EP3290796 - METHOD FOR CONTROLLING A FUEL/AIR RATIO IN A HEATING SYSTEM AND A CONTROL UNIT AND A HEATING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.12.2021 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 25.12.2020 | ||
Former | Grant of patent is intended Status updated on 06.08.2020 | ||
Former | Examination is in progress Status updated on 19.07.2019 | ||
Former | Request for examination was made Status updated on 14.09.2018 | ||
Former | The application has been published Status updated on 02.02.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2018/10] | For all designated states Robert Bosch GmbH P.O. Box 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
Snijder, Ab Grift 2 8051 JH Hattem / NL | 02 /
Koudijs, Jan Groen van Prinstererlaan 49 3771 CC Barneveld / NL | 03 /
Westra, Jan J.G. van Arkstraat 1 8181 MG Heerde / NL | [2018/10] | Application number, filing date | 17185688.3 | 10.08.2017 | [2018/10] | Priority number, date | DE201610216613 | 02.09.2016 Original published format: DE102016216613 | DE201710204012 | 10.03.2017 Original published format: DE102017204012 | [2018/10] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3290796 | Date: | 07.03.2018 | Language: | DE | [2018/10] | Type: | B1 Patent specification | No.: | EP3290796 | Date: | 27.01.2021 | Language: | DE | [2021/04] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.01.2018 | Classification | IPC: | F23N1/00, F23N5/12 | [2018/10] | CPC: |
F23N1/002 (EP);
F23N5/123 (EP);
F23N2227/20 (EP);
F23N2233/08 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/42] |
Former [2018/10] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR KONTROLLE EINES BRENNSTOFF-LUFT-VERHÄLTNISSES IN EINEM HEIZSYSTEM SOWIE EINE STEUEREINHEIT UND EIN HEIZSYSTEM | [2018/10] | English: | METHOD FOR CONTROLLING A FUEL/AIR RATIO IN A HEATING SYSTEM AND A CONTROL UNIT AND A HEATING SYSTEM | [2018/10] | French: | PROCÉDÉ DE COMMANDE D'UN RAPPORT AIR-COMBUSTIBLE DANS UN SYSTÈME DE CHAUFFAGE ET UNITÉ DE COMMANDE ET SYSTÈME DE CHAUFFAGE | [2018/10] | Examination procedure | 10.08.2017 | Date on which the examining division has become responsible | 31.08.2018 | Amendment by applicant (claims and/or description) | 07.09.2018 | Examination requested [2018/42] | 24.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 20.11.2019 | Reply to a communication from the examining division | 07.08.2020 | Communication of intention to grant the patent | 09.12.2020 | Fee for grant paid | 09.12.2020 | Fee for publishing/printing paid | 09.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 28.10.2021 | No opposition filed within time limit [2022/01] | Fees paid | Renewal fee | 02.09.2019 | Renewal fee patent year 03 | 31.08.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.08.2017 | AL | 27.01.2021 | CY | 27.01.2021 | CZ | 27.01.2021 | DK | 27.01.2021 | EE | 27.01.2021 | ES | 27.01.2021 | FI | 27.01.2021 | HR | 27.01.2021 | IT | 27.01.2021 | LT | 27.01.2021 | LV | 27.01.2021 | MC | 27.01.2021 | MK | 27.01.2021 | MT | 27.01.2021 | NL | 27.01.2021 | PL | 27.01.2021 | RO | 27.01.2021 | RS | 27.01.2021 | SE | 27.01.2021 | SI | 27.01.2021 | SK | 27.01.2021 | SM | 27.01.2021 | BG | 27.04.2021 | NO | 27.04.2021 | GR | 28.04.2021 | IS | 27.05.2021 | PT | 27.05.2021 | IE | 10.08.2021 | LU | 10.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | LI | 31.08.2021 | [2024/41] |
Former [2024/22] | HU | 10.08.2017 | |
AL | 27.01.2021 | ||
CY | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
MK | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/30] | HU | 10.08.2017 | |
AL | 27.01.2021 | ||
CY | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/29] | HU | 10.08.2017 | |
AL | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/35] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/34] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/23] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
LU | 10.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/21] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/18] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2022/13] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2022/10] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2022/08] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2022/07] | AL | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/50] | CZ | 27.01.2021 | |
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/49] | CZ | 27.01.2021 | |
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/48] | CZ | 27.01.2021 | |
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/46] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/42] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/39] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/38] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/37] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
RS | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/36] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/35] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
NO | 27.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/33] | FI | 27.01.2021 | |
LT | 27.01.2021 | ||
NO | 27.04.2021 | ||
PT | 27.05.2021 | Documents cited: | Search | [XI]DE102010055567 (BOSCH GMBH ROBERT [DE]) [X] 1,3,5-10 * paragraphs [0011] , [ 0016] , [ 0018] , [ 0021] , [ 0023] , [ 0028] , [0029] , [ 0036]; figures 1-4 * [I] 2; | [A]DE102004004065 (VAILLANT GMBH [DE]) [A] 1,2 * paragraphs [0017] , [ 0018] , [ 0021]; figures 1,2 *; | [A]EP1923635 (BOSCH GMBH ROBERT [DE]) [A] 1 * column 2, line 44 - line 50 * | Examination | DE19831648 | EP3156729 | EP0770824 |