EP3401442 - ROAD FINISHER WITH STEERING COMPENSATION AND CONTROL METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.10.2020 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 15.11.2019 | ||
Former | Grant of patent is intended Status updated on 11.07.2019 | ||
Former | Examination is in progress Status updated on 07.08.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Joseph Vögele AG Joseph-Vögele-Straße 1 67067 Ludwigshafen / DE | [2018/46] | Inventor(s) | 01 /
BUSCHMANN, Martin Johanniterstraße 7 67435 Neustadt / DE | [2018/46] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2018/46] | Application number, filing date | 17170604.7 | 11.05.2017 | [2018/46] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3401442 | Date: | 14.11.2018 | Language: | DE | [2018/46] | Type: | B1 Patent specification | No.: | EP3401442 | Date: | 18.12.2019 | Language: | DE | [2019/51] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.11.2017 | Classification | IPC: | E01C19/48 | [2018/46] | CPC: |
E01C19/004 (EP,US);
E01C19/48 (EP,BR,CN,US);
B62D6/002 (BR,US);
E01C19/22 (BR,US);
E01C2301/14 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/46] | Title | German: | STRASSENFERTIGER MIT LENKKOMPENSATION UND STEUERVERFAHREN | [2018/46] | English: | ROAD FINISHER WITH STEERING COMPENSATION AND CONTROL METHOD | [2018/46] | French: | FINISSEUSE DE ROUTE AYANT UNE COMPENSATION DE BRAQUAGE ET PROCÉDÉ DE COMMANDE | [2018/46] | Examination procedure | 18.04.2018 | Amendment by applicant (claims and/or description) | 18.04.2018 | Examination requested [2018/46] | 18.04.2018 | Date on which the examining division has become responsible | 27.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 30.11.2018 | Reply to a communication from the examining division | 12.07.2019 | Communication of intention to grant the patent | 07.11.2019 | Fee for grant paid | 07.11.2019 | Fee for publishing/printing paid | 07.11.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 21.09.2020 | No opposition filed within time limit [2020/48] | Fees paid | Renewal fee | 28.05.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.05.2017 | AL | 18.12.2019 | CY | 18.12.2019 | CZ | 18.12.2019 | DK | 18.12.2019 | EE | 18.12.2019 | ES | 18.12.2019 | FI | 18.12.2019 | HR | 18.12.2019 | LT | 18.12.2019 | LV | 18.12.2019 | MC | 18.12.2019 | MK | 18.12.2019 | MT | 18.12.2019 | NL | 18.12.2019 | RO | 18.12.2019 | RS | 18.12.2019 | SE | 18.12.2019 | SI | 18.12.2019 | SK | 18.12.2019 | SM | 18.12.2019 | TR | 18.12.2019 | BG | 18.03.2020 | NO | 18.03.2020 | GR | 19.03.2020 | IS | 18.04.2020 | IE | 11.05.2020 | LU | 11.05.2020 | PT | 13.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | LI | 31.05.2020 | [2022/33] |
Former [2022/27] | HU | 11.05.2017 | |
AL | 18.12.2019 | ||
CY | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
MT | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
TR | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 13.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/24] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 13.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/20] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 13.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/15] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
LU | 11.05.2020 | ||
PT | 13.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/12] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/08] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2020/51] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/47] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/40] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/37] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
PT | 13.05.2020 | ||
Former [2020/36] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
PT | 13.05.2020 | ||
Former [2020/35] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/32] | AL | 18.12.2019 | |
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/25] | FI | 18.12.2019 | |
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/23] | FI | 18.12.2019 | |
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/22] | FI | 18.12.2019 | |
LT | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
Former [2020/21] | NO | 18.03.2020 | Documents cited: | Search | [XI]JPH06294106 (KENSETSUSHO TOHOKU CHIHO KENSE, et al); | [A]EP1990472 (LEICA GEOSYSTEMS AG [CH]); | [IA]JP2009121192 (SUMITOMO CONSTR MACHINERY MFG); | [A]EP2620549 (JOSEPH VOEGELE AG [DE]) | Examination | EP0620319 | by applicant | EP0620319 | EP3106562 |