blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3219933

EP3219933 - SEAL ASSEMBLY, GAS TURBINE HAVING THE SAME, AND METHOD OF ASSEMBLING A SEAL ASSEMBLY [Right-click to bookmark this link]
Former [2017/38]BOAS SEGMENTED HEAT SHIELD
[2020/46]
StatusNo opposition filed within time limit
Status updated on  04.03.2022
Database last updated on 20.09.2024
FormerThe patent has been granted
Status updated on  26.03.2021
FormerGrant of patent is intended
Status updated on  15.10.2020
FormerRequest for examination was made
Status updated on  22.03.2018
FormerThe application has been published
Status updated on  18.08.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Raytheon Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2021/12]
Former [2017/38]For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
Inventor(s)01 / McCAFFREY, Michael G.
150 Carriage Way
Windsor, CT 06095 / US
02 / HAGEN, Benjamin F.
1382 Stable Bend Lange
Winston-Salem, CT 27106 / US
03 / GRIFFIN, David Richard
28 Robin Circle
Tolland, CT 06084 / US
 [2017/38]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2021/17]
Former [2017/38]Chiva, Andrew Peter
Dehns St Bride's House 10 Salisbury Square London
EC4Y 8JD / GB
Application number, filing date17160063.809.03.2017
[2017/38]
Priority number, dateUS20161507143916.03.2016         Original published format: US201615071439
[2017/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3219933
Date:20.09.2017
Language:EN
[2017/38]
Type: B1 Patent specification 
No.:EP3219933
Date:28.04.2021
Language:EN
[2021/17]
Search report(s)(Supplementary) European search report - dispatched on:EP17.08.2017
ClassificationIPC:F01D11/08, F02C7/28
[2017/38]
CPC:
F01D11/08 (EP,US); F01D11/12 (US); F01D25/08 (US);
F01D5/02 (US); F01D9/041 (US); F02C7/28 (EP,US);
F05D2220/32 (US); F05D2230/60 (US); F05D2240/11 (EP,US);
F05D2260/231 (US); F05D2260/30 (EP,US); F05D2260/38 (EP,US);
F05D2260/52 (US); Y02T50/60 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/16]
Former [2017/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:DICHTUNGSANORDNUNG, GASTURBINE DAMIT SOWIE VERFAHREN ZUR MONTAGE EINER DICHTUNGSANORDNUNG[2020/46]
English:SEAL ASSEMBLY, GAS TURBINE HAVING THE SAME, AND METHOD OF ASSEMBLING A SEAL ASSEMBLY[2020/46]
French:ENSEMBLE DE JOINT D'ÉTANCHÉITÉ, TURBINE À GAZ AVEC UN TEL ENSEMBLE DE JOINT D'ÉTANCHÉITÉ, ET PROCÉDÉ D'ASSEMBLAGE D'UN ENSEMBLE DE JOINT D'ÉTANCHÉITÉ[2020/46]
Former [2017/38]ÄUSSERE SCHAUFELLUFTDICHTUNG MIT SEGMENTIERTEM HITZESCHILD
Former [2017/38]BOAS SEGMENTED HEAT SHIELD
Former [2017/38]JOINT D'AUBE EXTERNE ÉTANCHE AVEC BOUCLIER THERMIQUE SEGMENTÉ
Examination procedure09.03.2017Date on which the examining division has become responsible
05.03.2018Amendment by applicant (claims and/or description)
08.03.2018Examination requested  [2018/16]
16.10.2020Communication of intention to grant the patent
08.02.2021Fee for grant paid
08.02.2021Fee for publishing/printing paid
08.02.2021Receipt of the translation of the claim(s)
Opposition(s)31.01.2022No opposition filed within time limit [2022/14]
Fees paidRenewal fee
22.03.2019Renewal fee patent year 03
20.03.2020Renewal fee patent year 04
23.03.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.03.2017
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
MT28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
TR28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
[2024/42]
Former [2024/29]HU09.03.2017
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
TR28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2024/22]HU09.03.2017
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2024/20]HU09.03.2017
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2024/18]HU09.03.2017
AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/47]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/36]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/29]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/26]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/23]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/10]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
IS22.12.2021
Former [2022/09]AT28.04.2021
CZ28.04.2021
DK28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/08]AT28.04.2021
CZ28.04.2021
DK28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/07]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/52]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/51]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/50]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
Former [2021/49]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
Former [2021/47]AT28.04.2021
FI28.04.2021
LT28.04.2021
NL28.04.2021
BG28.07.2021
Former [2021/46]AT28.04.2021
FI28.04.2021
LT28.04.2021
Documents cited:Search[XAI]FR2540938  (SNECMA [FR]) [X] 1-5,7,9,12-15 * pages 2-12; figure 1 * [A] 8 [I] 6;
 [A]US5423659  (THOMPSON RALPH J [US]) [A] 1,14 * figures 3,6 *;
 [A]EP0770761  (UNITED TECHNOLOGIES CORP [US]) [A] 1,14* figure 2 *;
 [XI]EP1362983  (GEN ELECTRIC [US]) [X] 1-4,9,11,12 * paragraphs [0009] - [0016]; figures 1-2 * [I] 10;
 [A]GB2480766  (GEN ELECTRIC [US]) [A] 1,14 * figure 5 *
ExaminationWO03054358
 WO2015088656
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.