EP3242067 - IMPROVED PIPE ENGAGEMENT AND TESTING SYSTEM [Right-click to bookmark this link] | Status | The application has been withdrawn Status updated on 10.05.2019 Database last updated on 02.11.2024 | |
Former | Examination is in progress Status updated on 18.02.2019 | ||
Former | Request for examination was made Status updated on 24.08.2018 | ||
Former | The application has been published Status updated on 06.10.2017 | Most recent event Tooltip | 10.05.2019 | Withdrawal of application | published on 12.06.2019 [2019/24] | Applicant(s) | For all designated states Pipeline Pressure Isolation Group, LLC 21233 FM 529 Cypress, TX 77433 / US | [2017/45] | Inventor(s) | 01 /
Breaux, Kenneth 5615 Doliver Houston, TX Texas 77056 / US | 02 /
Buckley, W. Scott 2800 Katy Hockley Cutoff Road Katy, TX Texas 77493 / US | [2017/45] | Representative(s) | Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | [N/P] |
Former [2017/45] | Gosnall, Toby Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | Application number, filing date | 17169589.3 | 04.05.2017 | [2017/45] | Priority number, date | US201662332392P | 05.05.2016 Original published format: US 201662332392 P | US201662332394P | 05.05.2016 Original published format: US 201662332394 P | [2017/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3242067 | Date: | 08.11.2017 | Language: | EN | [2017/45] | Type: | A3 Search report | No.: | EP3242067 | Date: | 21.02.2018 | Language: | EN | [2018/08] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.01.2018 | Classification | IPC: | F16L55/128, F16L27/04 | [2017/45] | CPC: |
F16L27/04 (EP,US);
G01M3/2815 (US);
F16L55/1283 (EP,US);
G01M3/022 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/39] |
Former [2017/45] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERBESSERTE ROHREINRASTUNG UND TESTSYSTEM | [2017/45] | English: | IMPROVED PIPE ENGAGEMENT AND TESTING SYSTEM | [2017/45] | French: | ENGAGEMENT DE TUYAU AMÉLIORÉ ET SYSTÈME DE TEST | [2017/45] | Examination procedure | 04.05.2017 | Date on which the examining division has become responsible | 21.08.2018 | Amendment by applicant (claims and/or description) | 21.08.2018 | Examination requested [2018/39] | 21.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 03.05.2019 | Application withdrawn by applicant [2019/24] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XY]US4991651 (CAMPBELL DOUGLAS C [CA]) [X] 4-7,13 * figures 1,2 * * column 4, lines 37-51 * * column 5, lines 8-12 * * column 1, lines 15-34 * * column 6, lines 3-34 * * column 9, line 61 - column 10, line 29 * [Y] 1,2,8; | [Y]US2006064829 (HOULDEY PETER [GB], et al) [Y] 1,2,8 * figures 2,3,4a ** paragraphs [0002] , [0005] , [0030] - [0033] * |