blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3220096

EP3220096 - ELECTRONIC SYSTEM WITH FLEX CIRCUIT CONNECTOR CONFIGURATION [Right-click to bookmark this link]
Former [2017/38]FLEX CIRCUIT CONNECTOR CONFIGURATION
[2020/45]
StatusNo opposition filed within time limit
Status updated on  06.05.2022
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  28.05.2021
FormerGrant of patent is intended
Status updated on  26.01.2021
FormerExamination is in progress
Status updated on  23.10.2020
FormerRequest for examination was made
Status updated on  23.03.2018
FormerThe application has been published
Status updated on  18.08.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Rosemount Aerospace Inc.
14300 Judicial Road
Burnsville, MN 55306-4898 / US
[2021/26]
Former [2017/38]For all designated states
Rosemount Aerospace Inc.
14300 Judicial Road
Burnsville MN 55306-4898 / US
Inventor(s)01 / WHATCOTT, Neal R.
1229 Vernon Dr.
Carver, MN 55315 / US
 [2017/38]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2021/26]
Former [2017/38]Hughes, Andrea Michelle
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17161125.415.03.2017
[2017/38]
Priority number, dateUS20161507174516.03.2016         Original published format: US201615071745
[2017/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3220096
Date:20.09.2017
Language:EN
[2017/38]
Type: B1 Patent specification 
No.:EP3220096
Date:30.06.2021
Language:EN
[2021/26]
Search report(s)(Supplementary) European search report - dispatched on:EP31.07.2017
ClassificationIPC:F42B35/00, F42C19/06, H05K1/02, H05K1/14, H05K3/36
[2017/38]
CPC:
F42B35/00 (EP,US); H01R12/62 (US); F42C19/06 (EP,US);
H05K1/028 (EP,US); H05K1/14 (US); H05K1/147 (EP,US);
H05K1/148 (EP,US); H05K3/368 (EP,US); F42B15/10 (EP,US);
H05K2201/09027 (EP,US); H05K2201/09063 (EP,US); H05K7/1434 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/17]
Former [2017/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTRONIKANORDNUNG MIT VERBINDERKONFIGURATION IN FORM EINER FLEXIBLE SCHALTUNG[2020/45]
English:ELECTRONIC SYSTEM WITH FLEX CIRCUIT CONNECTOR CONFIGURATION[2020/45]
French:ASSEMBLAGE ÉLECRONIQUE AVEC CONFIGURATION DE CONNECTEUR DE CIRCUIT FLEXIBLE[2020/45]
Former [2017/38]VERBINDERKONFIGURATION FÜR FLEXIBLE SCHALTUNG
Former [2017/38]FLEX CIRCUIT CONNECTOR CONFIGURATION
Former [2017/38]CONFIGURATION DE CONNECTEUR DE CIRCUIT FLEXIBLE
Examination procedure15.03.2017Date on which the examining division has become responsible
19.03.2018Amendment by applicant (claims and/or description)
19.03.2018Examination requested  [2018/17]
27.10.2020Despatch of a communication from the examining division (Time limit: M01)
07.12.2020Reply to a communication from the examining division
27.01.2021Communication of intention to grant the patent
20.05.2021Fee for grant paid
20.05.2021Fee for publishing/printing paid
20.05.2021Receipt of the translation of the claim(s)
Opposition(s)31.03.2022No opposition filed within time limit [2022/23]
Fees paidRenewal fee
22.03.2019Renewal fee patent year 03
20.03.2020Renewal fee patent year 04
23.03.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.03.2017
AL30.06.2021
AT30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
MK30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE15.03.2022
LU15.03.2022
[2024/22]
Former [2024/20]HU15.03.2017
AL30.06.2021
AT30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE15.03.2022
LU15.03.2022
Former [2024/18]HU15.03.2017
AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE15.03.2022
LU15.03.2022
Former [2023/19]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE15.03.2022
LU15.03.2022
Former [2023/09]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE15.03.2022
LU15.03.2022
Former [2023/08]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE15.03.2022
LU15.03.2022
Former [2022/47]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/36]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
IT30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/29]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/26]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/21]AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/10]AT30.06.2021
CZ30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/09]AT30.06.2021
CZ30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
PT02.11.2021
Former [2022/08]AT30.06.2021
CZ30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RS30.06.2021
SE30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2022/07]AT30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RS30.06.2021
SE30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/51]FI30.06.2021
HR30.06.2021
LV30.06.2021
RS30.06.2021
SE30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/49]FI30.06.2021
HR30.06.2021
LV30.06.2021
SE30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/47]FI30.06.2021
BG30.09.2021
Former [2021/46]FI30.06.2021
Documents cited:Search[I]US6287021  (KATOH MINORU [JP], et al) [I] 1-8 * abstract * * column 5, line 59 - column 6, line 7 *;
 [XI]US2004154824  (HESSE HANS [DE]) [X] 1,2,8 * paragraphs [0022] - [0024]; figures 1,2 * [I] 2-7;
 [A]US2006176677  (GLOVATSKY ANDREW Z [US], et al) [A] 1-12* abstract *;
 [I]US2012242364  (OHMAYER GERD [DE]) [I] 1-9 * abstract * * paragraphs [0054] , [0068] , [0069] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.