blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3225676

EP3225676 - HEAT STORAGE MEMBER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.01.2021
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  31.01.2020
FormerGrant of patent is intended
Status updated on  06.10.2019
FormerExamination is in progress
Status updated on  20.07.2018
FormerRequest for examination was made
Status updated on  06.04.2018
FormerThe application has been published
Status updated on  01.09.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
NGK Insulators, Ltd.
2-56, Suda-cho Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
For all designated states
NGK Adrec Co., Ltd.
3040, Misano, Mitake-cho Kani-gun
Gifu 505-0112 / JP
[2017/40]
Inventor(s)01 / MIWA, Shinichi
c/o NGK Insulators, Ltd., Legal Affairs &
Intellectual Property Dept
2-56 Suda-cho
Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
02 / KINOSHITA, Toshiharu
c/o NGK Adrec Co., Ltd.
3040, Mizano, Mitake-cho
Kani-gun Gifu-prefecture 505-0112 / JP
03 / HIMOTO, Iori
c/o NGK Adrec Co., Ltd.
3040, Mizano, Mitake-cho
Kani-gun Gifu-prefecture 505-0112 / JP
 [2020/10]
Former [2017/40]01 / MIWA, Shinichi
c/o NGK Insulators, Ltd., Legal Affairs &
Intellectual Property Dept
2-56 Suda-cho
Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
02 / KINOSHITA, Toshiharu
c/o NGK Insulators, Ltd., Legal Affairs &
Intellectual Property Dept
2-56 Suda-cho
Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
03 / HIMOTO, Iori
c/o NGK Insulators, Ltd., Legal Affairs &
Intellectual Property Dept
2-56 Suda-cho
Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
Representative(s)Mewburn Ellis LLP
Aurora Building
Counterslip
Bristol BS1 6BX / GB
[N/P]
Former [2020/10]Mewburn Ellis LLP
City Tower
40 Basinghall Street
London EC2V 5DE / GB
Former [2017/40]Naylor, Matthew John, et al
Mewburn Ellis LLP
City Tower
40 Basinghall Street
London EC2V 5DE / GB
Application number, filing date17163129.427.03.2017
[2017/40]
Priority number, dateJP2016007348631.03.2016         Original published format: JP 2016073486
[2017/40]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3225676
Date:04.10.2017
Language:EN
[2017/40]
Type: B1 Patent specification 
No.:EP3225676
Date:04.03.2020
Language:EN
[2020/10]
Search report(s)(Supplementary) European search report - dispatched on:EP01.08.2017
ClassificationIPC:C09K5/16, F28D20/00
[2017/40]
CPC:
F28D20/003 (EP,CN,US); C09K5/16 (EP,US); Y02E60/14 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/19]
Former [2017/40]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:WÄRMESPEICHERELEMENT[2017/40]
English:HEAT STORAGE MEMBER[2017/40]
French:ÉLÉMENT DE STOCKAGE DE CHALEUR[2017/40]
Examination procedure27.03.2017Date on which the examining division has become responsible
29.03.2018Amendment by applicant (claims and/or description)
29.03.2018Examination requested  [2018/19]
20.07.2018Despatch of a communication from the examining division (Time limit: M04)
08.11.2018Reply to a communication from the examining division
01.03.2019Despatch of a communication from the examining division (Time limit: M04)
29.04.2019Reply to a communication from the examining division
07.10.2019Communication of intention to grant the patent
22.01.2020Fee for grant paid
22.01.2020Fee for publishing/printing paid
22.01.2020Receipt of the translation of the claim(s)
Opposition(s)07.12.2020No opposition filed within time limit [2021/06]
Fees paidRenewal fee
18.03.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.03.2017
AL04.03.2020
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MK04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
IE27.03.2020
LU27.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
[2022/31]
Former [2022/30]HU27.03.2017
AL04.03.2020
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
IE27.03.2020
LU27.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2022/27]HU27.03.2017
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
IE27.03.2020
LU27.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/10]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
IE27.03.2020
LU27.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/07]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
IE27.03.2020
LU27.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/04]CZ04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
LU27.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/50]CZ04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/49]CZ04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/48]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/47]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/46]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/45]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/39]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/38]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
GR05.06.2020
Former [2020/37]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
Former [2020/35]FI04.03.2020
NO04.06.2020
Documents cited:Search[XI]US5338576  (HANZAWA SHIGERU [JP], et al) [X] 1,10-13,17,18 * column 1, line 6 - column 2, line 16 * * column 3, lines 8-64 * * column 5, line 36 - column 6, line 36; examples 14-18 * [I] 10-19;
 [AD]JP2011027311  (TOYOTA CENTRAL RES & DEV, et al) [AD] 1-19 * abstract ** paragraphs [0006] - [0011] - [0021] - [0022] - [0026] *;
 [XI]DE102014206035  (NGK ADREC CO [JP], et al) [X] 1,10-13,17,18 * paragraphs [0009] - [0017] - [0022] , [0023] , [0058] - [0059]; figure 4c * [I] 10-19;
 [XI]  - LIJUN GU ET AL, Template-Synthesized Porous Silicon Carbide as an Effective Host for Zeolite Catalysts, CHEMISTRY - A EUROPEAN JOURNAL,, PAGE(S) 13449 - 13455, (20091214), ISSN 0947-6539, XP002583187 [X] 1,10-14,17-19 * page 13449, column l * * page 13453; figures 6-8 * [I] 10-19

DOI:   http://dx.doi.org/10.1002/CHEM.200901982
 [XI]  - SUWAN MEDIS ET AL, "The Method of Solid State Impurity Diffusion and Doping In 4H-SiC", INTERNATIONAL JOURNAL OF FUNDAMENTAL PHYSICAL SCIENCES, (20131201), vol. 3, no. 4, pages 75 - 78, XP055392839 [X] 1-3,5,6 * Basic concepts; Experimental procedures; Diffusion annealing; Silicidation assisted impurity doping; Boron annealing;; figures 1-5 * [I] 1-9
by applicantJP2011027311
 JP2013112706
 JP2015040646
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.