blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3379107

EP3379107 - COMPOUND PLANET GEAR ARRANGEMENT AND GEAR WHEEL ARRANGEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.10.2021
Database last updated on 27.07.2024
FormerThe patent has been granted
Status updated on  23.10.2020
FormerGrant of patent is intended
Status updated on  16.06.2020
FormerRequest for examination was made
Status updated on  29.03.2019
FormerThe application has been published
Status updated on  24.08.2018
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Cascade Drives AB
KIC InnoEnergy AB
Valhallavägen 79
114 28 Stockholm / SE
[2019/14]
Former [2018/39]For all designated states
CORDRIVE AB
Vallhallavägen 79
114 28 Stockholm / SE
Inventor(s)01 / LUNDBÄCK, Stig
Säteribacken 8
Östra Tynningö
185 92 Vaxholm / SE
 [2018/39]
Representative(s)Kransell & Wennborg KB
P.O. Box 27834
115 93 Stockholm / SE
[2018/39]
Application number, filing date17162687.223.03.2017
[2018/39]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3379107
Date:26.09.2018
Language:EN
[2018/39]
Type: B1 Patent specification 
No.:EP3379107
Date:25.11.2020
Language:EN
[2020/48]
Search report(s)(Supplementary) European search report - dispatched on:EP22.09.2017
ClassificationIPC:F16H57/08, F16H3/66
[2018/39]
CPC:
F16H57/082 (EP); F16H3/663 (EP); F16H1/2836 (EP);
F16H1/36 (EP); F16H2057/0235 (EP); F16H2057/085 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/18]
Former [2018/39]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERBUNDPLANETENGETRIEBEANORDNUNG UND ZAHNRADANORDNUNG[2018/39]
English:COMPOUND PLANET GEAR ARRANGEMENT AND GEAR WHEEL ARRANGEMENT[2018/39]
French:DISPOSITIF D'ENGRENAGE PLANÉTAIRE COMPOSÉ ET AGENCEMENT DE ROUE D'ENGRENAGE[2018/39]
Examination procedure25.03.2019Amendment by applicant (claims and/or description)
25.03.2019Examination requested  [2019/18]
25.03.2019Date on which the examining division has become responsible
17.06.2020Communication of intention to grant the patent
16.10.2020Fee for grant paid
16.10.2020Fee for publishing/printing paid
16.10.2020Receipt of the translation of the claim(s)
Opposition(s)26.08.2021No opposition filed within time limit [2021/44]
Fees paidRenewal fee
28.03.2019Renewal fee patent year 03
25.03.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.03.2017
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
MK25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
[2024/22]
Former [2023/33]HU23.03.2017
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/30]AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/34]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/23]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/10]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
PT25.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/08]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IE23.03.2021
LU23.03.2021
IS25.03.2021
PT25.03.2021
Former [2022/07]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IE23.03.2021
IS25.03.2021
PT25.03.2021
Former [2021/50]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/46]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/45]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/37]AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/36]AT25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/35]AT25.11.2020
CZ25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/33]AT25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/32]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SM25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/28]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/25]AT25.11.2020
FI25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
BG25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/24]AT25.11.2020
FI25.11.2020
LV25.11.2020
RS25.11.2020
BG25.02.2021
GR26.02.2021
PT25.03.2021
Former [2021/23]FI25.11.2020
LV25.11.2020
RS25.11.2020
GR26.02.2021
PT25.03.2021
Former [2021/22]FI25.11.2020
RS25.11.2020
PT25.03.2021
Former [2021/21]FI25.11.2020
PT25.03.2021
Former [2021/20]FI25.11.2020
Documents cited:Search[A]BE495862  (MÉCANIQUE NAVALE GENDRON) [A] 1-13 * page 2, lines 51-58; figures 1,2 *;
 [A]EP1538332  (REPOWER SYSTEMS AG [DE]) [A] 1-13 * abstract *;
 [X]CN101539187  (XIAOJIE WU) [X] 1-13 * figures 1-3 *;
 [A]US2013203553  (FONG ZHANG-HUA [TW], et al) [A] 1-13* abstract *
by applicantUS15052
 US113210
 US3303713
 US4674351
 US4831897
 US6459165
 US6935986
 WO2007119074
 DE102007053509
 US2010113210
 US8734289
 US8907517
 US9073538
 US9482318
    - SWEDISH ELFORSK REPORT, (2011), vol. 10, page 50
    - CIRP ANNALS - MANUFACTURING TECHNOLOGY, (2012), vol. 61, pages 611 - 634
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.