EP3296849 - SYSTEM AND METHOD FOR FLEXIBLE CONFIGURATION OF A CONTROLLING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 31.05.2019 | ||
Former | Grant of patent is intended Status updated on 13.02.2019 | ||
Former | Request for examination was made Status updated on 21.09.2018 | ||
Former | The application has been published Status updated on 16.02.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Universal Electronics, Inc. 201 E. Sandpointe Avenue, 8th Floor Santa Ana, CA 92707 / US | [2018/12] | Inventor(s) | 01 /
CHAMBERS, Christopher 7108 Katella Avenue, 380 Stanton, CA 90680 / US | 02 /
YUH, Han-Sheng 1456 Maple Hill Road Diamond Bar, CA 91765 / US | 03 /
CLEGG, Steven 8 Velarde Court Rancho Santa Margarita, CA 92688 / US | 04 /
HATAMBEIKI, Arsham 201 E. Sandpointe Avenue 8th Floor Santa Ana, California 92707 / US | [2018/12] | Representative(s) | CMS Cameron McKenna Nabarro Olswang LLP Cannon Place 78 Cannon Street London EC4N 6AF / GB | [2018/12] | Application number, filing date | 17183913.7 | 04.12.2009 | [2018/12] | Priority number, date | US20080201021P | 05.12.2008 Original published format: US 201021 P | US20090629423 | 02.12.2009 Original published format: US 629423 | [2018/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3296849 | Date: | 21.03.2018 | Language: | EN | [2018/12] | Type: | B1 Patent specification | No.: | EP3296849 | Date: | 03.07.2019 | Language: | EN | [2019/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.01.2018 | Classification | IPC: | G06F3/048 | [2018/12] | CPC: |
G08C17/02 (EP,US);
G06F3/0484 (US);
G08C23/04 (EP,US);
G11B27/034 (EP,US);
G11B27/34 (EP,US);
H04N21/42204 (EP,US);
H04N21/42208 (EP,US);
H04N21/42224 (EP,US);
H04N21/42228 (EP,US);
H04N21/8186 (EP,US);
G06F1/16 (US);
G06F3/01 (US);
G06F3/0486 (US);
G06F8/10 (US);
G06F9/06 (US);
G08C2201/20 (EP,US);
G08C2201/21 (EP,US);
G08C2201/30 (EP,US);
G08C2201/92 (EP,US)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/43] |
Former [2018/12] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | SYSTEM UND VERFAHREN ZUR FLEXIBLEN KONFIGURATION EINER STEUERVORRICHTUNG | [2018/12] | English: | SYSTEM AND METHOD FOR FLEXIBLE CONFIGURATION OF A CONTROLLING DEVICE | [2018/12] | French: | SYSTÈME ET PROCÉDÉ POUR UNE CONFIGURATION FLEXIBLE D'UN DISPOSITIF DE COMMANDE | [2018/12] | Examination procedure | 31.07.2017 | Date on which the examining division has become responsible | 18.09.2018 | Amendment by applicant (claims and/or description) | 18.09.2018 | Examination requested [2018/43] | 14.02.2019 | Communication of intention to grant the patent | 23.05.2019 | Fee for grant paid | 23.05.2019 | Fee for publishing/printing paid | 23.05.2019 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP09831203.6 / EP2364471 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 31.07.2017 | Renewal fee patent year 03 | 31.07.2017 | Renewal fee patent year 04 | 31.07.2017 | Renewal fee patent year 05 | 31.07.2017 | Renewal fee patent year 06 | 31.07.2017 | Renewal fee patent year 07 | 31.07.2017 | Renewal fee patent year 08 | 27.12.2017 | Renewal fee patent year 09 | 31.12.2018 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.12.2009 | AT | 03.07.2019 | CY | 03.07.2019 | CZ | 03.07.2019 | DK | 03.07.2019 | EE | 03.07.2019 | ES | 03.07.2019 | FI | 03.07.2019 | HR | 03.07.2019 | IT | 03.07.2019 | LT | 03.07.2019 | LV | 03.07.2019 | MC | 03.07.2019 | MK | 03.07.2019 | MT | 03.07.2019 | NL | 03.07.2019 | PL | 03.07.2019 | RO | 03.07.2019 | SE | 03.07.2019 | SI | 03.07.2019 | SK | 03.07.2019 | SM | 03.07.2019 | TR | 03.07.2019 | BG | 03.10.2019 | NO | 03.10.2019 | GR | 04.10.2019 | IS | 03.11.2019 | PT | 04.11.2019 | IE | 04.12.2019 | LU | 04.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | LI | 31.12.2019 | [2022/32] |
Former [2021/34] | HU | 04.12.2009 | |
AT | 03.07.2019 | ||
CY | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
MT | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 04.12.2019 | ||
LU | 04.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2021/32] | HU | 04.12.2009 | |
AT | 03.07.2019 | ||
CY | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 04.12.2019 | ||
LU | 04.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2021/26] | AT | 03.07.2019 | |
CY | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 04.12.2019 | ||
LU | 04.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/51] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 04.12.2019 | ||
LU | 04.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/46] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 04.12.2019 | ||
LU | 04.12.2019 | ||
Former [2020/39] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/37] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/36] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/27] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
PT | 04.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
SK | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
PT | 04.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
PT | 04.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
IT | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
SE | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/22] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
SE | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/17] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
SE | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/12] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
SE | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/11] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
ES | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
SE | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
PT | 04.11.2019 | ||
Former [2020/10] | AT | 03.07.2019 | |
CZ | 03.07.2019 | ||
FI | 03.07.2019 | ||
LT | 03.07.2019 | ||
NL | 03.07.2019 | ||
SE | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
PT | 04.11.2019 | ||
Former [2020/09] | CZ | 03.07.2019 | |
FI | 03.07.2019 | ||
LT | 03.07.2019 | ||
NL | 03.07.2019 | ||
NO | 03.10.2019 | ||
Former [2020/08] | LT | 03.07.2019 | |
NL | 03.07.2019 | ||
NO | 03.10.2019 | ||
Former [2020/07] | NL | 03.07.2019 | Documents cited: | Search | [A]WO2005055165 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [A] 1-13 * page 3, line 1 - line 5 * * page 5, line 6 - line 13 ** page 8, line 7 - page 16, line 20 *; | [A]US2006288300 (CHAMBERS CHRISTOPHER A [US], et al) [A] 1-13 * paragraph [0029] * * paragraph [0034] - paragraph [0058] *; | [A]US2007063860 (ESCOBOSA MARCUS [US], et al) [A] 1-13 * paragraph [0015] * * paragraph [0047] - paragraph [0057] * * paragraph [0064] - paragraph [0065] * | by applicant | WO0039772 | US6211870 | US6587067 | US20060357681 |