| EP3208608 - METHODS FOR RADIOGRAPHIC AND CT INSPECTION OF WORKPIECES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.12.2020 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 10.01.2020 | ||
| Former | Grant of patent is intended Status updated on 15.08.2019 | ||
| Former | Request for examination was made Status updated on 02.03.2018 | ||
| Former | The application has been published Status updated on 21.07.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2020/07] |
| Former [2017/34] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
ABBOTT, David Henry 1 Neumann Way Cincinnati, OH Ohio 45215 / US | 02 /
SABO, Nicolas Kristopher 9701 Windisch Road West Chester, OH Ohio 45069 / US | [2017/34] | Representative(s) | Hafner & Kohl PartmbB Schleiermacherstraße 25 90491 Nürnberg / DE | [N/P] |
| Former [2020/07] | Hafner & Kohl Patent- und Rechtsanwälte Partnerschaft mbB Schleiermacherstraße 25 90491 Nürnberg / DE | ||
| Former [2017/34] | Pöpper, Evamaria General Electric Technology GmbH GE Corporate Intellectual Property Brown Boveri Strasse 7 5400 Baden / CH | Application number, filing date | 17155845.5 | 13.02.2017 | [2017/34] | Priority number, date | US201615044921 | 16.02.2016 Original published format: US201615044921 | [2017/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3208608 | Date: | 23.08.2017 | Language: | EN | [2017/34] | Type: | B1 Patent specification | No.: | EP3208608 | Date: | 12.02.2020 | Language: | EN | [2020/07] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.06.2017 | Classification | IPC: | G01N23/04 | [2017/34] | CPC: |
G01N23/04 (EP,US);
G01N23/046 (CN,US);
B22F10/00 (CN);
B33Y10/00 (CN);
G01N23/083 (US);
B22F10/28 (EP,CN,US);
G01N2223/404 (EP,US);
G01N2223/63 (EP,US);
G01N2223/646 (EP,US);
Y02P10/25 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/14] |
| Former [2017/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR RADIOGRAFIE- UND CT-INSPEKTION VON WERKSTÜCKEN | [2017/34] | English: | METHODS FOR RADIOGRAPHIC AND CT INSPECTION OF WORKPIECES | [2017/34] | French: | PROCÉDÉS D'INSPECTION RADIOGRAPHIQUE ET CT DE PIÈCES | [2017/34] | Examination procedure | 13.02.2017 | Date on which the examining division has become responsible | 24.01.2018 | Amendment by applicant (claims and/or description) | 23.02.2018 | Examination requested [2018/14] | 16.08.2019 | Communication of intention to grant the patent | 17.12.2019 | Fee for grant paid | 17.12.2019 | Fee for publishing/printing paid | 17.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 13.11.2020 | No opposition filed within time limit [2021/03] | Fees paid | Renewal fee | 28.02.2019 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.02.2017 | AL | 12.02.2020 | AT | 12.02.2020 | CY | 12.02.2020 | CZ | 12.02.2020 | DK | 12.02.2020 | EE | 12.02.2020 | ES | 12.02.2020 | FI | 12.02.2020 | HR | 12.02.2020 | IT | 12.02.2020 | LT | 12.02.2020 | LV | 12.02.2020 | MC | 12.02.2020 | MK | 12.02.2020 | MT | 12.02.2020 | NL | 12.02.2020 | PL | 12.02.2020 | RO | 12.02.2020 | RS | 12.02.2020 | SE | 12.02.2020 | SI | 12.02.2020 | SK | 12.02.2020 | SM | 12.02.2020 | TR | 12.02.2020 | IE | 13.02.2020 | LU | 13.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | BG | 12.05.2020 | NO | 12.05.2020 | GR | 13.05.2020 | IS | 12.06.2020 | PT | 05.07.2020 | [2022/31] |
| Former [2022/30] | HU | 13.02.2017 | |
| AL | 12.02.2020 | ||
| AT | 12.02.2020 | ||
| CY | 12.02.2020 | ||
| CZ | 12.02.2020 | ||
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| MT | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| TR | 12.02.2020 | ||
| IE | 13.02.2020 | ||
| LU | 13.02.2020 | ||
| BE | 29.02.2020 | ||
| CH | 29.02.2020 | ||
| LI | 29.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2022/27] | HU | 13.02.2017 | |
| AT | 12.02.2020 | ||
| CY | 12.02.2020 | ||
| CZ | 12.02.2020 | ||
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| MT | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| TR | 12.02.2020 | ||
| IE | 13.02.2020 | ||
| LU | 13.02.2020 | ||
| BE | 29.02.2020 | ||
| CH | 29.02.2020 | ||
| LI | 29.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/10] | AT | 12.02.2020 | |
| CZ | 12.02.2020 | ||
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| IE | 13.02.2020 | ||
| LU | 13.02.2020 | ||
| BE | 29.02.2020 | ||
| CH | 29.02.2020 | ||
| LI | 29.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/08] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| IE | 13.02.2020 | ||
| LU | 13.02.2020 | ||
| CH | 29.02.2020 | ||
| LI | 29.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/52] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| LU | 13.02.2020 | ||
| CH | 29.02.2020 | ||
| LI | 29.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/50] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| LU | 13.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/49] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| LU | 13.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/48] | DK | 12.02.2020 | |
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| LU | 13.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/47] | DK | 12.02.2020 | |
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| LU | 13.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| Former [2020/45] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| Former [2020/40] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| Former [2020/39] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| Former [2020/38] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| Former [2020/37] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| NO | 12.05.2020 | ||
| Former [2020/35] | FI | 12.02.2020 | |
| NO | 12.05.2020 | Documents cited: | Search | [XI] US2014005533 (GRASRUCK MICHAEL et al.) [I] 2,3,6-9,11-15 | [XAI] US6619368 (SPRINGGATE MARK E et al.) [A] 6-9 [I] 2-4,11-15 | [XI] CHEUL MUU SIM ET AL: "Detecting Internal Hot Corrosion of In-service Turbine Blades Using Neutron Tomography with Gd Tagging", JOURNAL OF NONDESTRUCTIVE EVALUATION., vol. 33, no. 4, 13 May 2014 (2014-05-13), US, pages 493 - 503, XP055377694, ISSN: 0195-9298, DOI: 10.1007/s10921-014-0244-x DOI: http://dx.doi.org/10.1007/s10921-014-0244-x | [XAI] BRENIZER J S ET AL: "The use of contrast agents to enhance crack detection via neutron radiography", NDT & E INTERNATI, BUTTERWORTH-HEINEMANN, OXFORD, GB, vol. 32, no. 1, 23 June 1999 (1999-06-23), pages 37 - 42, XP004292643, ISSN: 0963-8695, DOI: 10.1016/S0963-8695(98)00024-3 DOI: http://dx.doi.org/10.1016/S0963-8695(98)00024-3 | by applicant | SCHILLING ET AL.: "X-ray computed microtomography of internal damage in fiber reinforced polymer matrix composites", COMPOSITES SCIENCE AND TECHNOLOGY, vol. 65, 2005, pages 2071 - 2078, XP005080932, DOI: doi:10.1016/j.compscitech.2005.05.014 DOI: http://dx.doi.org/10.1016/j.compscitech.2005.05.014 | VAN BAEL ET AL.: "Micro-CT based improvement of geometrical and mechanical controllability of selective laser melted Ti5Al4V porous structures", MATERIALS SCIENCE AND ENGINEERING, 2011, pages 7423 - 7431, XP028246421, DOI: doi:10.1016/j.msea.2011.06.045 DOI: http://dx.doi.org/10.1016/j.msea.2011.06.045 |