EP3260797 - INDOOR AIR CONDITIONING SYSTEM AND ARRANGEMENT OF THE INDOOR AIR CONDITIONING SYSTEM [Right-click to bookmark this link] | |||
Former [2017/52] | SYSTEM FOR CONDITIONING AIR OF A ROOM, AND INSTALLATION OF THE SYSTEM | ||
[2021/43] | Status | No opposition filed within time limit Status updated on 02.09.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 24.09.2021 | ||
Former | Grant of patent is intended Status updated on 27.04.2021 | ||
Former | Examination is in progress Status updated on 24.04.2020 | ||
Former | Request for examination was made Status updated on 06.07.2018 | ||
Former | The application has been published Status updated on 24.11.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Futron GmbH Elisabethstraße 29 08491 Netzschkau / DE | [2017/52] | Inventor(s) | 01 /
Fuhrmann, Jörg Lessingstraße 11 08491 Netzschkau / DE | [2017/52] | Representative(s) | Sperling, Thomas Sperling, Fischer & Heyner Patentanwälte Tolkewitzer Straße 22 01277 Dresden / DE | [2017/52] | Application number, filing date | 17176867.4 | 20.06.2017 | [2017/52] | Priority number, date | DE201610111292 | 21.06.2016 Original published format: DE102016111292 | [2017/52] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3260797 | Date: | 27.12.2017 | Language: | DE | [2017/52] | Type: | B1 Patent specification | No.: | EP3260797 | Date: | 27.10.2021 | Language: | DE | [2021/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.10.2017 | Classification | IPC: | F25B41/39, F24F1/022, F25B40/04, F24F13/20 | [2021/18] | CPC: |
F25B40/04 (EP);
F24F1/022 (EP);
F24F13/20 (EP);
F25B41/39 (EP);
F25B2339/047 (EP);
F25B2400/0401 (EP);
|
Former IPC [2017/52] | F25B40/04, F24F1/02, F24F13/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/39] |
Former [2018/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | ||
Former [2017/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | RAUMLUFTKONDITIONIERUNGSSYSTEM UND ANORDNUNG DES RAUMLUFTKONDITIONIERUNGSSYSTEMS | [2021/43] | English: | INDOOR AIR CONDITIONING SYSTEM AND ARRANGEMENT OF THE INDOOR AIR CONDITIONING SYSTEM | [2021/43] | French: | SYSTÈME DE CONDITIONNEMENT D'AIR INTÉRIEUR ET ARRANGEMENT DU SYSTÈME DE CONDITIONNEMENT D'AIR INTÉRIEUR | [2021/43] |
Former [2017/52] | SYSTEM ZUM KONDITIONIEREN VON LUFT EINES RAUMES UND ANORDNUNG DES SYSTEMS | ||
Former [2017/52] | SYSTEM FOR CONDITIONING AIR OF A ROOM, AND INSTALLATION OF THE SYSTEM | ||
Former [2017/52] | SYSTÈME DE CONDITIONNEMENT D'AIR D'UNE PIÈCE ET ENSEMBLE SYSTÈME | Examination procedure | 20.06.2017 | Date on which the examining division has become responsible | 27.06.2018 | Amendment by applicant (claims and/or description) | 27.06.2018 | Examination requested [2018/32] | 30.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 28.08.2020 | Reply to a communication from the examining division | 28.04.2021 | Communication of intention to grant the patent | 20.08.2021 | Fee for grant paid | 20.08.2021 | Fee for publishing/printing paid | 20.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 28.07.2022 | No opposition filed within time limit [2022/40] | Fees paid | Renewal fee | 21.05.2019 | Renewal fee patent year 03 | 22.06.2020 | Renewal fee patent year 04 | 30.04.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.06.2017 | AL | 27.10.2021 | CY | 27.10.2021 | CZ | 27.10.2021 | DK | 27.10.2021 | EE | 27.10.2021 | ES | 27.10.2021 | FI | 27.10.2021 | HR | 27.10.2021 | LT | 27.10.2021 | LV | 27.10.2021 | MC | 27.10.2021 | MK | 27.10.2021 | MT | 27.10.2021 | NL | 27.10.2021 | PL | 27.10.2021 | RO | 27.10.2021 | RS | 27.10.2021 | SE | 27.10.2021 | SI | 27.10.2021 | SK | 27.10.2021 | SM | 27.10.2021 | BG | 27.01.2022 | GR | 28.01.2022 | IS | 27.02.2022 | PT | 28.02.2022 | GB | 20.06.2022 | IE | 20.06.2022 | LU | 20.06.2022 | FR | 30.06.2022 | [2024/42] |
Former [2024/22] | HU | 20.06.2017 | |
AL | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
MK | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
GB | 20.06.2022 | ||
IE | 20.06.2022 | ||
LU | 20.06.2022 | ||
FR | 30.06.2022 | ||
Former [2024/20] | HU | 20.06.2017 | |
AL | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
GB | 20.06.2022 | ||
IE | 20.06.2022 | ||
LU | 20.06.2022 | ||
FR | 30.06.2022 | ||
Former [2024/18] | HU | 20.06.2017 | |
AL | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
GB | 20.06.2022 | ||
IE | 20.06.2022 | ||
LU | 20.06.2022 | ||
FR | 30.06.2022 | ||
Former [2023/27] | AL | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
GB | 20.06.2022 | ||
IE | 20.06.2022 | ||
LU | 20.06.2022 | ||
FR | 30.06.2022 | ||
Former [2023/22] | AL | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
IE | 20.06.2022 | ||
LU | 20.06.2022 | ||
FR | 30.06.2022 | ||
Former [2023/21] | AL | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
IE | 20.06.2022 | ||
LU | 20.06.2022 | ||
Former [2023/20] | AL | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
IE | 20.06.2022 | ||
Former [2023/08] | AL | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/01] | AL | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/49] | AL | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/35] | CZ | 27.10.2021 | |
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/34] | EE | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/33] | ES | 27.10.2021 | |
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/24] | ES | 27.10.2021 | |
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/23] | ES | 27.10.2021 | |
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
PT | 28.02.2022 | ||
Former [2022/22] | FI | 27.10.2021 | |
LT | 27.10.2021 | ||
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
Former [2022/21] | RS | 27.10.2021 | |
BG | 27.01.2022 | ||
Former [2022/19] | BG | 27.01.2022 | Documents cited: | Search | [XI]GB720779 (V C PATTERSON & ASSOCIATES INC) [X] 1,2,4,5,10,14 * page 1, line 60 - page 2, line 60; figure 1 * [I] 3,6-9,11-13; | [A]DE2165638 (TAKASAGO THERMAL ENGINEERING) [A] 1-14 * page 12; figure 29 *; | [A]DE19502153 (HUMMEL ERICH [DE]) [A] 1-14 * column 3 - column 4; figures 1-3 *; | [A]US6385985 (BUSSJAGER RUDDY C [US], et al) [A] 1-14* column 2 - column 3; figures 1, 3 *; | [A]WO2008094152 (COTHERM OF AMERICA CORP, et al) [A] 1-14 * page 7 - page 8; figures 2-4 *; | [A]GB2458901 (POWRMATIC LTD [GB]) [A] 1-14 * page 3; figure 1 *; | [A]WO2015186850 (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-14 * figure 3 * |