EP3254975 - PACKAGING MACHINE FOR LONG FOOD PASTA OR SIMILAR PRODUCTS WITH FORMATION OF SINGLE PACKAGES OF PASTA OR OTHER, EQUIPPED WITH TRANSVERSE FLAP CLOSING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.09.2023 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 14.10.2022 | ||
Former | Grant of patent is intended Status updated on 06.06.2022 | ||
Former | Examination is in progress Status updated on 31.01.2019 | ||
Former | Request for examination was made Status updated on 15.06.2018 | ||
Former | The application has been published Status updated on 10.11.2017 | Most recent event Tooltip | 10.05.2024 | Lapse of the patent in a contracting state New state(s): BE, CH, FR, GB | published on 12.06.2024 [2024/24] | Applicant(s) | For all designated states Altopack S.P.A. Via Roma, 136 55011 Altopascio (LU) / IT | [2017/50] | Inventor(s) | 01 /
VEZZANI, Mr. Giuseppe Via Giuseppe Cattori, 3 6900 PARADISO - LUGANO / CH | [2017/50] | Representative(s) | Mittler, Enrico, et al Mittler & C. S.r.l. Viale Lombardia, 20 20131 Milano / IT | [2017/50] | Application number, filing date | 17174430.3 | 05.06.2017 | [2017/50] | Priority number, date | IT2016UA04235 | 09.06.2016 Original published format: IT UA20164235 | [2017/50] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3254975 | Date: | 13.12.2017 | Language: | EN | [2017/50] | Type: | B1 Patent specification | No.: | EP3254975 | Date: | 16.11.2022 | Language: | EN | [2022/46] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.07.2017 | Classification | IPC: | B65B19/34, B65B51/30, B65B9/073 | [2017/50] | CPC: |
B65B19/34 (EP);
B29C65/08 (EP);
B29C65/7451 (EP);
B29C65/787 (EP);
B29C65/7894 (EP);
B29C65/7897 (EP);
B29C66/1122 (EP);
B29C66/4312 (EP);
B29C66/81422 (EP);
B29C66/8163 (EP);
B29C66/8225 (EP);
B29C66/83543 (EP);
B29C66/849 (EP);
B65B35/44 (EP);
B65B51/225 (EP);
B65B51/26 (EP);
B65B51/303 (EP);
B65B9/073 (EP);
B29C66/93441 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/29] |
Former [2017/50] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Validation states | MA | 08.06.2018 | Title | German: | VERPACKUNGSMASCHINE FÜR LANGE LEBENSMITTELTEIGWAREN ODER ÄHNLICHE PRODUKTE MIT AUSBILDUNG VON EINZELPACKUNGEN VON TEIGWAREN ODER ANDEREM, MIT TRANSVERSALEM KLAPPENVERSCHLUSS | [2017/50] | English: | PACKAGING MACHINE FOR LONG FOOD PASTA OR SIMILAR PRODUCTS WITH FORMATION OF SINGLE PACKAGES OF PASTA OR OTHER, EQUIPPED WITH TRANSVERSE FLAP CLOSING | [2017/50] | French: | MACHINE D'EMBALLAGE POUR PÂTES ALIMENTAIRES LONGUES OU PRODUITS SIMILAIRES, FORMANT DESEMBALLAGES UNIQUES DE PÂTES ALIMENTAIRES OU AUTRES, ÉQUIPÉS D'UNE FERMETURE À RABAT TRANSVERSAL | [2017/50] | Examination procedure | 05.06.2017 | Date on which the examining division has become responsible | 08.06.2018 | Amendment by applicant (claims and/or description) | 08.06.2018 | Examination requested [2018/29] | 01.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 28.05.2019 | Reply to a communication from the examining division | 10.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 27.04.2020 | Reply to a communication from the examining division | 07.06.2022 | Communication of intention to grant the patent | 05.10.2022 | Fee for grant paid | 05.10.2022 | Fee for publishing/printing paid | 05.10.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 17.08.2023 | No opposition filed within time limit [2023/43] | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 | 23.06.2020 | Renewal fee patent year 04 | 21.06.2021 | Renewal fee patent year 05 | 28.06.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 16.11.2022 | AT | 16.11.2022 | CZ | 16.11.2022 | DK | 16.11.2022 | EE | 16.11.2022 | FI | 16.11.2022 | HR | 16.11.2022 | LT | 16.11.2022 | LV | 16.11.2022 | MC | 16.11.2022 | NL | 16.11.2022 | PL | 16.11.2022 | RO | 16.11.2022 | RS | 16.11.2022 | SE | 16.11.2022 | SI | 16.11.2022 | SK | 16.11.2022 | SM | 16.11.2022 | NO | 16.02.2023 | GR | 17.02.2023 | IS | 16.03.2023 | PT | 16.03.2023 | GB | 05.06.2023 | IE | 05.06.2023 | LU | 05.06.2023 | BE | 30.06.2023 | CH | 30.06.2023 | FR | 30.06.2023 | [2024/24] |
Former [2024/21] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
IE | 05.06.2023 | ||
LU | 05.06.2023 | ||
Former [2024/15] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
LU | 05.06.2023 | ||
Former [2024/09] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/51] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/38] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/37] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/35] | AT | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/34] | AT | 16.11.2022 | |
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/33] | AT | 16.11.2022 | |
DK | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/29] | AT | 16.11.2022 | |
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/26] | AT | 16.11.2022 | |
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/24] | AT | 16.11.2022 | |
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/23] | AT | 16.11.2022 | |
FI | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/22] | AT | 16.11.2022 | |
FI | 16.11.2022 | ||
LT | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/20] | LT | 16.11.2022 | |
NO | 16.02.2023 | Documents cited: | Search | [XI]EP1321367 (BUHRS ZAANDAM BV [NL]) [X] 1,3 * figures 1-5 * * paragraphs [0024] , [ 0034] * [I] 2; | [A]US6662527 (SUGA TADORU [JP]) [A] 1-3 * column 1, line 53 - column 2, line 12 * * column 3, line 5 - column 3, line 8 * * column 3, line 26 - column 3, line 28 * * figures 1-11 *; | [A]EP1442984 (KPL PACKAGING SPA [IT]) [A] 1-3 * the whole document *; | [A]WO2009040297 (DP S R L [IT], et al) [A] 1-3 * the whole document *; | [A]EP2128037 (CHOKOKU PLAST CORP [JP]) [A] 1-3* the whole document * |