blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3435177

EP3435177 - SKELETON WATCH COMPRISING A MOVEMENT WHICH IS INDEPENDENT FROM THE MIDDLE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.01.2021
Database last updated on 27.07.2024
FormerThe patent has been granted
Status updated on  24.01.2020
FormerGrant of patent is intended
Status updated on  29.09.2019
FormerRequest for examination was made
Status updated on  02.08.2019
FormerThe application has been published
Status updated on  30.12.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
The Swatch Group Research and Development Ltd
Rue des Sors 3
2074 Marin / CH
[2019/05]
Inventor(s)01 / Bonadei, Silvano
Rue Gustave-Riat 3
2800 Delémont / CH
02 / Goyet, Damien
45 Rue Principale
68480 Winkel / FR
03 / Zanesco, Vittorio
Rue des Poudrières 79
2000 Neuchâtel / CH
04 / Mouche, Laurent
Gerberweg 33
2560 Nidau / CH
 [2019/05]
Representative(s)ICB SA
Faubourg de l'Hôpital, 3
2001 Neuchâtel / CH
[2019/05]
Application number, filing date17182850.224.07.2017
[2019/05]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3435177
Date:30.01.2019
Language:FR
[2019/05]
Type: B1 Patent specification 
No.:EP3435177
Date:26.02.2020
Language:FR
[2020/09]
Search report(s)(Supplementary) European search report - dispatched on:EP01.03.2018
ClassificationIPC:G04B45/02, G04C3/00, G04G17/04
[2019/05]
CPC:
G04B45/02 (EP,US); G04C3/008 (EP,KR,US); G04C3/10 (CN);
G04B13/00 (CN); G04B13/02 (KR); G04B19/04 (KR,US);
G04B37/04 (KR); G04C3/101 (CN); G04C3/108 (CN);
G04C3/12 (EP,US); G04C3/14 (EP,KR,US); G04G17/04 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/36]
Former [2019/05]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SKELETT-ARMBANDUHR, DIE EIN VOM MITTELTEIL UNABHÄNGIGES UHRWERK UMFASST[2019/05]
English:SKELETON WATCH COMPRISING A MOVEMENT WHICH IS INDEPENDENT FROM THE MIDDLE[2019/05]
French:MONTRE SQUELETTE COMPRENANT UN MOUVEMENT INDÉPENDANT DE LA CARRURE[2019/05]
Examination procedure30.07.2019Examination requested  [2019/36]
30.07.2019Date on which the examining division has become responsible
30.09.2019Communication of intention to grant the patent
14.01.2020Fee for grant paid
14.01.2020Fee for publishing/printing paid
14.01.2020Receipt of the translation of the claim(s)
Opposition(s)27.11.2020No opposition filed within time limit [2021/05]
Fees paidRenewal fee
22.07.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.07.2017
AL26.02.2020
AT26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MK26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
IE24.07.2020
LU24.07.2020
BE31.07.2020
[2022/31]
Former [2022/30]HU24.07.2017
AL26.02.2020
AT26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
IE24.07.2020
LU24.07.2020
BE31.07.2020
Former [2022/27]HU24.07.2017
AT26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
IE24.07.2020
LU24.07.2020
BE31.07.2020
Former [2021/37]AT26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
IE24.07.2020
LU24.07.2020
BE31.07.2020
Former [2021/24]AT26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
LU24.07.2020
BE31.07.2020
Former [2021/20]AT26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
LU24.07.2020
Former [2021/13]AT26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/10]AT26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/50]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/49]CZ26.02.2020
DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/48]DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/47]DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/45]FI26.02.2020
HR26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/40]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/39]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
Former [2020/38]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
NO26.05.2020
GR27.05.2020
Former [2020/37]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
NO26.05.2020
Former [2020/35]FI26.02.2020
NO26.05.2020
Documents cited:Search[A]CH636744  (EBAUCHESFABRIK ETA AG [CH]) [A] 1-10* page 3, column 1, lines 43-68 *;
 [AD]EP0360140  (EBAUCHESFABRIK ETA AG [CH]) [AD] 1-10 * abstract *;
 [A]EP3182226  (SWATCH GROUP RES & DEV LTD [CH]) [A] 1-10 * abstract *
by applicantEP0360140
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.