EP3208934 - METHOD FOR DRIVING AN AC MOTOR BY TWO-PHASE ELECTRIC POWER [Right-click to bookmark this link] | |||
Former [2017/34] | METHOD FOR DRIVING AN AC MOTOR BY TWO-PHASE ELECTRIC POWER AND POWER GENERATION METHOD | ||
[2021/01] | Status | No opposition filed within time limit Status updated on 08.04.2022 Database last updated on 03.01.2025 | |
Former | The patent has been granted Status updated on 30.04.2021 | ||
Former | Grant of patent is intended Status updated on 13.12.2020 | ||
Former | Request for examination was made Status updated on 16.02.2018 | ||
Former | The application has been published Status updated on 21.07.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Dien, Ghing-Hsin 10F, No. 148. Sec 2, Fu-Hsing S. Rd. 106 Taipei / TW | [2017/34] | Inventor(s) | 01 /
see applicant ... | [2017/34] | Representative(s) | Stöckeler, Ferdinand, et al Schoppe, Zimmermann, Stöckeler Zinkler, Schenk & Partner mbB Patentanwälte Radlkoferstrasse 2 81373 München / DE | [2017/34] | Application number, filing date | 17156473.5 | 16.02.2017 | [2017/34] | Priority number, date | TW20160104653 | 17.02.2016 Original published format: TW 105104653 | [2017/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3208934 | Date: | 23.08.2017 | Language: | EN | [2017/34] | Type: | B1 Patent specification | No.: | EP3208934 | Date: | 02.06.2021 | Language: | EN | [2021/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.07.2017 | Classification | IPC: | H02P6/10, H02M7/5387 | [2017/34] | CPC: |
H02M7/5387 (EP,US);
H02P23/00 (CN);
H02P27/00 (CN,US);
H02P6/10 (EP,US);
H02P9/14 (CN)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/12] |
Former [2017/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR ANSTEUERUNG EINES WECHSELSTROMMOTORS DURCH ZWEIPHASENSTROM | [2021/01] | English: | METHOD FOR DRIVING AN AC MOTOR BY TWO-PHASE ELECTRIC POWER | [2021/01] | French: | PROCÉDÉ DE COMMANDE D'UN MOTEUR À COURANT ALTERNATIF PAR UNE ALIMENTATION ÉLECTRIQUE BIPHASÉE | [2021/01] |
Former [2017/34] | VERFAHREN ZUR ANSTEUERUNG EINES WECHSELSTROMMOTORS DURCH ZWEIPHASENSTROM UND STROMERZEUGUNGSVERFAHREN | ||
Former [2017/34] | METHOD FOR DRIVING AN AC MOTOR BY TWO-PHASE ELECTRIC POWER AND POWER GENERATION METHOD | ||
Former [2017/34] | PROCÉDÉ DE COMMANDE D'UN MOTEUR À COURANT ALTERNATIF PAR UNE ALIMENTATION ÉLECTRIQUE BIPHASÉE ET PROCÉDÉ DE PRODUCTION D'ÉNERGIE | Examination procedure | 16.02.2017 | Date on which the examining division has become responsible | 06.02.2018 | Amendment by applicant (claims and/or description) | 06.02.2018 | Examination requested [2018/12] | 14.12.2020 | Communication of intention to grant the patent | 22.04.2021 | Fee for grant paid | 22.04.2021 | Fee for publishing/printing paid | 22.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 03.03.2022 | No opposition filed within time limit [2022/19] | Fees paid | Renewal fee | 11.02.2019 | Renewal fee patent year 03 | 10.02.2020 | Renewal fee patent year 04 | 09.02.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.02.2017 | AL | 02.06.2021 | AT | 02.06.2021 | CY | 02.06.2021 | CZ | 02.06.2021 | DK | 02.06.2021 | EE | 02.06.2021 | ES | 02.06.2021 | FI | 02.06.2021 | HR | 02.06.2021 | IT | 02.06.2021 | LT | 02.06.2021 | LV | 02.06.2021 | MC | 02.06.2021 | MK | 02.06.2021 | MT | 02.06.2021 | NL | 02.06.2021 | PL | 02.06.2021 | RO | 02.06.2021 | RS | 02.06.2021 | SE | 02.06.2021 | SI | 02.06.2021 | SK | 02.06.2021 | SM | 02.06.2021 | BG | 02.09.2021 | NO | 02.09.2021 | GR | 03.09.2021 | IS | 02.10.2021 | PT | 04.10.2021 | IE | 16.02.2022 | LU | 16.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | LI | 28.02.2022 | [2024/42] |
Former [2024/22] | HU | 16.02.2017 | |
AL | 02.06.2021 | ||
AT | 02.06.2021 | ||
CY | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
MK | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 16.02.2022 | ||
LU | 16.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/20] | HU | 16.02.2017 | |
AL | 02.06.2021 | ||
AT | 02.06.2021 | ||
CY | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 16.02.2022 | ||
LU | 16.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/18] | HU | 16.02.2017 | |
AL | 02.06.2021 | ||
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 16.02.2022 | ||
LU | 16.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/10] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 16.02.2022 | ||
LU | 16.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/09] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 16.02.2022 | ||
LU | 16.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2022/47] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
LU | 16.02.2022 | ||
Former [2022/44] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/36] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
IT | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/29] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/26] | AL | 02.06.2021 | |
AT | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/21] | AT | 02.06.2021 | |
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/10] | AT | 02.06.2021 | |
CZ | 02.06.2021 | ||
EE | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/09] | AT | 02.06.2021 | |
CZ | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
PT | 04.10.2021 | ||
Former [2022/08] | AT | 02.06.2021 | |
CZ | 02.06.2021 | ||
ES | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2022/07] | AT | 02.06.2021 | |
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/52] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
PL | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/51] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/49] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/47] | FI | 02.06.2021 | |
LT | 02.06.2021 | ||
BG | 02.09.2021 | ||
Former [2021/46] | FI | 02.06.2021 | |
LT | 02.06.2021 | Documents cited: | Search | [XAI]US5420782 (LUCE JOHN W [US], et al) [X] 1,5 * column 3, line 16 - column 6, line 49; figures 3-6 * [A] 2-4,7-10 [I] 6; | [T]JPH1042598 (ALPS ELECTRIC CO LTD) [T] * abstract *; | [T]CN104579043 (YAN CHAOYANG, et al) [T] * abstract * |