blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3330719

EP3330719 - SYSTEM AND METHOD FOR MEASURING THE SPEED OF A GUIDED VEHICLE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 30.07.2024
FormerThe patent has been granted
Status updated on  31.05.2019
FormerGrant of patent is intended
Status updated on  20.03.2019
FormerRequest for examination was made
Status updated on  09.11.2018
FormerThe application has been published
Status updated on  04.05.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Siemens Rail Automation S.A.U.
Ronda de Europa 5
28760 Tres Cantos (Madrid) / ES
[2018/23]
Inventor(s)01 / GARRIDO BARROSO, David
CL Jose Chacon 4, 2-C
28805 Alcala de Henares / ES
 [2018/23]
Representative(s)Maier, Daniel Oliver
Siemens AG
Postfach 22 16 34
80506 München / DE
[N/P]
Former [2018/23]Maier, Daniel Oliver
Siemens AG
Postfach 22 16 34
80506 München / DE
Application number, filing date17161085.015.03.2017
[2018/23]
Priority number, dateEP2016038003530.11.2016         Original published format: EP 16380035
[2018/23]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3330719
Date:06.06.2018
Language:EN
[2018/23]
Type: B1 Patent specification 
No.:EP3330719
Date:03.07.2019
Language:EN
[2019/27]
Search report(s)(Supplementary) European search report - dispatched on:EP21.09.2017
ClassificationIPC:G01P3/49, G01P3/50
[2018/23]
CPC:
G01P3/49 (EP); G01P3/505 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/50]
Former [2018/23]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM UND VERFAHREN ZUR MESSUNG DER GESCHWINDIGKEIT EINES GEFÜHRTEN FAHRZEUGS[2018/23]
English:SYSTEM AND METHOD FOR MEASURING THE SPEED OF A GUIDED VEHICLE[2018/23]
French:SYSTÈME ET PROCÉDÉ POUR MESURER LA VITESSE D'UN VÉHICULE GUIDÉ[2018/23]
Examination procedure05.11.2018Examination requested  [2018/50]
05.11.2018Date on which the examining division has become responsible
21.03.2019Communication of intention to grant the patent
22.05.2019Receipt of the translation of the claim(s)
23.05.2019Fee for grant paid
23.05.2019Fee for publishing/printing paid
Opposition(s)03.06.2020No opposition filed within time limit [2020/33]
Fees paidRenewal fee
19.03.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.03.2017
AL03.07.2019
AT03.07.2019
CY03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
MK03.07.2019
MT03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
IE15.03.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
[2022/33]
Former [2022/28]HU15.03.2017
AL03.07.2019
AT03.07.2019
CY03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
MT03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
IE15.03.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/13]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
IE15.03.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/08]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
IE15.03.2020
LU15.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/04]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
LU15.03.2020
Former [2020/50]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
Former [2020/37]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
Former [2020/36]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
Former [2020/27]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SK03.07.2019
SM03.07.2019
BG03.10.2019
GR04.10.2019
IS24.02.2020
Former [2020/25]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SK03.07.2019
BG03.10.2019
GR04.10.2019
IS24.02.2020
Former [2020/24]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
BG03.10.2019
GR04.10.2019
IS24.02.2020
Former [2020/23]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
Former [2020/22]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
Former [2020/15]AL03.07.2019
AT03.07.2019
CZ03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
Former [2020/12]AT03.07.2019
CZ03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
BG03.10.2019
GR04.10.2019
IS03.11.2019
Former [2020/11]AT03.07.2019
CZ03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
BG03.10.2019
GR04.10.2019
Former [2020/10]AT03.07.2019
CZ03.07.2019
FI03.07.2019
LT03.07.2019
NL03.07.2019
BG03.10.2019
Former [2020/09]CZ03.07.2019
FI03.07.2019
LT03.07.2019
NL03.07.2019
Former [2020/08]LT03.07.2019
NL03.07.2019
Former [2020/07]NL03.07.2019
Documents cited:Search[A]US2481196  (JACKSON BULLIET LEANDER) [A] 1-15 * column 1, line 6 - column 1, line 16; figures 4,7 ** column 2, line 32 - column 3, line 66 *;
 [A]DE1147787  (CHRISTOF ROHRBACH DR ING) [A] 1-15 * column 1, line 4 - column 2, line 42; figures 1,2 *;
 [A]DE1214910  (SIEMENS AG) [A] 1-15 * column 1, line 9 - column 1, line 27 * * column 2, line 34 - column 2, line 44; figure 1 *;
 [A]JPH08146024  (TOSHIBA CORP) [A] 1-15 * abstract * * paragraphs [0004] , [0005] , [0008] - [0013] - [0018] , [0020] , [0021] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.