EP3316295 - DEVICE COMPRISING A STACK OF ELECTRONIC CHIPS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.04.2022 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 14.05.2021 | ||
Former | Grant of patent is intended Status updated on 14.01.2021 | ||
Former | Examination is in progress Status updated on 09.10.2020 | ||
Former | Request for examination was made Status updated on 30.03.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states STMICROELECTRONICS (ROUSSET) SAS Z.I. de Peynier Rousset Avenue Coq 13790 Rousset / FR | [2018/18] | Inventor(s) | 01 /
CHAMPEIX, Clément 14 Allée des Bleuets 42160 SAINT-CYPRIEN / FR | 02 /
BORREL, Nicolas 9 Les Hauts de Figuerolles 13500 MARTIGUES / FR | [2018/18] | Representative(s) | Cabinet Beaumont 4, Place Robert Schuman B.P. 1529 38025 Grenoble Cedex 1 / FR | [2018/18] | Application number, filing date | 17164858.7 | 04.04.2017 | [2018/18] | Priority number, date | FR20160060568 | 31.10.2016 Original published format: FR 1660568 | [2018/18] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3316295 | Date: | 02.05.2018 | Language: | FR | [2018/18] | Type: | B1 Patent specification | No.: | EP3316295 | Date: | 16.06.2021 | Language: | FR | [2021/24] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.07.2017 | Classification | IPC: | H01L23/58, H01L25/065 | [2018/18] | CPC: |
H01L23/576 (EP,CN,US);
H01L23/481 (US);
H01L25/0657 (EP,US);
H01L2224/16145 (EP);
H01L2224/16225 (EP);
H01L2225/06513 (EP,US);
H01L2225/06527 (EP,US);
H01L2225/06541 (EP,US);
H01L2225/06565 (EP,US);
H01L2924/15192 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/18] | Title | German: | VORRICHTUNG MIT EINEM STAPEL ELEKTRONISCHER CHIPS | [2021/02] | English: | DEVICE COMPRISING A STACK OF ELECTRONIC CHIPS | [2018/18] | French: | DISPOSITIF COMPRENANT UN EMPILEMENT DE PUCES ÉLECTRONIQUES | [2018/18] |
Former [2018/18] | VORRICHTUNG, DIE EINEN STAPEL VON ELEKTRONISCHEN CHIPS ENTHÄLT | Examination procedure | 04.04.2017 | Examination requested [2018/18] | 04.04.2017 | Date on which the examining division has become responsible | 24.08.2018 | Amendment by applicant (claims and/or description) | 08.10.2020 | Despatch of a communication from the examining division (Time limit: M02) | 30.11.2020 | Reply to a communication from the examining division | 15.01.2021 | Communication of intention to grant the patent | 28.04.2021 | Fee for grant paid | 28.04.2021 | Fee for publishing/printing paid | 28.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 17.03.2022 | No opposition filed within time limit [2022/21] | Fees paid | Renewal fee | 18.04.2019 | Renewal fee patent year 03 | 21.04.2020 | Renewal fee patent year 04 | 21.04.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.04.2017 | AL | 16.06.2021 | AT | 16.06.2021 | CY | 16.06.2021 | CZ | 16.06.2021 | DK | 16.06.2021 | EE | 16.06.2021 | ES | 16.06.2021 | FI | 16.06.2021 | HR | 16.06.2021 | IT | 16.06.2021 | LT | 16.06.2021 | LV | 16.06.2021 | MC | 16.06.2021 | MK | 16.06.2021 | MT | 16.06.2021 | NL | 16.06.2021 | PL | 16.06.2021 | RO | 16.06.2021 | RS | 16.06.2021 | SE | 16.06.2021 | SI | 16.06.2021 | SK | 16.06.2021 | SM | 16.06.2021 | BG | 16.09.2021 | NO | 16.09.2021 | GR | 17.09.2021 | IS | 16.10.2021 | PT | 18.10.2021 | [2024/42] |
Former [2024/22] | HU | 04.04.2017 | |
AL | 16.06.2021 | ||
AT | 16.06.2021 | ||
CY | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
IT | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
MK | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2024/20] | HU | 04.04.2017 | |
AL | 16.06.2021 | ||
AT | 16.06.2021 | ||
CY | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
IT | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2024/18] | HU | 04.04.2017 | |
AL | 16.06.2021 | ||
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
IT | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2023/06] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
IT | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
MC | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/36] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
IT | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/29] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SI | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/26] | AL | 16.06.2021 | |
AT | 16.06.2021 | ||
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/21] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
DK | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/10] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
EE | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
PL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
IS | 16.10.2021 | ||
PT | 18.10.2021 | ||
Former [2022/09] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
RO | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SK | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
PT | 18.10.2021 | ||
Former [2022/08] | AT | 16.06.2021 | |
CZ | 16.06.2021 | ||
ES | 16.06.2021 | ||
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2022/07] | AT | 16.06.2021 | |
FI | 16.06.2021 | ||
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
NL | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
SM | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2021/51] | FI | 16.06.2021 | |
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
RS | 16.06.2021 | ||
SE | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2021/49] | FI | 16.06.2021 | |
HR | 16.06.2021 | ||
LT | 16.06.2021 | ||
LV | 16.06.2021 | ||
SE | 16.06.2021 | ||
BG | 16.09.2021 | ||
NO | 16.09.2021 | ||
GR | 17.09.2021 | ||
Former [2021/47] | FI | 16.06.2021 | |
LT | 16.06.2021 | ||
BG | 16.09.2021 | ||
Former [2021/46] | FI | 16.06.2021 | |
LT | 16.06.2021 | Documents cited: | Search | [Y]US2003008432 (KUX ANDREAS [DE], et al) [Y] 4 * abstract *; | [A]FR2910708 (COMMISSARIAT ENERGIE ATOMIQUE [FR]) [A] 1* page 7, lines 3-11; figure 2 *; | [A]US7898090 (EATON DAVID D [US]) [A] 5,6 * column 4, line 63 - column 5, line 48; figures 5,6 *; | [YA]WO2011155114 (PANASONIC CORP [JP], et al) [Y] 8-11 * figures 15-22 * * abstract * [A] 5,6; | [XYI]WO2015000813 (QINETIQ LTD [GB]) [X] 1-3,7 * page 7, line 27 - page 9, line 2; figures 2,3 * * page 9, line 3 - page 10, line 10; figure 4 * * page 1, ligne 26 - page 2, ligne 8 et page 7, lignes 14-26;; figure 1B * [Y] 4,8-11 [I] 5,6,12 |