUTONETWORKS TECHNOLOGIES LTD [JP], et al) [X] 1 * Ausführungsform 2;; figures 6-10 *; | [XAI]WO2008141458 (TM4 INC [CA], et al) [X] 1 * figures 1-9 * * paragraph [0025] * [A] 7 [I] 2-6,8-13; | [XAI]US2011207354 (TASHIRO HARUNORI [JP]) [X] 1 * figures 1-11 * [A] 7[I] 2-6,8-13 | Examination | US3963295 | DE2927558 | DE10050738 | DE102004028254 | US2007131444 | DE202009014457U | WO2013178727 | DE102014102745 | by applicant | DE3440400 | US2008020626 | US2009264017 | DE102008051468 | DE102009057426 | US2012135632 | US2014190745 |