EP3400918 - IMPROVED TAMPON WITHDRAWAL SYSTEM AND METHOD FOR THE FABRICATION THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 09.02.2021 | ||
Former | Examination is in progress Status updated on 16.03.2020 | ||
Former | Request for examination was made Status updated on 17.05.2019 | ||
Former | The application has been published Status updated on 12.10.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Ontex BV Genthof 5 9255 Buggenhout / BE | For all designated states Ontex Group NV Korte Keppestraat 21 9320 Erembodegem / BE | [2020/42] |
Former [2018/46] | For all designated states Ontex BVBA Genthof 5 9255 Buggenhout / BE | ||
For all designated states Ontex Group NV Korte Keppestraat 21 9320 Erembodegem / BE | Inventor(s) | 01 /
HEEGE, Rudolf Pommerbachstraße 79 56759 Kaiserses / DE | 02 /
HEEGE, Thomas In der Wettau 1 56761 Düngenheim / DE | [2018/46] | Representative(s) | Saurat, Thibault Ontex BV Legal Department Korte Keppestraat 21 9320 Erembodegem / BE | [2021/14] |
Former [2018/46] | Larangé, Françoise Ontex BVBA Korte Keppestraat 21 9320 Aalst / BE | Application number, filing date | 17170366.3 | 10.05.2017 | [2018/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3400918 | Date: | 14.11.2018 | Language: | EN | [2018/46] | Type: | B1 Patent specification | No.: | EP3400918 | Date: | 07.04.2021 | Language: | EN | [2021/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.09.2017 | Classification | IPC: | A61F13/20, A61F13/34 | [2018/46] | CPC: |
A61F13/206 (EP);
A61F13/2094 (EP);
A61F13/34 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/25] |
Former [2018/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERBESSERTES TAMPONENTNAHMESYSTEM SOWIE VERFAHREN ZUR HERSTELLUNG DAVON | [2018/46] | English: | IMPROVED TAMPON WITHDRAWAL SYSTEM AND METHOD FOR THE FABRICATION THEREOF | [2018/46] | French: | SYSTÈME DE RETRAIT DE TAMPON AMÉLIORÉ ET SON PROCÉDÉ DE FABRICATION | [2018/46] | Examination procedure | 14.05.2019 | Amendment by applicant (claims and/or description) | 14.05.2019 | Examination requested [2019/25] | 14.05.2019 | Date on which the examining division has become responsible | 19.03.2020 | Despatch of a communication from the examining division (Time limit: M03) | 17.06.2020 | Reply to a communication from the examining division | 10.02.2021 | Communication of intention to grant the patent | 02.03.2021 | Fee for grant paid | 02.03.2021 | Fee for publishing/printing paid | 02.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Fees paid | Renewal fee | 31.05.2019 | Renewal fee patent year 03 | 30.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.05.2017 | AL | 07.04.2021 | AT | 07.04.2021 | CY | 07.04.2021 | CZ | 07.04.2021 | DK | 07.04.2021 | EE | 07.04.2021 | ES | 07.04.2021 | FI | 07.04.2021 | HR | 07.04.2021 | IT | 07.04.2021 | LT | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | MT | 07.04.2021 | NL | 07.04.2021 | PL | 07.04.2021 | RO | 07.04.2021 | RS | 07.04.2021 | SE | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | TR | 07.04.2021 | IE | 10.05.2021 | LU | 10.05.2021 | BE | 31.05.2021 | BG | 07.07.2021 | NO | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | PT | 09.08.2021 | [2024/42] |
Former [2024/29] | HU | 10.05.2017 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
TR | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BE | 31.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2024/22] | HU | 10.05.2017 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BE | 31.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2023/33] | HU | 10.05.2017 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BE | 31.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2023/30] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BE | 31.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/36] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BE | 31.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/34] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BE | 31.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/29] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/26] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/23] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/21] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
IE | 10.05.2021 | ||
LU | 10.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 29.12.2021 | ||
Former [2022/10] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
LU | 10.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 29.12.2021 | ||
Former [2022/09] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
LU | 10.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/08] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
LU | 10.05.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/07] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/52] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/51] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/50] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
Former [2021/49] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | ||
NL | 07.04.2021 | ||
BG | 07.07.2021 | ||
Former [2021/46] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | Documents cited: | Search | [A]GB1518320 (BIKOMA GMBH) [A] 1-13 * the whole document *; | [XAY]GB1521028 (BIKOMA GMBH) [X] 1,2,4 * page 1, line 30 - line 63 * * page 2, line 8 - line 47 * * page 3, line 75 - line 125 * * page 4, line 45 - line 95; figures 1-3, 16-21 * [A] 5-13 [Y] 3; | [A]GB2032783 (MOELNLYCKE AB) [A] 1-13* page 1, line 70 - page 2, line 7; figure 1; claims 1-3 *; | [XYI]DE2926130 (HAHN CARL DR GMBH) [X] 1,2,4-7,10,11,13 * page 3, paragraph 1 * * page 4, paragraph 2 * * page 8, paragraph 3 - page 10, paragraph 2; figures 1-3 * [Y] 3,8,9 [I] 12; | [Y]EP1108407 (PROCTER & GAMBLE [US]) [Y] 3,8,9 * paragraph [0027] - paragraph [0031]; figures 1-4 * | by applicant | US3976075 | US4787895 | WO2015104301 |