blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3357613

EP3357613 - ASSEMBLY OF A BLADE PORTION FOR A METAL CUTTING GROOVING TOOL AND INSERT [Right-click to bookmark this link]
Former [2018/32]BLADE PORTION FOR A METAL CUTTING GROOVING TOOL
[2022/32]
StatusNo opposition filed within time limit
Status updated on  08.12.2023
Database last updated on 13.07.2024
FormerThe patent has been granted
Status updated on  30.12.2022
FormerGrant of patent is intended
Status updated on  18.09.2022
FormerRequest for examination was made
Status updated on  15.02.2019
FormerThe application has been published
Status updated on  06.07.2018
Most recent event   Tooltip16.02.2024Lapse of the patent in a contracting state
New state(s): BE, SI
published on 20.03.2024  [2024/12]
Applicant(s)For all designated states
Sandvik Intellectual Property AB
811 81 Sandviken / SE
[2018/32]
Inventor(s)01 / LUNDSTRÖM, Staffan
Salamandervägen 25
SE-806 38 GÄVLE / SE
02 / ANDERSTEDT, Johan
Barrsätragatan 46A
SE-811 40 Sandviken / SE
 [2018/32]
Representative(s)Sandvik
Sandvik Intellectual Property AB
811 81 Sandviken / SE
[2018/32]
Application number, filing date17154542.903.02.2017
[2018/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3357613
Date:08.08.2018
Language:EN
[2018/32]
Type: B1 Patent specification 
No.:EP3357613
Date:01.02.2023
Language:EN
[2023/05]
Search report(s)(Supplementary) European search report - dispatched on:EP11.08.2017
ClassificationIPC:B23B27/08, B23B29/04
[2018/32]
CPC:
B23B27/086 (EP,KR); B26D3/065 (US); B23B29/02 (US);
B23B29/043 (EP,KR); B23B2205/02 (EP,KR)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/12]
Former [2018/32]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANORDNUNG AUS STECHKLINGE FÜR EINSTECHWERKZEUG FÜR DIE BEARBEITUNG VON METALLEN UND SCHNEIDEINSATZ[2022/32]
English:ASSEMBLY OF A BLADE PORTION FOR A METAL CUTTING GROOVING TOOL AND INSERT[2022/32]
French:ENSEMBLE DE LAME FOUR OUTIL DE RAINURAGE EN MÉTAUX ET INSERT[2022/32]
Former [2018/32]STECHKLINGE FÜR EINSTECHWERKZEUG FÜR DIE BEARBEITUNG VON METALLEN
Former [2018/32]BLADE PORTION FOR A METAL CUTTING GROOVING TOOL
Former [2018/32]LAME FOUR OUTIL DE RAINURAGE EN MÉTAUX
Examination procedure29.01.2019Amendment by applicant (claims and/or description)
08.02.2019Examination requested  [2019/12]
08.02.2019Date on which the examining division has become responsible
19.09.2022Communication of intention to grant the patent
21.12.2022Fee for grant paid
21.12.2022Fee for publishing/printing paid
21.12.2022Receipt of the translation of the claim(s)
Opposition(s)03.11.2023No opposition filed within time limit [2024/02]
Fees paidRenewal fee
28.02.2019Renewal fee patent year 03
02.03.2020Renewal fee patent year 04
01.03.2021Renewal fee patent year 05
28.02.2022Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT01.02.2023
CZ01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
MC01.02.2023
NL01.02.2023
PL01.02.2023
RO01.02.2023
RS01.02.2023
SE01.02.2023
SI01.02.2023
SK01.02.2023
SM01.02.2023
IE03.02.2023
LU03.02.2023
BE28.02.2023
CH28.02.2023
LI28.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
[2024/11]
Former [2024/08]AT01.02.2023
CZ01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
MC01.02.2023
NL01.02.2023
PL01.02.2023
RO01.02.2023
RS01.02.2023
SE01.02.2023
SK01.02.2023
SM01.02.2023
IE03.02.2023
LU03.02.2023
CH28.02.2023
LI28.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/50]AT01.02.2023
CZ01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RO01.02.2023
RS01.02.2023
SE01.02.2023
SK01.02.2023
SM01.02.2023
LU03.02.2023
CH28.02.2023
LI28.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/49]AT01.02.2023
CZ01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RO01.02.2023
RS01.02.2023
SE01.02.2023
SM01.02.2023
LU03.02.2023
CH28.02.2023
LI28.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/48]AT01.02.2023
DK01.02.2023
EE01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RS01.02.2023
SE01.02.2023
SM01.02.2023
CH28.02.2023
LI28.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/46]AT01.02.2023
DK01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RS01.02.2023
SE01.02.2023
SM01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/39]AT01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RS01.02.2023
SE01.02.2023
NO01.05.2023
GR02.05.2023
IS01.06.2023
PT01.06.2023
Former [2023/38]AT01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
PL01.02.2023
RS01.02.2023
SE01.02.2023
NO01.05.2023
GR02.05.2023
PT01.06.2023
Former [2023/37]AT01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
RS01.02.2023
SE01.02.2023
NO01.05.2023
GR02.05.2023
PT01.06.2023
Former [2023/36]AT01.02.2023
ES01.02.2023
FI01.02.2023
HR01.02.2023
LT01.02.2023
LV01.02.2023
NL01.02.2023
RS01.02.2023
SE01.02.2023
NO01.05.2023
PT01.06.2023
Former [2023/35]AT01.02.2023
ES01.02.2023
HR01.02.2023
LT01.02.2023
NL01.02.2023
RS01.02.2023
NO01.05.2023
PT01.06.2023
Former [2023/34]ES01.02.2023
LT01.02.2023
RS01.02.2023
PT01.06.2023
Former [2023/33]ES01.02.2023
LT01.02.2023
Documents cited:Search[A]US3230802  (JOHNSON GEORGE B) [A] 1-16 * column 4, line 32 - line 55 ** figure - *;
 [XI]US3551977  (NOVKOV RAYMOND E) [X] 1,2,4,5,9-12,14-16 * column 2, line 52 - column 3, line 33 * * column 3, line 50 - line 56 * * figures 1-5 * [I] 3,13;
 [A]US4167129  (LEUNISSEN HENRY) [A] 1,16 * column 1, line 16 - line 28 * * column 2, line 20 - column 3, line 18 * * figures 1-3 *;
 [A]US4213356  (ARMITAGE HARRY J [US]) [A] 1,4,9-16 * column 4, line 59 - column 5, line 48 * * figures 1-6,12,13 *;
 [X]CN203843202U  (CHENGDU BANGPU ALLOY MATERIALS CO LTD) [X] 1,4-6,9-13,16 * figure - *;
 [A]US2015003921  (ANDERSSON CLAES [SE], et al) [A] 7,8,13,16 * paragraphs [0035] , [0038] * * figures 1,3,15 *;
 [XAI]US2015063929  (HECHT GIL [IL]) [X] 1,2,4-12,16 * paragraphs [0042] - [0045] - [0 52] * * figures 1-6 * [A] 13-15 [I] 3
by applicantUS5135336
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.