EP3379107 - COMPOUND PLANET GEAR ARRANGEMENT AND GEAR WHEEL ARRANGEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 23.10.2020 | ||
Former | Grant of patent is intended Status updated on 16.06.2020 | ||
Former | Request for examination was made Status updated on 29.03.2019 | ||
Former | The application has been published Status updated on 24.08.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Cascade Drives AB KIC InnoEnergy AB Valhallavägen 79 114 28 Stockholm / SE | [2019/14] |
Former [2018/39] | For all designated states CORDRIVE AB Vallhallavägen 79 114 28 Stockholm / SE | Inventor(s) | 01 /
LUNDBÄCK, Stig Säteribacken 8 Östra Tynningö 185 92 Vaxholm / SE | [2018/39] | Representative(s) | Kransell & Wennborg KB P.O. Box 27834 115 93 Stockholm / SE | [2018/39] | Application number, filing date | 17162687.2 | 23.03.2017 | [2018/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3379107 | Date: | 26.09.2018 | Language: | EN | [2018/39] | Type: | B1 Patent specification | No.: | EP3379107 | Date: | 25.11.2020 | Language: | EN | [2020/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.09.2017 | Classification | IPC: | F16H57/08, F16H3/66 | [2018/39] | CPC: |
F16H57/082 (EP);
F16H3/663 (EP);
F16H1/2836 (EP);
F16H1/36 (EP);
F16H2057/0235 (EP);
F16H2057/085 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/18] |
Former [2018/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERBUNDPLANETENGETRIEBEANORDNUNG UND ZAHNRADANORDNUNG | [2018/39] | English: | COMPOUND PLANET GEAR ARRANGEMENT AND GEAR WHEEL ARRANGEMENT | [2018/39] | French: | DISPOSITIF D'ENGRENAGE PLANÉTAIRE COMPOSÉ ET AGENCEMENT DE ROUE D'ENGRENAGE | [2018/39] | Examination procedure | 25.03.2019 | Amendment by applicant (claims and/or description) | 25.03.2019 | Examination requested [2019/18] | 25.03.2019 | Date on which the examining division has become responsible | 17.06.2020 | Communication of intention to grant the patent | 16.10.2020 | Fee for grant paid | 16.10.2020 | Fee for publishing/printing paid | 16.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 28.03.2019 | Renewal fee patent year 03 | 25.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.03.2017 | AL | 25.11.2020 | AT | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | ES | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | BG | 25.02.2021 | GR | 26.02.2021 | IE | 23.03.2021 | LU | 23.03.2021 | IS | 25.03.2021 | PT | 25.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | LI | 31.03.2021 | [2024/22] |
Former [2023/33] | HU | 23.03.2017 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/30] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/34] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/23] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/10] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
PT | 25.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/08] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 23.03.2021 | ||
LU | 23.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/07] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 23.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/50] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/46] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/45] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/37] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/36] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/35] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/33] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/32] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/28] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/25] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/24] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
RS | 25.11.2020 | ||
BG | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/23] | FI | 25.11.2020 | |
LV | 25.11.2020 | ||
RS | 25.11.2020 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/22] | FI | 25.11.2020 | |
RS | 25.11.2020 | ||
PT | 25.03.2021 | ||
Former [2021/21] | FI | 25.11.2020 | |
PT | 25.03.2021 | ||
Former [2021/20] | FI | 25.11.2020 | Documents cited: | Search | [A]BE495862 (MÉCANIQUE NAVALE GENDRON) [A] 1-13 * page 2, lines 51-58; figures 1,2 *; | [A]EP1538332 (REPOWER SYSTEMS AG [DE]) [A] 1-13 * abstract *; | [X]CN101539187 (XIAOJIE WU) [X] 1-13 * figures 1-3 *; | [A]US2013203553 (FONG ZHANG-HUA [TW], et al) [A] 1-13* abstract * | by applicant | US15052 | US113210 | US3303713 | US4674351 | US4831897 | US6459165 | US6935986 | WO2007119074 | DE102007053509 | US2010113210 | US8734289 | US8907517 | US9073538 | US9482318 | - SWEDISH ELFORSK REPORT, (2011), vol. 10, page 50 | - CIRP ANNALS - MANUFACTURING TECHNOLOGY, (2012), vol. 61, pages 611 - 634 |