EP3431307 - WHEEL UNITS FOR RAIL VEHICLES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.12.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 23.12.2022 | ||
Former | Grant of patent is intended Status updated on 31.07.2022 | ||
Former | Request for examination was made Status updated on 16.05.2022 | ||
Former | Grant of patent is intended Status updated on 03.01.2022 | ||
Former | Request for examination was made Status updated on 26.07.2019 | ||
Former | The application has been published Status updated on 21.12.2018 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states ALSTOM Holdings 48 rue Albert Dhalenne 93400 Saint-Ouen-sur-Seine / FR | [2023/37] |
Former [2019/04] | For all designated states Bombardier Transportation GmbH Eichhornstraße 3 10785 Berlin / DE | Inventor(s) | 01 /
Dede, Jani Ernst-Barlach-Weg 12 57076 Siegen / DE | 02 /
Pusnik, Arne Rüntestr. 28 57074 Siegen / DE | 03 /
Reimann, Marc Andre Weidenauer Str. 206a 57076 Siegen / DE | 04 /
Thomas, Yannik Thalenweg 8 57258 Freudenberg / DE | [2019/04] | Representative(s) | Cohausz & Florack Patent- & Rechtsanwälte Partnerschaftsgesellschaft mbB Bleichstraße 14 40211 Düsseldorf / DE | [2019/04] | Application number, filing date | 17182629.0 | 21.07.2017 | [2019/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3431307 | Date: | 23.01.2019 | Language: | EN | [2019/04] | Type: | B1 Patent specification | No.: | EP3431307 | Date: | 25.01.2023 | Language: | EN | [2023/04] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.12.2017 | Classification | IPC: | B60B17/00 | [2019/04] | CPC: |
B60B17/0068 (EP);
B60B17/0055 (EP);
B60B2900/113 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/35] |
Former [2019/04] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | RADEINHEITEN FÜR SCHIENENFAHRZEUGE | [2019/04] | English: | WHEEL UNITS FOR RAIL VEHICLES | [2019/04] | French: | UNITÉS DE ROUE POUR VÉHICULES SUR RAILS | [2019/04] | Examination procedure | 19.07.2019 | Examination requested [2019/35] | 19.07.2019 | Date on which the examining division has become responsible | 23.07.2019 | Amendment by applicant (claims and/or description) | 04.01.2022 | Communication of intention to grant the patent | 16.05.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 01.08.2022 | Communication of intention to grant the patent | 08.12.2022 | Fee for grant paid | 08.12.2022 | Fee for publishing/printing paid | 12.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 26.10.2023 | No opposition filed within time limit [2024/01] | Fees paid | Renewal fee | 25.07.2019 | Renewal fee patent year 03 | 23.07.2020 | Renewal fee patent year 04 | 26.07.2021 | Renewal fee patent year 05 | 27.07.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 25.01.2023 | DK | 25.01.2023 | EE | 25.01.2023 | ES | 25.01.2023 | FI | 25.01.2023 | HR | 25.01.2023 | IT | 25.01.2023 | LT | 25.01.2023 | LV | 25.01.2023 | MC | 25.01.2023 | NL | 25.01.2023 | PL | 25.01.2023 | RO | 25.01.2023 | RS | 25.01.2023 | SE | 25.01.2023 | SI | 25.01.2023 | SK | 25.01.2023 | SM | 25.01.2023 | NO | 25.04.2023 | GR | 26.04.2023 | IS | 25.05.2023 | PT | 25.05.2023 | GB | 21.07.2023 | IE | 21.07.2023 | LU | 21.07.2023 | BE | 31.07.2023 | [2024/33] |
Former [2024/26] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
IT | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
GB | 21.07.2023 | ||
LU | 21.07.2023 | ||
BE | 31.07.2023 | ||
Former [2024/24] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
GB | 21.07.2023 | ||
LU | 21.07.2023 | ||
BE | 31.07.2023 | ||
Former [2024/18] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
LU | 21.07.2023 | ||
Former [2024/14] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2024/11] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/50] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/49] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/48] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/46] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/39] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/38] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/37] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/36] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/35] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
NO | 25.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/34] | ES | 25.01.2023 | |
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
PT | 25.05.2023 | ||
Former [2023/33] | ES | 25.01.2023 | |
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
Former [2023/31] | NL | 25.01.2023 | Documents cited: | Search | [A]DE862458 (DEUTSCHE BUNDESBAHN) [A] 1-15 * figure - *; | [A]DE959920 (DEUTSCHE BUNDESBAHN) [A] 1-15 * the whole document *; | [A]GB2053104 (GOLD FIELDS MINING & DEV LTD) [A] 1-15* the whole document *; | [XD]DE102006034896 (DB FERNVERKEHR AG [DE]) [XD] 1-15 * paragraph [0007]; figure -; claim 2 * | by applicant | EP0760294 | DE102006034896 |