EP3330719 - SYSTEM AND METHOD FOR MEASURING THE SPEED OF A GUIDED VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 31.05.2019 | ||
Former | Grant of patent is intended Status updated on 20.03.2019 | ||
Former | Request for examination was made Status updated on 09.11.2018 | ||
Former | The application has been published Status updated on 04.05.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Siemens Rail Automation S.A.U. Ronda de Europa 5 28760 Tres Cantos (Madrid) / ES | [2018/23] | Inventor(s) | 01 /
GARRIDO BARROSO, David CL Jose Chacon 4, 2-C 28805 Alcala de Henares / ES | [2018/23] | Representative(s) | Maier, Daniel Oliver Siemens AG Postfach 22 16 34 80506 München / DE | [N/P] |
Former [2018/23] | Maier, Daniel Oliver Siemens AG Postfach 22 16 34 80506 München / DE | Application number, filing date | 17161085.0 | 15.03.2017 | [2018/23] | Priority number, date | EP20160380035 | 30.11.2016 Original published format: EP 16380035 | [2018/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3330719 | Date: | 06.06.2018 | Language: | EN | [2018/23] | Type: | B1 Patent specification | No.: | EP3330719 | Date: | 03.07.2019 | Language: | EN | [2019/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.09.2017 | Classification | IPC: | G01P3/49, G01P3/50 | [2018/23] | CPC: |
G01P3/49 (EP);
G01P3/505 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/50] |
Former [2018/23] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM UND VERFAHREN ZUR MESSUNG DER GESCHWINDIGKEIT EINES GEFÜHRTEN FAHRZEUGS | [2018/23] | English: | SYSTEM AND METHOD FOR MEASURING THE SPEED OF A GUIDED VEHICLE | [2018/23] | French: | SYSTÈME ET PROCÉDÉ POUR MESURER LA VITESSE D'UN VÉHICULE GUIDÉ | [2018/23] | Examination procedure | 05.11.2018 | Examination requested [2018/50] | 05.11.2018 | Date on which the examining division has become responsible | 21.03.2019 | Communication of intention to grant the patent | 22.05.2019 | Receipt of the translation of the claim(s) | 23.05.2019 | Fee for grant paid | 23.05.2019 | Fee for publishing/printing paid | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 19.03.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.03.2017 | AL | 03.07.2019 | AT | 03.07.2019 | CY | 03.07.2019 | CZ | 03.07.2019 | DK | 03.07.2019 | EE | 03.07.2019 | FI | 03.07.2019 | HR | 03.07.2019 | LT | 03.07.2019 | LV | 03.07.2019 | MC | 03.07.2019 | MK | 03.07.2019 | MT | 03.07.2019 | NL | 03.07.2019 | PL | 03.07.2019 | RO | 03.07.2019 | RS | 03.07.2019 | SI | 03.07.2019 | SK | 03.07.2019 | SM | 03.07.2019 | BG | 03.10.2019 | GR | 04.10.2019 | IS | 03.11.2019 | IE | 15.03.2020 | LU | 15.03.2020 | BE | 31.03.2020 | CH | 31.03.2020 | LI | 31.03.2020 | [2022/33] |
Former [2022/28] | HU | 15.03.2017 | |
AL | 03.07.2019 | ||
AT | 03.07.2019 | ||
CY | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
MT | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
IE | 15.03.2020 | ||
LU | 15.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/13] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
IE | 15.03.2020 | ||
LU | 15.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/08] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
IE | 15.03.2020 | ||
LU | 15.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/04] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
LU | 15.03.2020 | ||
Former [2020/50] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/37] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/36] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/27] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SK | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/22] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/15] | AL | 03.07.2019 | |
AT | 03.07.2019 | ||
CZ | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/12] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/11] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
Former [2020/10] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
FI | 03.07.2019 | ||
LT | 03.07.2019 | ||
NL | 03.07.2019 | ||
BG | 03.10.2019 | ||
Former [2020/09] | CZ | 03.07.2019 | |
FI | 03.07.2019 | ||
LT | 03.07.2019 | ||
NL | 03.07.2019 | ||
Former [2020/08] | LT | 03.07.2019 | |
NL | 03.07.2019 | ||
Former [2020/07] | NL | 03.07.2019 | Documents cited: | Search | [A]US2481196 (JACKSON BULLIET LEANDER) [A] 1-15 * column 1, line 6 - column 1, line 16; figures 4,7 ** column 2, line 32 - column 3, line 66 *; | [A]DE1147787 (CHRISTOF ROHRBACH DR ING) [A] 1-15 * column 1, line 4 - column 2, line 42; figures 1,2 *; | [A]DE1214910 (SIEMENS AG) [A] 1-15 * column 1, line 9 - column 1, line 27 * * column 2, line 34 - column 2, line 44; figure 1 *; | [A]JPH08146024 (TOSHIBA CORP) [A] 1-15 * abstract * * paragraphs [0004] , [0005] , [0008] - [0013] - [0018] , [0020] , [0021] * |