blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3239990

EP3239990 - METHOD OF MANUFACTURING AN ELECTRICAL CABLE [Right-click to bookmark this link]
Former [2017/44]ELECTRICAL CABLE AND METHOD OF MANUFACTURING SUCH AN ELECTRICAL CABLE
[2020/49]
StatusNo opposition filed within time limit
Status updated on  22.07.2022
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  13.08.2021
FormerGrant of patent is intended
Status updated on  30.03.2021
FormerExamination is in progress
Status updated on  05.03.2021
FormerGrant of patent is intended
Status updated on  15.11.2020
FormerExamination is in progress
Status updated on  11.09.2020
FormerRequest for examination was made
Status updated on  11.05.2018
FormerThe application has been published
Status updated on  29.09.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Yazaki Systems Technologies GmbH
Im Gewerbepark B32
93059 Regensburg / DE
[2017/44]
Inventor(s)01 / LEHNER, Carmen
Germanenstraße 15
93107 Thalmassing / DE
 [2017/44]
Representative(s)Patentanwaltskanzlei WILHELM & BECK
Prinzenstraße 13
80639 München / DE
[2017/44]
Application number, filing date17167884.025.04.2017
[2017/44]
Priority number, dateDE20161010764525.04.2016         Original published format: DE102016107645
[2017/44]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3239990
Date:01.11.2017
Language:DE
[2017/44]
Type: B1 Patent specification 
No.:EP3239990
Date:15.09.2021
Language:DE
[2021/37]
Search report(s)(Supplementary) European search report - dispatched on:EP26.09.2017
ClassificationIPC:H01B11/00, H01B13/02
[2017/44]
CPC:
H01B11/002 (EP); H01B13/02 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/24]
Former [2017/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES ELEKTRISCHEN KABELS[2020/49]
English:METHOD OF MANUFACTURING AN ELECTRICAL CABLE[2020/49]
French:PROCÉDÉ DE FABRICATION D'UN CÂBLE ÉLECTRIQUE[2020/49]
Former [2017/44]ELEKTRISCHES KABEL UND VERFAHREN ZUR HERSTELLUNG SOLCH EINES ELEKTRISCHEN KABELS
Former [2017/44]ELECTRICAL CABLE AND METHOD OF MANUFACTURING SUCH AN ELECTRICAL CABLE
Former [2017/44]CÂBLE ÉLECTRIQUE ET PROCÉDÉ DE FABRICATION D'UN TEL CÂBLE ÉLECTRIQUE
Examination procedure25.04.2017Date on which the examining division has become responsible
02.05.2018Amendment by applicant (claims and/or description)
02.05.2018Examination requested  [2018/24]
11.09.2020Despatch of a communication from the examining division (Time limit: M04)
14.10.2020Reply to a communication from the examining division
16.11.2020Communication of intention to grant the patent
03.03.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
31.03.2021Communication of intention to grant the patent
04.08.2021Fee for grant paid
04.08.2021Fee for publishing/printing paid
04.08.2021Receipt of the translation of the claim(s)
Opposition(s)16.06.2022No opposition filed within time limit [2022/34]
Fees paidRenewal fee
18.03.2019Renewal fee patent year 03
02.03.2020Renewal fee patent year 04
10.02.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.04.2017
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
TR15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
AT25.04.2022
IE25.04.2022
LU25.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
[2024/29]
Former [2024/22]HU25.04.2017
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
AT25.04.2022
IE25.04.2022
LU25.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2024/20]HU25.04.2017
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
AT25.04.2022
IE25.04.2022
LU25.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2024/18]HU25.04.2017
AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
AT25.04.2022
IE25.04.2022
LU25.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/35]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
AT25.04.2022
IE25.04.2022
LU25.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/20]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE25.04.2022
LU25.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/10]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
LU25.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/09]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
LU25.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/08]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
LU25.04.2022
Former [2023/06]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/36]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/29]AL15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/25]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/24]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/23]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
PL15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
PT17.01.2022
Former [2022/10]FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/09]FI15.09.2021
LT15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/08]FI15.09.2021
LT15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/07]LT15.09.2021
NO15.12.2021
Documents cited:Search[XAI]US6608255  (DONNER DARYLE PAT [US], et al) [X] 1-3,5,6,8 * column 4, line 46 - line 52 * * column 6, line 6 - line 26 * * figures 3, 4 * [A] 7 [I] 4,9,10;
 [XI]JP2007220378  (YAZAKI CORP) [X] 1-6,9 * paragraphs [0015] , [0 20] , [0 22] , [0 34] , [0 35] * * figures 1, 2 * [I] 8,10;
 [A]WO9725725  (GEN CABLE IND INC [US]) [A] 1,6 * page 12, line 30 * * page 19, line 7 - line 21 * * figures 2C, 2D *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.