EP3382127 - MAST COMPRISING AN ELECTRICALLY INSULATING CONNECTING ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.07.2021 Database last updated on 22.01.2025 | |
Former | The patent has been granted Status updated on 31.07.2020 | ||
Former | Grant of patent is intended Status updated on 01.04.2020 | ||
Former | Examination is in progress Status updated on 25.09.2019 | ||
Former | Request for examination was made Status updated on 12.04.2019 | ||
Former | The application has been published Status updated on 31.08.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states FUCHS Europoles Besitz GmbH & Co. KG Wegscheid 1a 92334 Berching / DE | [2020/25] |
Former [2018/40] | For all designated states Europoles GmbH & Co. KG Ingolstädter Strasse 51 92318 Neumarkt / DE | Inventor(s) | 01 /
Beckler, Lothar Wittelsbacher Weg 24 91555 Feuchtwangen / DE | [2018/40] | Representative(s) | Dr. Gassner & Partner mbB Wetterkreuz 3 91058 Erlangen / DE | [2020/36] |
Former [2018/40] | Dr. Gassner & Partner mbB Marie-Curie-Str. 1 91052 Erlangen / DE | Application number, filing date | 17164060.0 | 31.03.2017 | [2018/40] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3382127 | Date: | 03.10.2018 | Language: | DE | [2018/40] | Type: | B1 Patent specification | No.: | EP3382127 | Date: | 02.09.2020 | Language: | DE | [2020/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.10.2017 | Classification | IPC: | E04H12/02, E04H12/08 | [2018/40] | CPC: |
E04H12/08 (EP);
E04H12/02 (EP);
E04H12/085 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/20] |
Former [2018/40] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | MAST MIT EINEM ELEKTRISCH ISOLIERENDEN VERBINDUNGSELEMENT | [2018/40] | English: | MAST COMPRISING AN ELECTRICALLY INSULATING CONNECTING ELEMENT | [2018/40] | French: | MAT DOTE D'UN RACCORD ISOLE ELECTRIQUEMENT | [2020/17] |
Former [2018/40] | MÂT DOTÉ D'UN RACCORD ISOLÉ ÉLECTRIQUEMENT | Examination procedure | 03.04.2019 | Amendment by applicant (claims and/or description) | 03.04.2019 | Examination requested [2019/20] | 03.04.2019 | Date on which the examining division has become responsible | 30.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 13.12.2019 | Reply to a communication from the examining division | 02.04.2020 | Communication of intention to grant the patent | 23.07.2020 | Fee for grant paid | 23.07.2020 | Fee for publishing/printing paid | 23.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2021 | No opposition filed within time limit [2021/32] | Fees paid | Renewal fee | 18.03.2019 | Renewal fee patent year 03 | 13.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.03.2017 | AL | 02.09.2020 | CY | 02.09.2020 | CZ | 02.09.2020 | DK | 02.09.2020 | EE | 02.09.2020 | ES | 02.09.2020 | FI | 02.09.2020 | HR | 02.09.2020 | IT | 02.09.2020 | LT | 02.09.2020 | LV | 02.09.2020 | MC | 02.09.2020 | MK | 02.09.2020 | MT | 02.09.2020 | RO | 02.09.2020 | RS | 02.09.2020 | SI | 02.09.2020 | SK | 02.09.2020 | SM | 02.09.2020 | BG | 02.12.2020 | GR | 03.12.2020 | IS | 02.01.2021 | PT | 04.01.2021 | BE | 31.03.2021 | GB | 31.03.2021 | IE | 31.03.2021 | [2024/42] |
Former [2024/22] | HU | 31.03.2017 | |
AL | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MK | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
BE | 31.03.2021 | ||
GB | 31.03.2021 | ||
IE | 31.03.2021 | ||
Former [2023/33] | HU | 31.03.2017 | |
AL | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
BE | 31.03.2021 | ||
GB | 31.03.2021 | ||
IE | 31.03.2021 | ||
Former [2023/30] | AL | 02.09.2020 | |
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
BE | 31.03.2021 | ||
GB | 31.03.2021 | ||
IE | 31.03.2021 | ||
Former [2022/34] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
BE | 31.03.2021 | ||
GB | 31.03.2021 | ||
IE | 31.03.2021 | ||
Former [2022/09] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
GB | 31.03.2021 | ||
IE | 31.03.2021 | ||
Former [2022/07] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 31.03.2021 | ||
Former [2021/48] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/45] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/37] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/36] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/28] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/25] | AL | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/22] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/21] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
RS | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/10] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
RS | 02.09.2020 | ||
BG | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/08] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
BG | 02.12.2020 | ||
Former [2021/07] | FI | 02.09.2020 | |
LT | 02.09.2020 | Documents cited: | Search | [XI]JPS618206U (XXX) [X] 1,2,5,7,9,10 * the whole document * [I] 3,4,6,11; | [A]WO0036251 (ORLANDI MAURO [IT]) [A] 1-11* the whole document *; | [XI]CA2595201 (RESIN SYSTEMS INC [CA]) [X] 1-10 * figures 2,8 * * paragraphs [0065] , [0066] , [0088] - [0093] * [I] 11 | by applicant | EP1923529 |