EP3422072 - ILLUMINATION SYSTEM, MICROSCOPE COMPRISING AN ILLUMINATION SYSTEM AND MICROSCOPE METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.11.2020 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 06.12.2019 | ||
Former | Grant of patent is intended Status updated on 30.07.2019 | ||
Former | Request for examination was made Status updated on 24.05.2019 | ||
Former | The application has been published Status updated on 30.11.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Leica Instruments (Singapore) Pte. Ltd. 12 Teban Gardens Crescent 608924 Singapore / SG | [2019/01] | Inventor(s) | 01 /
Themelis, George Im Kuerzenen 5 88131 Lindau / DE | [2019/01] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2019/01] | Application number, filing date | 17179019.9 | 30.06.2017 | [2019/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3422072 | Date: | 02.01.2019 | Language: | EN | [2019/01] | Type: | B1 Patent specification | No.: | EP3422072 | Date: | 08.01.2020 | Language: | EN | [2020/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.01.2018 | Classification | IPC: | G01N21/64, G02B5/20, G02B21/00, G02B21/06, G02B21/16, G02B21/36, G02B26/02 | [2019/31] | CPC: |
G02B21/06 (EP,CN,US);
G01N21/6458 (US);
G02B21/0096 (EP,US);
G02B21/16 (EP,US);
G02B21/36 (EP,US);
G02B26/02 (EP,US);
G02B5/208 (US)
(-)
|
Former IPC [2019/01] | G02B21/00, G02B21/06, G02B21/16, G02B21/36, G02B26/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/26] |
Former [2019/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BELEUCHTUNGSSYSTEM, MIKROSKOP MIT EINEM BELEUCHTUNGSSYSTEM UND MIKROSKOPVERFAHREN | [2019/01] | English: | ILLUMINATION SYSTEM, MICROSCOPE COMPRISING AN ILLUMINATION SYSTEM AND MICROSCOPE METHOD | [2019/01] | French: | SYSTÈME D'ÉCLAIRAGE, MICROSCOPE COMPRENANT UN SYSTÈME D'ÉCLAIRAGE ET PROCÉDÉ DE MICROSCOPE | [2019/01] | Examination procedure | 21.05.2019 | Amendment by applicant (claims and/or description) | 21.05.2019 | Examination requested [2019/26] | 21.05.2019 | Date on which the examining division has become responsible | 31.07.2019 | Communication of intention to grant the patent | 03.12.2019 | Fee for grant paid | 03.12.2019 | Fee for publishing/printing paid | 03.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 09.10.2020 | No opposition filed within time limit [2020/51] | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2017 | AL | 08.01.2020 | AT | 08.01.2020 | CY | 08.01.2020 | CZ | 08.01.2020 | DK | 08.01.2020 | EE | 08.01.2020 | ES | 08.01.2020 | FI | 08.01.2020 | HR | 08.01.2020 | IT | 08.01.2020 | LT | 08.01.2020 | LV | 08.01.2020 | MC | 08.01.2020 | MK | 08.01.2020 | MT | 08.01.2020 | NL | 08.01.2020 | PL | 08.01.2020 | RO | 08.01.2020 | RS | 08.01.2020 | SE | 08.01.2020 | SI | 08.01.2020 | SK | 08.01.2020 | SM | 08.01.2020 | TR | 08.01.2020 | BG | 08.04.2020 | NO | 08.04.2020 | GR | 09.04.2020 | IS | 08.05.2020 | PT | 31.05.2020 | BE | 30.06.2020 | CH | 30.06.2020 | IE | 30.06.2020 | LI | 30.06.2020 | LU | 30.06.2020 | [2022/31] |
Former [2022/30] | HU | 30.06.2017 | |
AL | 08.01.2020 | ||
AT | 08.01.2020 | ||
CY | 08.01.2020 | ||
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
IT | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
MT | 08.01.2020 | ||
NL | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
TR | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
Former [2022/27] | HU | 30.06.2017 | |
AT | 08.01.2020 | ||
CY | 08.01.2020 | ||
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
IT | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
MT | 08.01.2020 | ||
NL | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
TR | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
Former [2021/24] | AT | 08.01.2020 | |
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
IT | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
NL | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
Former [2021/20] | AT | 08.01.2020 | |
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
IT | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
NL | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
CH | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
Former [2021/15] | AT | 08.01.2020 | |
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
IT | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
NL | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
LU | 30.06.2020 | ||
Former [2021/10] | AT | 08.01.2020 | |
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
IT | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
NL | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/50] | CZ | 08.01.2020 | |
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
NL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/49] | CZ | 08.01.2020 | |
DK | 08.01.2020 | ||
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
NL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/48] | DK | 08.01.2020 | |
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
NL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/47] | DK | 08.01.2020 | |
ES | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
NL | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/40] | FI | 08.01.2020 | |
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
NL | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/39] | FI | 08.01.2020 | |
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
NL | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
PT | 31.05.2020 | ||
Former [2020/38] | FI | 08.01.2020 | |
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
NL | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
PT | 31.05.2020 | ||
Former [2020/37] | FI | 08.01.2020 | |
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
NL | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
NO | 08.04.2020 | ||
PT | 31.05.2020 | ||
Former [2020/35] | FI | 08.01.2020 | |
LT | 08.01.2020 | ||
NL | 08.01.2020 | ||
NO | 08.04.2020 | ||
Former [2020/33] | NL | 08.01.2020 | Documents cited: | Search | [A]WO2007090591 (ZEISS CARL SURGICAL GMBH [DE], et al) [A] 1-15 * figure 1 * * abstract * * page 2 - page 3 ** page 6 - page 7 *; | [XI]US2012300294 (JESS HELGE [DE], et al) [X] 1-3,11,12 * figures 1, 2a, 2b * * paragraph [0011] - paragraph [0013] * * paragraph [0048] * * paragraph [0056] * * paragraph [0060] - paragraph [0061] * * paragraph [0068] - paragraph [0069] * * paragraph [0077] * [I] 4-7,9,10,13,14 |