EP3244678 - FACILITATING DETECTION OF CONTROL CHANNELS WITH DIFFERENT TRANSMISSION TIME INTERVALS IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.03.2021 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 27.03.2020 | ||
Former | Grant of patent is intended Status updated on 04.02.2020 | ||
Former | Examination is in progress Status updated on 29.03.2019 | ||
Former | Request for examination was made Status updated on 06.04.2018 | ||
Former | The application has been published Status updated on 13.10.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states ASUSTek Computer Inc. No. 15, Lite Rd., Peitou Dist. Taipei City 112 / TW | [2020/18] |
Former [2017/46] | For all designated states ASUSTek Computer Inc. No. 15, Lite Road Peitou, Taipei-City 112 / TW | Inventor(s) | 01 /
TSENG, Li-Chih c/o ASUSTek Computer Inc. No.15, Lite Rd. Peitou Dist. Taipei City 112 / TW | 02 /
LIN, Ko-Chiang c/o ASUSTek Computer Inc. No.15, Lite Rd. Peitou Dist. Taipei City 112 / TW | 03 /
LI, Ming-Che c/o ASUSTek Computer Inc. No.15, Lite Rd. Peitou Dist. Taipei City 112 / TW | [2020/18] |
Former [2017/46] | 01 /
TSENG, Li-Chih c/o ASUSTek Computer Inc. No.15, Lite Rd., Peitou Dist. 112 Taipei City / TW | ||
02 /
LIN, Ko-Chiang c/o ASUSTek Computer Inc. No.15, Lite Rd., Peitou Dist. 112 Taipei City / TW | |||
03 /
LI, Ming-Che c/o ASUSTek Computer Inc. No.15, Lite Rd., Peitou Dist. 112 Taipei City / TW | Representative(s) | Hoefer & Partner Patentanwälte mbB Pilgersheimer Straße 20 81543 München / DE | [2017/46] | Application number, filing date | 17170834.0 | 12.05.2017 | [2017/46] | Priority number, date | US201662335517P | 12.05.2016 Original published format: US 201662335517 P | [2017/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3244678 | Date: | 15.11.2017 | Language: | EN | [2017/46] | Type: | B1 Patent specification | No.: | EP3244678 | Date: | 29.04.2020 | Language: | EN | [2020/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.10.2017 | Classification | IPC: | H04W72/04, H04W72/12, H04W74/00, H04L5/00 | [2020/08] | CPC: |
H04W74/006 (EP,US);
H04L5/0053 (EP,CN,KR,US);
H04W72/0446 (CN,US);
H04L1/0013 (CN);
H04L1/0027 (CN);
H04L1/0061 (CN);
H04L5/0007 (KR);
H04L5/0037 (KR);
H04W24/00 (US);
H04W52/143 (US);
H04W72/21 (US);
H04W72/23 (EP,CN,KR,US);
|
Former IPC [2017/46] | H04W72/04, H04W72/12, H04W74/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/19] |
Former [2017/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ERLEICHTERUNG DES NACHWEISES VON STEUERKANÄLEN MIT UNTERSCHIEDLICHEN ÜBERTRAGUNGSZEITINTERVALLEN IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM | [2017/46] | English: | FACILITATING DETECTION OF CONTROL CHANNELS WITH DIFFERENT TRANSMISSION TIME INTERVALS IN A WIRELESS COMMUNICATION SYSTEM | [2017/46] | French: | FACILITATION DE LA DÉTECTION DE CANAUX DE COMMANDE AYANT DIFFÉRENTS INTERVALLES DE TEMPS DE TRANSMISSION DANS UN SYSTÈME DE COMMUNICATION SANS FIL | [2017/46] | Examination procedure | 12.05.2017 | Date on which the examining division has become responsible | 28.03.2018 | Amendment by applicant (claims and/or description) | 28.03.2018 | Examination requested [2018/19] | 02.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 05.08.2019 | Reply to a communication from the examining division | 05.02.2020 | Communication of intention to grant the patent | 19.03.2020 | Fee for grant paid | 19.03.2020 | Fee for publishing/printing paid | 19.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.02.2021 | No opposition filed within time limit [2021/14] | Fees paid | Renewal fee | 31.05.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.05.2017 | AL | 29.04.2020 | AT | 29.04.2020 | CY | 29.04.2020 | CZ | 29.04.2020 | DK | 29.04.2020 | EE | 29.04.2020 | ES | 29.04.2020 | FI | 29.04.2020 | HR | 29.04.2020 | IT | 29.04.2020 | LT | 29.04.2020 | LV | 29.04.2020 | MC | 29.04.2020 | MK | 29.04.2020 | MT | 29.04.2020 | NL | 29.04.2020 | PL | 29.04.2020 | RO | 29.04.2020 | RS | 29.04.2020 | SE | 29.04.2020 | SI | 29.04.2020 | SK | 29.04.2020 | SM | 29.04.2020 | TR | 29.04.2020 | IE | 12.05.2020 | LU | 12.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | LI | 31.05.2020 | BG | 29.07.2020 | NO | 29.07.2020 | GR | 30.07.2020 | IS | 29.08.2020 | PT | 31.08.2020 | [2022/33] |
Former [2022/27] | HU | 12.05.2017 | |
AL | 29.04.2020 | ||
AT | 29.04.2020 | ||
CY | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
MT | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
TR | 29.04.2020 | ||
IE | 12.05.2020 | ||
LU | 12.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/24] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
IE | 12.05.2020 | ||
LU | 12.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/20] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
IE | 12.05.2020 | ||
LU | 12.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/15] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
LU | 12.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/10] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/09] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/08] | AL | 29.04.2020 | |
DK | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/04] | AL | 29.04.2020 | |
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/01] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/51] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/50] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/48] | FI | 29.04.2020 | |
LT | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/47] | LT | 29.04.2020 | |
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
Former [2020/46] | IS | 29.08.2020 | Documents cited: | Search | [XI]US2016128028 (MALLIK SIDDHARTHA [US], et al) [X] 1-3,5,6,8-10,12-17 * abstract * * figures 3B-18 * * paragraphs [0003] , [0007] , [0009] , [0010] , [0012] , [0014] , [0016] , [0043] - [0048] * * paragraphs [0058] - [0061] - [0069] - [0078] - [0087] - [0106] - [0120] , [0140] , [0142] , [0170] , [0171] * * claims 1-55 * [I] 4,7,11; | [A] - ERICSSON, "Downlink control signaling design for short TTI", vol. RAN WG1, no. Busan; 20160411 - 20160415, (20160401), 3GPP DRAFT; R1-163322_DOWNLINK CONTROL SIGNAL DESIGN FOR SHORT TTI, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRA, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84b/Docs/, (20160401), XP051079812 [A] 1-17 * the whole document * | [A] - QUALCOMM INCORPORATED, "DL channel design for shortened TTI", vol. RAN WG1, no. Busan, Korea; 20160411 - 20160415, (20160402), 3GPP DRAFT; R1-163068 DL CHANNEL DESIGN FOR SHORTENED TTI, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84b/Docs/, (20160402), XP051080512 [A] 1-17 * the whole document * | Examination | WO2016064049 | - HUAWEI ET AL, "DCI design for short TTI", vol. RAN WG1, no. Busan, Korea; 20160411 - 20160415, (20160402), 3GPP DRAFT; R1-162588, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84b/Docs/, (20160402), XP051080276 | by applicant | - "E-UTRA Physical layer procedures (Release 13", 3GPP TS 36.213 VL3.1.1 | - "E-UTRA Study on latency reduction techniques for LTE (Release 13", 3GPP TR 36.211 V13.1.0 | - "E-UTRA Study on latency reduction techniques for LTE (Release 13", 3GPP TR 36.211 V 13.1.0 | - "On design of DL control channel for shorter TTI operation", RL-163267, 3GPP TSG-RAN WG1 MEETING #84BIS | - "User throughput evaluation on mobility events", 3GPP TSG-RAN WG2 MEETING #93BIS |