blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3422604

EP3422604 - A SYSTEM OF VISIBLE LIGHT COMMUNICATION FOR A MASS TRANSIT VEHICLE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.01.2021
Database last updated on 21.12.2024
FormerThe patent has been granted
Status updated on  31.01.2020
FormerGrant of patent is intended
Status updated on  30.09.2019
FormerRequest for examination was made
Status updated on  28.06.2019
FormerThe application has been published
Status updated on  30.11.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Vestel Elektronik Sanayi ve Ticaret A.S.
Organize Sanayi Bölgesi
45030 Manisa / TR
For all designated states
Özyegin Üniversitesi
Nisantepe Mah., Orman Sok.
34794 Çekmeköy/ Istanbul / TR
[2019/01]
Inventor(s)01 / GÜLBAHAR, Burhan
Özyegin Üniversitesi
Nisantepe Mah., Orman Sok.
34794 Çekmeköy/Istanbul / TR
02 / MEMISOGLU, Gorkem
Vestel Elektronik Sanayi ve Ticaret A.S.
Organize Sanayi Bölgesi
45030 Manisa / TR
 [2019/01]
Representative(s)Kehl, Ascherl, Liebhoff & Ettmayr Patentanwälte Partnerschaft mbB
Emil-Riedel-Straße 18
80538 München / DE
[N/P]
Former [2019/01]Ascherl, Andreas, et al
KEHL, ASCHERL, LIEBHOFF & ETTMAYR
Patentanwälte - Partnerschaft
Emil-Riedel-Strasse 18
80538 München / DE
Application number, filing date17179046.230.06.2017
[2019/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3422604
Date:02.01.2019
Language:EN
[2019/01]
Type: B1 Patent specification 
No.:EP3422604
Date:04.03.2020
Language:EN
[2020/10]
Search report(s)(Supplementary) European search report - dispatched on:EP11.10.2017
ClassificationIPC:H04B10/116
[2019/01]
CPC:
H04B10/116 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/31]
Former [2019/01]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM FÜR SICHTBARE LICHTKOMMUNIKATION FÜR EIN MASSENVERKEHRSMITTEL[2019/01]
English:A SYSTEM OF VISIBLE LIGHT COMMUNICATION FOR A MASS TRANSIT VEHICLE[2019/01]
French:SYSTÈME DE COMMUNICATION DE LUMIÈRE VISIBLE POUR UN VÉHICULE DE TRANSPORT COLLECTIF[2019/01]
Examination procedure24.06.2019Amendment by applicant (claims and/or description)
24.06.2019Examination requested  [2019/31]
24.06.2019Date on which the examining division has become responsible
01.10.2019Communication of intention to grant the patent
24.01.2020Fee for grant paid
24.01.2020Fee for publishing/printing paid
24.01.2020Receipt of the translation of the claim(s)
Opposition(s)07.12.2020No opposition filed within time limit [2021/06]
Fees paidRenewal fee
27.06.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.06.2017
AL04.03.2020
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MK04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
BE30.06.2020
CH30.06.2020
FR30.06.2020
IE30.06.2020
LI30.06.2020
LU30.06.2020
IS04.07.2020
PT29.07.2020
[2022/31]
Former [2022/30]HU30.06.2017
AL04.03.2020
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
BE30.06.2020
CH30.06.2020
FR30.06.2020
IE30.06.2020
LI30.06.2020
LU30.06.2020
IS04.07.2020
PT29.07.2020
Former [2022/28]HU30.06.2017
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
BE30.06.2020
CH30.06.2020
FR30.06.2020
IE30.06.2020
LI30.06.2020
LU30.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/23]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
BE30.06.2020
CH30.06.2020
FR30.06.2020
IE30.06.2020
LI30.06.2020
LU30.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/20]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
CH30.06.2020
IE30.06.2020
LI30.06.2020
LU30.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/15]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
LU30.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/10]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/08]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/50]CZ04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/49]CZ04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/48]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/47]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/46]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/45]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/39]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/38]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
GR05.06.2020
Former [2020/37]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
Former [2020/35]FI04.03.2020
NO04.06.2020
Documents cited:Search[A]EP1724952  (NAKAGAWA LAB INC [JP]) [A] 1-15 * paragraph [0020] - paragraph [0024]; figures 1,10 * * paragraph [0047] - paragraph [0055] *;
 [I]EP2056492  (HAMAMATSU PHOTONICS KK [JP]) [I] 1-12,14,15 * paragraph [0048] - paragraph [0049]; figures 1,4-8 * * paragraph [0059] - paragraph [0060] * * paragraph [0052] * * paragraph [0061] * * paragraph [0064] - paragraph [0074] * * paragraph [0092] - paragraph [0094] *;
 [A]WO2014195431  (RESEAU FERRE DE FRANCE [FR], et al) [A] 1-15 * the whole document *;
 [A]  - SHINICHIRO HARUYAMA ET AL, "New ground-to-train high-speed free-space optical communication system with fast handover mechanism", 2011 OPTICAL FIBER COMMUNICATION CONFERENCE AND EXPOSITION AND THE NATIONAL FIBER OPTIC ENGINEERS CONFERENCE (OFC/NFOEC 2011) : LOS ANGELES, CALIFORNIA, USA, 6 - 10 MARCH 2011, IEEE, PISCATAWAY, NJ, USA, (20110306), ISBN 978-1-4577-0213-6, pages 1 - 3, XP031946727 [A] 1-15 * the whole document *
 [A]  - PAUDEL RUPAK ET AL, "Modelling of free space optical link for ground-to-train communications using a Gaussian source", IET OPTOELECTRO, THE INSTITUTION OF ENGINEERING AND TECHNOLOGY, MICHAEL FARADAY HOUSE, SIX HILLS WAY, STEVENAGE, HERTS. SG1 2AY, UK, (20130201), vol. 7, no. 1, doi:10.1049/IET-OPT.2012.0047, ISSN 1751-8768, pages 1 - 8, XP006043925 [A] 1-15 * sections 3.1, 3.2 and 3.4;; figures 1,2 *

DOI:   http://dx.doi.org/10.1049/iet-opt.2012.0047
by applicantUS7242965
 CN101980458
 US2011230197
 CN105966423
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.