EP3422604 - A SYSTEM OF VISIBLE LIGHT COMMUNICATION FOR A MASS TRANSIT VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.01.2021 Database last updated on 21.12.2024 | |
Former | The patent has been granted Status updated on 31.01.2020 | ||
Former | Grant of patent is intended Status updated on 30.09.2019 | ||
Former | Request for examination was made Status updated on 28.06.2019 | ||
Former | The application has been published Status updated on 30.11.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Vestel Elektronik Sanayi ve Ticaret A.S. Organize Sanayi Bölgesi 45030 Manisa / TR | For all designated states Özyegin Üniversitesi Nisantepe Mah., Orman Sok. 34794 Çekmeköy/ Istanbul / TR | [2019/01] | Inventor(s) | 01 /
GÜLBAHAR, Burhan Özyegin Üniversitesi Nisantepe Mah., Orman Sok. 34794 Çekmeköy/Istanbul / TR | 02 /
MEMISOGLU, Gorkem Vestel Elektronik Sanayi ve Ticaret A.S. Organize Sanayi Bölgesi 45030 Manisa / TR | [2019/01] | Representative(s) | Kehl, Ascherl, Liebhoff & Ettmayr Patentanwälte Partnerschaft mbB Emil-Riedel-Straße 18 80538 München / DE | [N/P] |
Former [2019/01] | Ascherl, Andreas, et al KEHL, ASCHERL, LIEBHOFF & ETTMAYR Patentanwälte - Partnerschaft Emil-Riedel-Strasse 18 80538 München / DE | Application number, filing date | 17179046.2 | 30.06.2017 | [2019/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3422604 | Date: | 02.01.2019 | Language: | EN | [2019/01] | Type: | B1 Patent specification | No.: | EP3422604 | Date: | 04.03.2020 | Language: | EN | [2020/10] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.10.2017 | Classification | IPC: | H04B10/116 | [2019/01] | CPC: |
H04B10/116 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/31] |
Former [2019/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM FÜR SICHTBARE LICHTKOMMUNIKATION FÜR EIN MASSENVERKEHRSMITTEL | [2019/01] | English: | A SYSTEM OF VISIBLE LIGHT COMMUNICATION FOR A MASS TRANSIT VEHICLE | [2019/01] | French: | SYSTÈME DE COMMUNICATION DE LUMIÈRE VISIBLE POUR UN VÉHICULE DE TRANSPORT COLLECTIF | [2019/01] | Examination procedure | 24.06.2019 | Amendment by applicant (claims and/or description) | 24.06.2019 | Examination requested [2019/31] | 24.06.2019 | Date on which the examining division has become responsible | 01.10.2019 | Communication of intention to grant the patent | 24.01.2020 | Fee for grant paid | 24.01.2020 | Fee for publishing/printing paid | 24.01.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.12.2020 | No opposition filed within time limit [2021/06] | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2017 | AL | 04.03.2020 | AT | 04.03.2020 | CY | 04.03.2020 | CZ | 04.03.2020 | DK | 04.03.2020 | EE | 04.03.2020 | ES | 04.03.2020 | FI | 04.03.2020 | HR | 04.03.2020 | IT | 04.03.2020 | LT | 04.03.2020 | LV | 04.03.2020 | MC | 04.03.2020 | MK | 04.03.2020 | MT | 04.03.2020 | NL | 04.03.2020 | PL | 04.03.2020 | RO | 04.03.2020 | RS | 04.03.2020 | SE | 04.03.2020 | SI | 04.03.2020 | SK | 04.03.2020 | SM | 04.03.2020 | BG | 04.06.2020 | NO | 04.06.2020 | GR | 05.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | FR | 30.06.2020 | IE | 30.06.2020 | LI | 30.06.2020 | LU | 30.06.2020 | IS | 04.07.2020 | PT | 29.07.2020 | [2022/31] |
Former [2022/30] | HU | 30.06.2017 | |
AL | 04.03.2020 | ||
AT | 04.03.2020 | ||
CY | 04.03.2020 | ||
CZ | 04.03.2020 | ||
DK | 04.03.2020 | ||
EE | 04.03.2020 | ||
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
IT | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
MC | 04.03.2020 | ||
MT | 04.03.2020 | ||
NL | 04.03.2020 | ||
PL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SI | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
FR | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2022/28] | HU | 30.06.2017 | |
AT | 04.03.2020 | ||
CY | 04.03.2020 | ||
CZ | 04.03.2020 | ||
DK | 04.03.2020 | ||
EE | 04.03.2020 | ||
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
IT | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
MC | 04.03.2020 | ||
MT | 04.03.2020 | ||
NL | 04.03.2020 | ||
PL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SI | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
FR | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2021/23] | AT | 04.03.2020 | |
CZ | 04.03.2020 | ||
DK | 04.03.2020 | ||
EE | 04.03.2020 | ||
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
IT | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
MC | 04.03.2020 | ||
NL | 04.03.2020 | ||
PL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SI | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
FR | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2021/20] | AT | 04.03.2020 | |
CZ | 04.03.2020 | ||
DK | 04.03.2020 | ||
EE | 04.03.2020 | ||
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
IT | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
MC | 04.03.2020 | ||
NL | 04.03.2020 | ||
PL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SI | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
CH | 30.06.2020 | ||
IE | 30.06.2020 | ||
LI | 30.06.2020 | ||
LU | 30.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2021/15] | AT | 04.03.2020 | |
CZ | 04.03.2020 | ||
DK | 04.03.2020 | ||
EE | 04.03.2020 | ||
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
IT | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
MC | 04.03.2020 | ||
NL | 04.03.2020 | ||
PL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SI | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
LU | 30.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2021/10] | AT | 04.03.2020 | |
CZ | 04.03.2020 | ||
DK | 04.03.2020 | ||
EE | 04.03.2020 | ||
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
IT | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
MC | 04.03.2020 | ||
NL | 04.03.2020 | ||
PL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SI | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2021/08] | CZ | 04.03.2020 | |
DK | 04.03.2020 | ||
EE | 04.03.2020 | ||
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
NL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2020/50] | CZ | 04.03.2020 | |
EE | 04.03.2020 | ||
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
NL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2020/49] | CZ | 04.03.2020 | |
ES | 04.03.2020 | ||
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
NL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SK | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2020/48] | ES | 04.03.2020 | |
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
NL | 04.03.2020 | ||
RO | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
SM | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
IS | 04.07.2020 | ||
PT | 29.07.2020 | ||
Former [2020/47] | ES | 04.03.2020 | |
FI | 04.03.2020 | ||
HR | 04.03.2020 | ||
LT | 04.03.2020 | ||
LV | 04.03.2020 | ||
NL | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
IS | 04.07.2020 | ||
Former [2020/46] | FI | 04.03.2020 | |
HR | 04.03.2020 | ||
LV | 04.03.2020 | ||
NL | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
IS | 04.07.2020 | ||
Former [2020/45] | FI | 04.03.2020 | |
HR | 04.03.2020 | ||
LV | 04.03.2020 | ||
NL | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
Former [2020/39] | FI | 04.03.2020 | |
HR | 04.03.2020 | ||
LV | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
BG | 04.06.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
Former [2020/38] | FI | 04.03.2020 | |
HR | 04.03.2020 | ||
LV | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
NO | 04.06.2020 | ||
GR | 05.06.2020 | ||
Former [2020/37] | FI | 04.03.2020 | |
HR | 04.03.2020 | ||
LV | 04.03.2020 | ||
RS | 04.03.2020 | ||
SE | 04.03.2020 | ||
NO | 04.06.2020 | ||
Former [2020/35] | FI | 04.03.2020 | |
NO | 04.06.2020 | Documents cited: | Search | [A]EP1724952 (NAKAGAWA LAB INC [JP]) [A] 1-15 * paragraph [0020] - paragraph [0024]; figures 1,10 * * paragraph [0047] - paragraph [0055] *; | [I]EP2056492 (HAMAMATSU PHOTONICS KK [JP]) [I] 1-12,14,15 * paragraph [0048] - paragraph [0049]; figures 1,4-8 * * paragraph [0059] - paragraph [0060] * * paragraph [0052] * * paragraph [0061] * * paragraph [0064] - paragraph [0074] * * paragraph [0092] - paragraph [0094] *; | [A]WO2014195431 (RESEAU FERRE DE FRANCE [FR], et al) [A] 1-15 * the whole document *; | [A] - SHINICHIRO HARUYAMA ET AL, "New ground-to-train high-speed free-space optical communication system with fast handover mechanism", 2011 OPTICAL FIBER COMMUNICATION CONFERENCE AND EXPOSITION AND THE NATIONAL FIBER OPTIC ENGINEERS CONFERENCE (OFC/NFOEC 2011) : LOS ANGELES, CALIFORNIA, USA, 6 - 10 MARCH 2011, IEEE, PISCATAWAY, NJ, USA, (20110306), ISBN 978-1-4577-0213-6, pages 1 - 3, XP031946727 [A] 1-15 * the whole document * | [A] - PAUDEL RUPAK ET AL, "Modelling of free space optical link for ground-to-train communications using a Gaussian source", IET OPTOELECTRO, THE INSTITUTION OF ENGINEERING AND TECHNOLOGY, MICHAEL FARADAY HOUSE, SIX HILLS WAY, STEVENAGE, HERTS. SG1 2AY, UK, (20130201), vol. 7, no. 1, doi:10.1049/IET-OPT.2012.0047, ISSN 1751-8768, pages 1 - 8, XP006043925 [A] 1-15 * sections 3.1, 3.2 and 3.4;; figures 1,2 * DOI: http://dx.doi.org/10.1049/iet-opt.2012.0047 | by applicant | US7242965 | CN101980458 | US2011230197 | CN105966423 |